Loading...
MILLER PT 1ST BK 6 LT 9B - ZCP 1/18/2011Kodiak Island Borough Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 Ph. (907) 486 - 9362 Fax (907) 486 - 9396 http://www.kodiakak.us Zoning Compliance Permit Print Form 11 111 11 1 21841 11 1 11 Permit No. BZ2011 -020 Submi 1 by Em ail Property Owner / Applicant: Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: Street Address: The following information is to be supplied by the Applicant: Lucille Johnson 236 W. Rezanof Drive, Kodiak AK 99615 907 - 539 -6215 Lot 9B, Block 6, Miller Point Sub. 1st Addition 310 Lilly Drive Use & Size of Existing Structures: Tri -plex Description of Proposed Action: 2nd story deck 10 by 12 as indicated on attached site plan. (addition to rear of structure) Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: ZONING: R -3 Prop_ID 21841 Lot Area: 8,882 Square Feet Lot Width: 60' Bld'g Height: 35 ' Front Yard: 25 ' Rear Yard: 10 ' Side Yard: 5 ' Prk'g Plan Rvw? Not Applicable # of Req'd Spaces: Plat / Subdivision Requirements? Does the project involve an EPA defined facility? 10' utility easement on the northeast side line. If YES, do you have an EPA Return Receipt of Notification? N / A "Permit will not be issued until receipt is submitted to KIS" N / A Coastal Policy Residential Subd Case No. NA Driveway NA Permit? Septic Plan NA Approval: _ Fire NA Marshall: Attachment? No : - •- . = Applicant Certification: 1 hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan Date: Sep 21, 2010 Consistent? Yes Plat No. NA List Other: Signature: Lucille Johnson This permit is only for the proposed project as described by the applicant. (there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. "EXPIRATION. A zoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KIBC 17.03.060. ** Z-) CDD Staff Certification Date: Sep 21, 2010 CDD Staff: Duane Dvorak Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 Fee Schedule Less than 1.75 acres $30.00 Construction Disposal Deposit Payable in Cashier's Office Room # 104 Fee Schedule Applicable $0.00 1W i w '! artme t �tita.r • E 2 l .- - X ( – .g ' jF - .77 – & i Z 0 '.nd'hm the imp-- rt.;.Jtb w j ' k" .-d d. not mrrlap or e --h on 'be F-i—y -. 'h.. no prop— y lying do". the F-6n in qu ..... .. d 'hu th— — — -i" Ono m other rWbte � --m,.0 m aid 0