Loading...
2009-09-24 Work SessionKodiak Island Borough Assembly Work Session Thursday, September 24, 2009, 7:30 p.m., Borough Conference Room Work Sessions are informal meetings of the Assembly where Assembly members review the upcoming regular meeting agenda packet and seek or receive information from staff. Although additional items not listed on the work session agenda are discussed when introduced by the Mayor, Assembly, or staff, no formal action is taken at work sessions and items that require formal Assembly action are placed on regular Assembly meeting agenda. Citizen's comments at work sessions are NOT considered part of the official record. Citizen's comments intended for the "official record" should be made at a regular Assembly meeting. CITIZENS' COMMENTS (Limited to Three Minutes per Speaker) ITEMS FOR DISCUSSION - None. SPECIAL MEETING MANAGER'S COMMENTS CLERK'S COMMENTS MAYOR'S COMMENTS ASSEMBLY MEMBERS COMMENTS ON LEAVE: Branson — September 25- October 6 (Personal) Selby — September 14 -29 (Washington, DC /Personal) Stutes — September 15 -28 (Personal) Kaplan — September 19 -25 (Personal) DATE: Sept 24, 2009 TO: Borough Mayor and Assembly THRU: Rick Gifford, Manager 0) Woody Koning, E/F Director FROM: en Smith, Project Manager RE: Projects Status Report CURRENT PROJECTS STATUS: KODIAK ISLAND BOROUGH ENGINEERING /FACILITIES DEPARTMENT 710 Mill Bay Road Kodiak, AK 99615 (907) 486 -9341 Phone (907) 486 -9394 Fax ksmith@kodiakak.us MEMORANDUM NEW KODIAK POOL The new pool was substantial completed and a temporary Certificate of Occupancy was issued on September 1, just in time for Kodiak Swim Team's first meet. They have since been utilizing the pool for practice. Janssen is currently finishing work on the "punch list" to attain final completion. Commissioning to insure all systems are functioning optimally is scheduled on October 7 -9. City Parks and Recreation will operate the new pool. They have scheduled a Grand Opening on October 8 at which time the pool will be opened to the public. C:\Documents and Settings \jwolfe\Local Settings \Temporary Internet Files\ Content .Outlook \0E39HND5\Project Status Report 090924.docx BAYSIDE FIRE STATION ADDITION Dowland Construction is underway with the new addition to the existing fire station. The project was scheduled to be completed in late October, however problems with the metal building manufacturer have delayed the project several months and the new facility will not be available to store equipment this winter as planned. We have filially received drawings from the building manufacturer and they are currently under review. Dowland is standing by to start foundation work as soon as drawings are approved and a building permit is issued. A revised schedule and completion date will be forthcoming EAST ELEMENTARY WINDOWS SEISMIC UPGRADE/HVAC UPGRADES Wolverine Construction completed the windows seismic upgrade and painting. The cabinet heat and ventilation units are in route and will be installed upon arrival. While there was some inconvenience, we were able to supply temporary heat and occupy the building in time for start of school. OLD HARBOR GYM ADDITION Wolverine Supply has mobilized on site and painting of the main school should be completed this week. The school will retain use of the gym during the school year. A barge is currently in route from Homer with concrete, rebar and equipment needed to begin construction of the addition. The project is scheduled to be completed next summer. OLD POOL ROOF AND VENTILATION UPGRADE Brechan Enterprises was awarded the contract for the roof and air handler replacement. Demolition of the old roof and air handler is complete and the new roof is currently being installed. Unfortunately we have received numerous complaints from occupants as asphalt is used as adhesive for the insulation and the smell from the tar pot has been a problem for some. Fortunately, this portion of the work is within 2 days of completion. This work was scheduled to be completed in September but will extend into October. WOODLAND ACRES PAVING Brechan Enterprises began work on the project September 4. Work includes cleaning ditches, preparing subgrade, raising utilities, and laying D1 base in preparation for paving. Sharatin Road is scheduled for paving next week. Prep work on Puffin, Curlew and Gull continues however fmal paving will likely not be completed until next summer. CHC ADDITION TO PKIMC The project is complete with the exception of issues with the handicap parking. Prochaska and Associates is currently working on a new design that complies with ADA and USDA requirements. KHS UNDERGROUND FUEL TANK REMOVAL AND REPLACEMENT Approximately 1,500 cubic yards of contaminated soil must be removed from stockpiles on site. Tellus, Inc has completed and submitted a work plan to ADEC for approval. I am currently soliciting quotes for trucking and placement of the contaminated material at a site at the east end of Selief Lane. C:\Documents and Settings \jwolfe\Local Settings \Temporary Internet Files\ Content .Outlook \0E391IND5\Project Status Report 090924.docx