RUSSIAN CRK BK 3 LT 9A - ZCP 1/18/2011Kodiak Island Borough
Community Development Department
710 Mill Bay Rd. Rm 205
Kodiak AK 99615
Ph. (907) 486 - 9362 Fax (907) 486 - 9396
http://www.kodiakak.us
Zoning Compliance Permit
Prin
Form
11
11
11
1
11
22539
11
Submit by Email
11
Permit No. BZ2011 -016
Property Owner / Applicant:
Mailing Address:
Phone Number:
Other Contact email, etc.:
Legal Description:
Street Address:
The following information is to be supplied by the Applicant:
Ronald & Liz Naughton
P.O. Box 3210, Kodiak Alaska 99615
907 -539 -1741 (Liz) 907 - 539 -1736 (Ron)
Inaughton55@gmail.com
Lot 9A, Block 3, Russian Creek Alaska Subdivision
12216 Noch Drive
Use & Size of Existing Structures: Vacant
Description of Proposed Action: Construction of a new single family dwelling.
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
Staff Compliance Review: ZONING: RR -1 Prop_ID 22539
Lot Area: 43,797 Square Feet Lot Width: 120' Bldg Height: 35'
Front Yard: 25 ' Rear Yard: 20 ' Side Yard: 15
Prk'g Plan Rvw? Yes # of Req'd Spaces: 3
Plat /Subdivision 10' utility easement on the southeastside line and southwea rear lot line.
Requirements?
Does the project involve
an EPA defined facility?
N/A
If YES, do you have an EPA Return Receipt of Notification?
"Permit will not be issued until receipt is submitted to KIB"
N/A
Coastal Policy Residential
Subd Case No. NA
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Pending
Applicant Certification I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Site Plan
Date: Sep 15, 2010
Consistent? Yes
Plat No. NA
List Other:
4 Z
/'
Signature: Ronald or Liz Naughton - O ners ---
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
** EXPIRATION: A zoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 17.03.060. ** s I
CDD Staff Certification
Date: Sep 15, 2010 CDD Staff: Duane Dvorak
Payment Verification
Zoning Compliance Permit Fee
Payable in Cash' is Office
Room ,104
Fee Schedule
Less than 1.75 acres $30.00
Attachment? No
Construction Disposal Deposit
Payable in Cashier's Office
Room # 104
Fee Schedule
Not Applicable $0.00
Pending
NA
W
x CY.
UJ
T
I r
L'i
LO
cn
C L
U
,z
n
4fo
-"j
0)
co
V
ID
0)
ID ✓ Q)
< ra
r- 0
0)
)00 '0 A
OOZZ L
LJ
P
V�
1 p
0
O C,) o',
do
2o
2&
s
r.
Fp
co U)
N LLJ
CfJ 00 C,4
n
.
>
Z
m
V)
1 G
y z
ti
m
z