Loading...
LEES SUB LT 1 - ZCP 2/2/2011Kodiak Island Borough Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 Ph. (907) 486 - 9362 Fax (907) 486 - 9396 http://www.kodiakak.us Zoning Compliance Permit Print Form 1111 1 16407 1 11 Permit No. CZ2011 -068 Submit byErnal 1 Property Owner / Applicant: Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: Street Address: The following information is to be supplied by the Applicant: Jim Ashford 2521 Selief Ln, Kodiak, AK 99615 907.539.1298 Lee's Subdivision Lot 1 2572 Selief Ln Use & Size of Existing Structures: Vacant Description of Proposed Action: - Mini Storage (x 3 bld'gs) Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Lot Area: Front Yard: Not Applicable ZONING: Retail Bus Prop_ID 16407 Lot Width: Bld'g Height: 50' Rear Yard: Not Applicable ' Side Yard: Not Applicable Prk'g Plan Rvw? Yes # of Req'd Spaces: 3 Plat / Subdivision Requirements? Does the project involve an EPA defined facility? site plans details 14 prk'g spacing w/ additional area set aside for future prk'g N/A If YES, do you have an EPA Return Receipt of Notification? "Permit will not be issued until receipt is submitted to KM" N/A Coastal Policy Business Consistent? Yes Attachment? Subd Case No. Plat No. Driveway Permit? Septic Plan Approval: Fire Marshall: Bldg Permit No. Applicant Certifications I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. i agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan List Other: Date: Feb 2, 2011 Signature: This permit is only for the proposed project as described by the ayplicant. If there arl any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. ** EXPIRATION. A zoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 780 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KIBC 17.03.060. ** CDD Staff Certification Date: Feb 2, 2011 CDD Staff. Payment Verification f Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 Fee Schedule Less than 1.75 acres $30.00 W I Construction Disposal Deposit Payable in Cashier's Office Room # 104 Fee Schedule Not Applicable $0.00 Ih _0 -a 'o _0 ;D M zzzz X rn c: a c c z 9: K r K 0 (D cr) Co ED rrl mmrnm I m ;o ;o X to (D N N N L4 0 0 1 i v 10 m 00 oomm ;a x 0 C o o 0 0 0000 mm 00 mm x 7K m m 00 0 o 7� 7z 0 0 0 0 5 : � ;o m x m 0 n X ;o 0 0 m P3 m m (') o a 0 0 m;o 0 z z o CD (7) 0 U) LO A -4 -4 --1 W OD 0 n co z c:) O OD I R CO 2 � (n � A rn 1 -14 ELECTRICAL EASEMENT 0 0 Co OD 0 offli►melimimBNE O x C) 0 CD ti r? F C30 Him 4� 0 C) o m -0 z 0 (A m i M r4 10 rn (A a m r z m m m C) v r c c C , CD Z CD r r- > m M = =: CD c m A CD c: o a, c: Z 0 ,- 0 C�) CZ = r- ;U rrl o o- , CD �:, c Q) 00 O O offli►melimimBNE 0 CD ti r? (/) C30 Him 4� 0 C) o m -0 z 0 (A m 0. Fir: r4 10 rn (A a c/) r z m m (A v r c c 18n p m r r- m M m m A CD c: offli►melimimBNE 0 CD ti r? (/) C30 4� 0 C) o m -0 z 0 (A m -0 r4 10 rn (A a c/) r z m m offli►melimimBNE i -- Ul (Z) r 00 - * I u 0 > 0 C) C/) — � 0 0 m -P 933 OO c 9D r? o m -0 z 0 (A m -0 r4 10 (A a m r z m m (A v r c c 18n r r- m M m m A CD c: a, c: Z 0 ,- 0 o o- , F 0 — z O O m M ca 0 c 1 5� i -- Ul (Z) r 00 - * I u 0 > 0 C) C/) — � 0 0 m -P 933 OO c 9D