MILLER PT 1ST BK 6 LT 9B - ZCP 1/18/2011Kodiak Island Borough
Community Development Department
710 Mill Bay Rd. Rm 205
Kodiak AK 99615
Ph. (907) 486 - 9362 Fax (907) 486 - 9396
http://www.kodiakak.us
Zoning Compliance Permit
Print Form
11
111
11
1
21841
11
1
11
Permit No. BZ2011 -020
Submi
1
by Em
ail
Property Owner / Applicant:
Mailing Address:
Phone Number:
Other Contact email, etc.:
Legal Description:
Street Address:
The following information is to be supplied by the Applicant:
Lucille Johnson
236 W. Rezanof Drive, Kodiak AK 99615
907 - 539 -6215
Lot 9B, Block 6, Miller Point Sub. 1st Addition
310 Lilly Drive
Use & Size of Existing Structures: Tri -plex
Description of Proposed Action: 2nd story deck 10 by 12 as indicated on attached site plan. (addition to rear of structure)
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
Staff Compliance Review: ZONING: R -3 Prop_ID 21841
Lot Area: 8,882 Square Feet Lot Width: 60' Bld'g Height: 35 '
Front Yard: 25 ' Rear Yard: 10 ' Side Yard: 5 '
Prk'g Plan Rvw? Not Applicable # of Req'd Spaces:
Plat / Subdivision
Requirements?
Does the project involve
an EPA defined facility?
10' utility easement on the northeast side line.
If YES, do you have an EPA Return Receipt of Notification?
N / A "Permit will not be issued until receipt is submitted to KIS" N / A
Coastal Policy Residential
Subd Case No. NA
Driveway NA
Permit?
Septic Plan NA
Approval: _
Fire NA
Marshall:
Attachment? No
: - •- . =
Applicant Certification: 1 hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Site Plan
Date: Sep 21, 2010
Consistent? Yes
Plat No. NA
List Other:
Signature: Lucille Johnson
This permit is only for the proposed project as described by the applicant. (there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
"EXPIRATION. A zoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 17.03.060. ** Z-)
CDD Staff Certification
Date: Sep 21, 2010 CDD Staff: Duane Dvorak
Payment Verification
Zoning Compliance Permit Fee
Payable in Cashier's Office
Room # 104
Fee Schedule
Less than 1.75 acres $30.00
Construction Disposal Deposit
Payable in Cashier's Office
Room # 104
Fee Schedule
Applicable $0.00
1W
i w '! artme t
�tita.r • E 2 l .- -
X
( – .g ' jF - .77 – & i
Z 0
'.nd'hm the imp-- rt.;.Jtb w j ' k"
.-d d. not mrrlap or e --h on 'be F-i—y -.
'h.. no prop— y lying do".
the F-6n in qu ..... .. d 'hu th— — —
-i" Ono m other rWbte � --m,.0 m aid
0