MILLER PT 1ST BK 3 LT 4 - ZCP 9/10/2010Kodiak Island Borough
Community Development Department
710 Mill Bay Rd. Rm 205
Kodiak AK 99615
Ph. (907) 486 - 9362 Fax (907) 486 - 9396
http://www.kodiakak.us
Zoning Compliance Permit
1
Print
Form
111
111
1
11
Submi
7535030040
Permit No. BZ2011 -022
by Erna!
11
111
Property Owner / Applicant:
Mailing Address:
Phone Number:
Other Contact email, etc.:
Legal Description:
Street Address:
The following information is to be supplied by the Applicant:
Petro Star, Inc
P.O. Box 240108, Anchorage AK 99503
907 - 486 -3245
Miller Point 1st Addition, Block 3, Lot 4
3833 E. Rezanof Drive Kodiak, AK 99615
Use & Size of Existing Structures: Commercial Building - 6,150 Square Feet (mixed retail and food service)
Description of Proposed Action: Roof Replacement on main building.
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
Staff Compliance Review:
Lot Area: 1.33 acres
Front Yard: Not Applicable
ZONING: Business
Prop_ID 7535030040
Lot Width: Not Applicable Bldg Height: Not Applicable
Rear Yard: Not Applicable Side Yard: Not Applicable
Prk'g Plan Rvw? Not Applicable # of Req'd Spaces:
Plat / Subdivision
Requirements?
Does the project involve
an EPA defined facility?
NA
N/A
If YES, do you have an EPA Return Receipt of Notification?
"Permit will not be issued until receipt is submitted to KIB"
Coastal Policy Business
Subd Case No. NA
Driveway NA
Permit?
Consistent? Yes
Plat No. NA
Septic Plan NA
Approval: _
Fire NA
Marshall:
Applicant Certification I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner, or as a representative of the property owner. i agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Not Applicable List Other:
Date: Sep 27, 2010 Signature: Ter�DaVis, ati on Manager, Petro Star, Inc.
This permit is only for the proposed project as described by the applicant. if there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
** EXPIRATION: A zoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 17.03.060. **
CDD Staff Certification
Date: Sep 27, 2010 CDD Staff: Duane Dvorak
Payment Verification
Zoning Compliance Permit Fee
Payable in Cashier's Office
Room # 104
ME
Fee Schedule
tm �
n
Less than 1.75 acres $30.00
,. Construction Disposal Deposit
t Payable in Cashier's Office
s ? Room # 104
I Fee Schedule
e
Not Applicable $0.00
Attachment? No
m •-