Loading...
RUSSIAN CRK BK 3 LT 9A - ZCP 1/18/2011Kodiak Island Borough Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 Ph. (907) 486 - 9362 Fax (907) 486 - 9396 http://www.kodiakak.us Zoning Compliance Permit Prin Form 11 11 11 1 11 22539 11 Submit by Email 11 Permit No. BZ2011 -016 Property Owner / Applicant: Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: Street Address: The following information is to be supplied by the Applicant: Ronald & Liz Naughton P.O. Box 3210, Kodiak Alaska 99615 907 -539 -1741 (Liz) 907 - 539 -1736 (Ron) Inaughton55@gmail.com Lot 9A, Block 3, Russian Creek Alaska Subdivision 12216 Noch Drive Use & Size of Existing Structures: Vacant Description of Proposed Action: Construction of a new single family dwelling. Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: ZONING: RR -1 Prop_ID 22539 Lot Area: 43,797 Square Feet Lot Width: 120' Bldg Height: 35' Front Yard: 25 ' Rear Yard: 20 ' Side Yard: 15 Prk'g Plan Rvw? Yes # of Req'd Spaces: 3 Plat /Subdivision 10' utility easement on the southeastside line and southwea rear lot line. Requirements? Does the project involve an EPA defined facility? N/A If YES, do you have an EPA Return Receipt of Notification? "Permit will not be issued until receipt is submitted to KIB" N/A Coastal Policy Residential Subd Case No. NA Driveway Permit? Septic Plan Approval: Fire Marshall: Pending Applicant Certification I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan Date: Sep 15, 2010 Consistent? Yes Plat No. NA List Other: 4 Z /' Signature: Ronald or Liz Naughton - O ners --- This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. ** EXPIRATION: A zoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KIBC 17.03.060. ** s I CDD Staff Certification Date: Sep 15, 2010 CDD Staff: Duane Dvorak Payment Verification Zoning Compliance Permit Fee Payable in Cash' is Office Room ,104 Fee Schedule Less than 1.75 acres $30.00 Attachment? No Construction Disposal Deposit Payable in Cashier's Office Room # 104 Fee Schedule Not Applicable $0.00 Pending NA W x CY. UJ T I r L'i LO cn C L U ,z n 4fo -"j 0) co V ID 0) ID ✓ Q) < ra r- 0 0) )00 '0 A OOZZ L LJ P V� 1 p 0 O C,) o', do 2o 2& s r. Fp co U) N LLJ CfJ 00 C,4 n . > Z m V) 1 G y z ti m z