Loading...
MILLER PT BK 5 LT 7A-1 - ZCP 2/4/2011Kodiak Island Borough Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 Ph. (907) 486 - 9362 Fax (907) 486 - 9396 http://www.kodiakak.us Zoning Compliance Permit Print Form 11 11111 21707 1 Submit by Email 11 Permit No. BZ2011 -034 Property Owner / Applicant: Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: Street Address: The following information is to be supplied by the Applicant: De LaCruz,S &R 4410 E. Rezanof Dr., Kodiak, AK 99615 907.486.4410 Miller Pt Bk 5 Lt 7A -1 4410 E. Rezanof Dr Use & Size of Existing Structures: SFR Description of Proposed Action: 'Detc'd acc bld'g (16' x 20') Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: ZONING: R -2 Prop_ID 21707 Lot Area: 10,066 Lot Width: 60' BId'g Height: 25' Front Yard: 25' Rear Yard: 10' Side Yard: 5' Prk'g Plan Rvw? No # of Req'd Spaces: 3 Plat / Subdivision Requirements? Does the project involve an EPA defined facility? N/A If YES, do you have an EPA Return Receipt of Notification? "Permit will not be issued until receipt is submitted to KIB" N/A Coastal Policy Residential Subd Case No. Driveway Permit? Septic Plan Approval: Fire Marshall: Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. l agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan List Other: Date: Jan 31, 2011 Signature: Saul De La Cruz This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. "EXPIRATION. A zoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KIBC 17.03.060. ** CDD Staff Certification Consistent? Yes Plat No. Attachment? Bld'g Permit No. Date: Jan 31, 2011 CDD Staff: 4W Martin Lydick Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 Fee Schedule Less than 1.75 acres $30.00 Construction Disposal Deposit Payable in Cashier's Office Room # 104 D Kodi m Isle rot e Ulud Uepar me, Fee Schedule 05/05/2005 14 :51 2065740044 GVM PAGE 16 It I1 W — --- � . � .� 1 • r,. YI s„+: aw i s r.• »rn + • �„r.w� 1�1.T � + t { Y • a� ' , 16 ... �; 1 RILL €; "' K Lt I T- r � I � v b1 S:J + Met 4OOL 'use OS'61^'wv )oluo� onw wwlonv —1, nni .nom