Loading...
2008-04-24 Special Meeting1. ROLL CALL Kodiak Island Borough Assembly Special Meeting Agenda Thursday, April 24, 2008 7:30 p.m. Borough Conference Room 2. CITIZENS COMMENTS (Limited to Three Minutes per Speaker) 3. CONSIDERATION OF MATTERS IN THE CALL FOR THE SPECIAL MEETING A. Contract No. FY2008 -31 Kodiak Middle School Seismic Upgrade Phase IL B. Contract No. FY2008 -32 Peterson Elementary Seismic Upgrade. C. Contract No. FY2008 -33 Kodiak High School Library Seismic Upgrade. D. Contract No. FY2008 -34 Approving a Memorandum of Agreement With the State of Alaska Department of Transportation and Public Facilities for Construction of a Portion of the North Star Elementary School Pedestrian Path. 4. ADJOURNMENT This meeting was called by the Mayor. Page 1 of 1 TITLE: Contract No. FY2008 -31 Kodiak Middle School Seismic Upgrade Phase II. SUMMARY: Kodiak Island 3.16.020 "Limitation on Manager's Authority" states that a contract exceeding $25,000 requires Assembly approval. This Contract is for work at the Kodiak Middle School shown on the construction documents prepared by Jensen Yorba Lott, Inc. titled "Kodiak Middle School Seismic Upgrade ", dated April 27, 2007, and includes structural, mechanical, electrical, and architectural work. The Construction Documents, Bid Documents and associated Addenda are available for review. A Bid Tabulation is attached. Phase I of this Project was completed November 2007. Phase II will include seismic upgrades to the one -story section as well as improvements to the interior /exterior walls of the second story section. Roof replacement of areas not completed in Phase I, including the gym will be accomplished in Phase II along with floor covering replacement as necessary. The Project is funded in part by monies from a FEMA PDM -c Grant; Bond Projects for Floor Covering Replacement and KHS /KMS Roof Upgrade; and Legislative funds. Additional funding sources are to be identified. The E/F Department has reviewed the bids and recommends that a Contract for Seismic Upgrades at the Kodiak Middle School be awarded to Brechan Enterprises Inc. in an amount not to exceed $2,973,688.54. This amount includes the Base Bid and Alternates 1 -5 for Phase II work only. Phase III is to be re -bid at a later date. FISCAL NOTES: Account No.: Amount Budgeted: Expenditure Required: APPROVAL FOR AGENDA: Lie KODIAK ISLAND BOROUGH AGENDA STATEMENT April 24, 2008 Special Meeting ITEM NO: 3.A RECOMMENDED MOTION: Move to authorize the manager to execute Contract No. FY2008- 31 Kodiak Middle School Seismic Upgrade Phase II with Brechan Enterprises, Inc. in the amount not to exceed $2,973,688.54. I ie}ol • (Base +Alt`s)_ 1 (aad) Interior Improvments East o f Grid Line K 1 tr#.I1v w 0 a) 0) N C Q C ■ V Q. ALT. #3 (ADD) O c 1) > c0 _J L 0 O Q ALT. #2 (ADD) C 0 8 o - N 0 a!n v7 y c n Y X 0) 0) G c N C C � .. co 0 O ALT. #1 (ADD) Remove and Replace Gymnasium Roofing a8 JSVB_ GENERAL CONTRACTOR 00 O N C a) 0. 0 c0 00 00 0 N cr) iA '.D lD 01 m N 0 O r{ 01 00 N u1 ri M rl N N N CO m 00 (JD rl N 00 lD 00 0) N M N. 0 N '--4 00 lf) rl 0 O O 0 01 rl O O O 0 N rl 0 O N O O O 0 0 N 00 N 0 0 O 0 N M 0 O N N N N N rl 0 0 0 0 N 00 N 0 0 O 0 N N N N ri O O O 0 0 00 '-4 O O O O O N 'V} O O 0 0 O Lf) M O O O 0 0 O 1) ) M 1 O O O 0 O rl 01 N 0) 0) 0 Bid Tabulation Base + Alts KMS SEISMIC UPGRADE PHASE II PROJECT BUDGET Budget Balance Base + Alt 1 -5 Base + Alt 1 -4 Total 1,930,069 3,391,058 1,880,153 Variance 1,460,989 (49,916) KODIAK ISLAND BOROUGH AGENDA STATEMENT April 24, 2008 Special Meeting TITLE: Contract No. FY2008 -32 Peterson Elementary Seismic Upgrade. ITEM NO: 3.B SUMMARY: Kodiak Island 3.16.020 "Limitation on Manager's Authority" states that a contract exceeding $25,000 requires Assembly approval. This Contract is for the Seismic Upgrades to Peterson Elementary School as shown on construction documents prepared by Jensen Yorba Lott, Inc. The Construction Documents, Bid Documents and associated Addenda are available for review. The Project is expected to be partially funded by a pending FEMA HMGP Grant in the amount of $540,508.00. Bids were received in response to KIB's Invitation to Bid dated March 2008. A Bid Tabulation is attached. The E/F Department has reviewed the bids and recommends that a Contract for the Peterson Elementary Seismic Upgrade Project be awarded to Wolverine Supply of Wasilla, Alaska in an amount not to exceed $537,000.00. This includes the Base Bid and Alternates 1 and 2. FISCAL NOTES: Account No.: Amount Budgeted: Expenditure Required: APPROVAL FOR AGENDA: RECOMMENDED MOTION: Move to authorize the manager to execute Contract No. FY2008- 32 Peterson Elementary Seismic Upgrade with Wolverine Supply in the amount not to exceed $537,000. Peterson Elementary Seismic Upgrade Bid Tabulation Bid Opening: 1 2 3 Wolverine Supply of Est Janssen Contracting Co. Inc Diff (Low) % Diff (Low) % of Est Brechan Entrerprises Inc Diff (Low) % Diff (Low) % of Est 4/10/08 $ 473,000 125% $ 511,678 $ 38,678 108% 135% $ 710,959 $ 237,959 150% 187% 3:00 PM orir� are' ►pia' ywtit Jinyl Tile Flooring $ 10,000 82% 13,748 3,748 137% 113% $ 11,310 1,310 113% 93% $ 54,000 173% $ 63,070 9,070 117% 202% $ 38,186 $ (15,814) 71% 122% Estimate $ 379,527I $ 12,195 I $ 31,174 $ 537,000 127% $ 588,496 $ 51,496 110% 139% $ 760,454 $ 223,454 142% 180% $ 422,896 Peterson Seismic Upgrade Revised Budget Current Expenses % of Budget Revised Budget LTD Const Increase Budget 1 Administration 10889 6.0% 32220 32220 2 Land 21 0 3 Site Investigation 0 4 Design Services 50841 10% 53700 53700 5 Construction 540508 100% -3508 537000 6 Equipment 6 0.5% 2685 2685 7 Contingency 6% 3222 32220 Total 61758 122.5% 1,117317 657825 KODIAK ISLAND BOROUGH AGENDA STATEMENT April 24, 2008 Special Meeting TITLE: Contract No. FY2008 -33 Kodiak High School Library Seismic Upgrade. ITEM NO: 3.0 SUMMARY: Kodiak Island 3.16.020 "Limitation on Manager's Authority" states that a contract exceeding $25,000 requires Assembly approval. This Contract is for the Seismic Upgrade to the KHS Library as shown on construction documents prepared by Jensen Yorba Lott, Inc. The Construction Documents, Bid Documents and associated Addenda are available for review. The Project is funded in part by a FEMA HMGP Grant in the amount of $455,508.00. Additional funding sources to be identified. Bids were received in response to KIB's Invitation to Bid dated March 2008. A Bid Tabulation is attached. The E/F Department has reviewed the bids and recommends that a Contract for the KHS Library Seismic Upgrade Project be awarded to Janssen Contracting Co., Inc. of Anchorage, Alaska in an amount not to exceed $550,700.00. FISCAL NOTES: Account No.: 410 523 452 150 05026 5 Amount Budgeted: Expenditure Required: APPROVAL FOR AGENDA: RECOMMENDED MOTION: Move to authorize the manager to execute Contract No. FY2008- 33 Kodiak High School Library Seismic Upgrade with Janssen Contracting Co., Inc in the amount not to exceed $550,700.00. KHS Library Seismic Upgrade Bid Tabulation Bid Opening: 4/14/08 3:00 PM � � � � � 3 �� ��° � ; i�� �ii� :: ��.�. n� ,.�3. �� � � ��`�}R "�`(�'��: ��� — �� � � �� z �� s � � � �. � � 1 ,� a� � � ' = , 3 I � y � y � , : : .. _ � ( ¢���(����k �'. L � * - 3 �. � ��� � � � � � y� K.� $� §. � 'a.t�:����e:�L���*`,, s�h � ,,, ..�ji � � . � '.,. �.1i'%- - `� �. b � _ �� 1 Janssen Contracting Co. Inc 550,700 550,700 % Of JYL ESt 1089'0 2 Brechan Enterprises, Inc 652,024 � Diff (Low) 101,324 9'o Diff (Low) 118�0 % of 1YL E5t 128% 3 Wolverine Supply 797,000 Diff (Low) 246,300 % Diff (Low) 1459�0 % of JYL Est 156% JYL Estimate $ 510,233 Eidenger Estimate $ 334,050 KHS Library Seismic Upgrade Revised Budget Current Expenses % of Budget Revised Budget LTD Const Increase Budget 1 Administration 10110 3765 6.0% 22932 33042 2 Land 0 3 Site Investigation 0 4 Design Services 46562 32173 10% 8508 55070 5 Construction 408946 100% 141754 550700 6 Equipment 3 0.5% 2754 2754 7 Contingency 6% 042 33042 Total 465618 35941 122.5% 208990 674608 TITLE: Contract No. FY2008 -34 Approving a Memorandum of Agreement With the State of Alaska Department of Transportation and Public Facilities for Construction of a Portion of the North Star Elementary School Pedestrian Path. SUMMARY: The Kodiak Island borough and the State of Alaska will be entering into a memorandum of agreement (MOA) to allow the state to design and construct a portion of the pedestrian trail to North Star Elementary school. Approval of this contract will give the manager the authority to sign and start this important improvement. The state will add this project to an existing contract they have with one of the construction firms they are working with. The section of the trail that will be constructed has been identified by the North Star PTA and the School District as the most dangerous stretch along the proposed trail. The project will be paid for by the federal earmark received for this project and the local match. Unfortunately, this may be all that is done with the Federal Earmark. The program that the earmark is tied to no longer exists, so any remaining money will go back to D.C. FISCAL NOTES: Account No.: 410- 527 -452 -150 -6 Amount Budgeted: $110,331 Expenditure Required: APPROVAL FOR AGENDA: %: c4 KODIAK ISLAND BOROUGH AGENDA STATEMENT April 24, 2008 Special Meeting ITEM NO. 3.D RECOMMENDED MOTION: Move to authorize the manager to execute Contract No. FY2008- 34 with the State of Alaska, Department of Transportation and Public Facilities in the amount not to exceed $110,331. STATE OF ALASKA DEPARTMENT of TRANSPORTATION & PUBLIC FACILITIES CENTRAL REGION Federal Project No: TBD MEMORANDUM OF AGREEMENT Project: Kodiak Island Roads (North Star Student Safety Access Project) This AGREEMENT, is made and entered into this day of , 2008 between the State of Alaska, acting by and through the Depart nt of Transportation and Public Facilities, hereinafter called the DEPARTMENT, and � 'pdiak Island Borough, hereinafter called the BOROUGH. The DEPARTMENT and the BOROUG construct a short segment of ne at Drive crosses Island Lake Cr State Project No: 58159 interest of the public, propose to e guardrail on the curve where Lilly re to as the PROJECT. The DEPARTMENT and the BOR y agree to the following: 1. SCOPE OF WORK This PROJECT will construct a short segment of new pathway behind the guardrail on the curve where Lilly Drive crosses Island Lake Creek. The preliminary engineering / design of the subject project will be accomplished by the DEPARTMENT in conformance with FEDERAL HIGHWAY ADMINISTRATION requirements as well as accepted standards of the State of Alaska and the DEPARTMENT. The PROJECT is located within BOROUGH -owned right -of -way, and will be maintained by the BOROUGH per Section 5. PROJECT MAINTENANCE below. 2. RIGHT OF WAY and UTILITIES The BOROUGH believes that adequate public right -of -way exists to contain the PROJECT and its construction. The DEPARTMENT will map the existing right -of -way and certify that the PROJECT is contained within the existing right -of -way. Kodiak Island Road (North Star Student Safety Access Project) Memorandum of Agreement Page 1 Utility facilities are known to exist within the proposed PROJECT right -of -way corridor. The DEPARTMENT will coordinate with the appropriate utility companies and prepare utility agreements covering the disposition of utility facilities. The design and construction of utility relocations, if required by the project, will be accomplished by the appropriate utility company on a reimbursable basis. Any utility companies performing relocation activities as a result of this project will be reimbursed by the DEPARTMENT for all actual costs up to an agreed upon budget. 3. DESIGN & CONSTRUCTION FUNDING A. Federal Funding: Funding for the PROJECT design and construction is from a FFY 2005 National Corridor Planning and Border Development Program earmark in the amount of $1,300,000. This program is no longer active and the funds will be pulled back unless obligated by September 30, 2008. After accounting for federal overhead costs, the will be a maximum of $1,111,500 of the total 90.97 %, the total maximum budget is $1,221,$ The remaining funds, $110,331 ($1,22 provided through local match. B. Local Match The BOROUGH agrees t DEPARTMENT to fulfill its The total available federal fully expended to complet contingency for balancing Federal Funding Local Match Additional Contribution Total: $1,111,500 $ 110,331 $ (TBD if required) $1,221,831 Kodiak Island Road (North Star Student Safety Access Project) Memorandum of Agreement Page 2 ral participation in the PROJECT At a federal participation rate of ,221,831 x 0.9097 = $1,111,500). 1,111,500 = $110,331) must be ,331, as discussed in 3a. above, to the tc '`" obligation upon execution of this agreement. to this project are fixed and are anticipated to be PROJECT, therefore this amount does not include a tential cost over runs in the final project cost. C. Additional BOROUGH Contribution Upon PROJECT completion and final PROJECT closeout, actual Construction Phase cost will be compared to the total construction funding available to the PROJECT through this Agreement. The BOROUGH agrees to provide additional project funding to the DEPARTMENT, in the event that there are any cost overruns. Payment will be made by amendment to this agreement. D. Summary All funds designated in part 3b. shall be appropriated to the DEPARTMENT prior to funding obligation. Total payments are summarized as follows: 4. PROJECT MANAGEMENT The construction contract will be between the DEPARTMENT and the construction contractor. The DEPARTMENT's Construction Project Manager is in responsible charge, and will monitor the contractor's work and progress through their on -site Project Engineer for the duration of the PROJECT through final records approval. The BOROUGH's Project Manager shall also designate a BOROUGH PROJECT person to act as their On -site Coordinator (OSC) and to represent the BOROUGH. S /he shall be the single - point -of- contact between the Project Engineer and the BOROUGH. This person shall be responsible for keeping all branches of the BOROUGH informed of any increased bid quantities or potential contract changes that could adversely affect the contract price or the functionality of the facility after final acceptance by the BOROUGH. After the OSC has briefed the BOROUGH, their Project Manager will prepare a Letter of Non - objection to be appende : • e contract change document. 5. PROJECT MAINTENANCE WHEREAS, A.S.19.20.060 a into agreements for construc their respective jurisdictions, WHEREAS, the DEPART PROJECT, located within t planning, design and const Kodiak Island Road (North Star Student Safety Access Project) Memorandum of Agreement Page 3 ENT and the BOROUGH to enter and ownership of public ways within s t e authority to plan, design, and construct the u' "daries of the BOROUGH, including but not limited to on of pathway improvements; and WHEREAS, the BOROUGH has reviewed and concurs in the location of the PROJECT, and WHEREAS, Federal transportation funds will be used in the design and construction of the PROJECT, and WHEREAS, the Federal Highway Administration holds the DEPARTMENT responsible to maintain, or cause to be maintained, any project constructed with Federal aid transportation funding. IT IS THEREFORE AGREED by the parties, in consideration of the mutual promises contained in this Agreement, as set forth below, regarding the planning, design, construction, maintenance, and operation of the PROJECT. The BOROUGH, agrees to assume full and complete ownership of, and responsibility for, the operation, maintenance, and administration of the PROJECT, upon completion of construction. A. Property Management The BOROUGH agrees that its management of the right of way is subject to the provisions of 23 CFR §1.23 for the PROJECT's life, which is 20 years, commencing upon the substantial completion of the construction of the PROJECT. The BOROUGH may not allow any encroachment within the right of way of the PROJECT without the prior consent of the DEPARTMENT and the Federal Highway Administration. The BOROUGH may not sell any portion of the right of way without the prior consent from the DEPARTMENT and the Federal Highway Administration. In the event that the DEPARTMENT and the Federal Highway Administration give their consent to the disposal of any portion of the right of way for the PROJECT, the BOROUGH shall pay proceeds of the sale to the DEPARTMENT, which the DEPARTMENT will credit to the appropriate federal aid accounts. B. Maintenance and Operations a) The BOROUGH agrees to maint ¢ d operate the PROJECT for the PROJECT's design life, wh ckt 0 years, commencing upon the substantial completion of the u ,n of the PROJECT. b) The BOROUG =" �o '' .. fain and operate the PROJECT consistent with 23 CF's „� e DEPARTMENT's Alaska Highway Maintenance - off. = -t ° s Manual (AHMOM). c) The BOROU ' „a hall perform its activities under this Agreement at its sole cost ; =' d expense and without reimbursement from the DEPARTMENT. These maintenance activities include, but are not limited to: 1) Planning, scheduling, administration, and logistics of maintenance activities; 2) Traffic control and safety; 3) Preservation of drainage in an as -built condition, including maintenance of all culverts, ditches, storm sewers, gutters, dry wells, and under - drains; 4) Embankment protection, including erosion control, to as -built conditions; 5) Roadside management; 6) Snow and ice removal; 7) Snow and ice control, including all plowing, sanding, snow hauling, ice scraping, drift control, snow slide removal, and associated tasks as may be required for the safe and timely passage of the public; Kodiak Island Road (North Star Student Safety Access Project) Memorandum of Agreement Page 4 C. Dispute Resolution a) Except for disputes for third party claims related to the property management, in the event of a dispute under this agreement that the parties cannot resolve within 45 days, the DEPARTMENT and the BOROUGH each agree that they shall each appoint an arbitrator, who between, them shall agree to the appoi tment of a third arbitrator. 6. INDEMNIFICATION 8) Maintaining signs and delineators in an as -built condition and their replacement, including posts and foundations, when damaged, unreadable, or worn out; 9) Removal of debris, rubbish, and dead animals; 10) Annual crack sealing; 11) Repairs of minor rutting, waves, sags, humps, corrugations, raveling, alligator cracks, pitting, and bleeding on a regular basis; and 12) Minor bridge repairs, which includes painting of localized rust areas, re- decking, and repair of guardrail and railing sections. b) The arbitrators may conduct s ceedings, as they believe are necessary to resolve the matter them. They may, in the exercise Y Y of their discretion, proceed o ,' •: d. c) Each party shal any arbitrator they appoint. The party against w t c tendered shall pay the costs of the third arbitrator, as w es incurred in the conduct of any hearing on the dispute d) The arbitrato ecision of a matter before them is final and may only be changed or modified under the provisions of AS 9.43120 and AS 9.43.130. e) Except when the provisions of this paragraph provide otherwise, any arbitration under this paragraph is subject to AS 09.43.010 through 09.43.180, the Uniform Arbitration Act. f) A decision by the Federal Government denying, or limiting, federal participation in project costs may not be arbitrated under this Agreement. The BOROUGH may only pursue such claims under federal law and procedure. The BOROUGH shall hold the DEPARTMENT, its officers, employees, and agents (collectively "the DEPARTMENT ") harmless from and defend and indemnify the DEPARMENT for liability, claims, or causes of action arising out of this AGREEMENT Kodiak Island Road (North Star Student Safety Access Project) Memorandum of Agreement Page 5 or relating to the property and facilities being deeded and the obligations being assigned. Notwithstanding the foregoing, the BOROUGH shall have no obligation to hold harmless and indemnify the DEPARTMENT to the extent the DEPARTMENT is determined to be liable for its own acts or omissions, except that: To the maximum extent allowed by law, the BOROUGH shall hold the DEPARTMENT harmless from and indemnify the DEPARTMENT for liability, claims, or causes of action arising from an alleged defect in the design or construction of facilities existing on the premises at the date of this grant, regardless of negligence or other fault, if such liability, claim, or cause of action arises out of an incident that occurs more than two years after the BOROUGH assumes maintenance responsibilities for the facilities. The BOROUGH's duty to defend shall apply regardless of whether it is also alleged that the DEPARTMENT's acts or omissions contributed to the injury (including injury to personal property, real property or persons, including fatal injury). 7 TERMINATION Neither liability, claims or causes of action arisin the date of this transfer nor liabilities imposed from or asserted under AS46.03.822 shall Kodiak Island Road (North Star Student Safety Access Project) Memorandum of Agreement Page 6 injuries which occurred prior to aims or causes of action arising ed by this paragraph. If due to changed circum .. sA th r EPARTMENT or the BOROUGH wishes to terminate this Agreement pia & I ` completion, the initiating party shall notify the other party in writing of its yeas, for requesting early termination. This request must be made at least fifteen (15) -ays prior to the proposed termination date. If both parties agree that it is in their mutual best interest to terminate this Agreement early, all finished or unfinished documents and other materials shall, at the option of the DEPARTMENT, become the DEPARTMENT's property. If the Agreement is terminated as provided herein, the BOROUGH shall be reimbursed for these actual expenses not otherwise reimbursed under this Agreement which were incurred by the BOROUGH during the Agreement period and which are directly attributable to the BOROUGH's performance of this Agreement. If the Agreement is terminated as provided herein, the DEPARTMENT shall also reimburse the BOROUGH in honoring convenience termination clauses in the Agreement with its contractors as long as these clauses conform to the standard convenience termination clauses used by the DEPARTMENT for similar type contracts. AGREED and SIGNED BY: KODIAK ISLAND BOROUGH DEPARTMENT OF TRANSPORTATION & PUBLIC FACILITIES Approved: Borough Manager Or Authorized Designee Fund Certification: Appro Karl Short Finance Director Recommend: Date Cynthia Ferguson, P.E. Date Project Manager Central Region teven R. Horn, P.E. Date Director, Construction and Operations Central Region Kodiak Island Road (North Star Student Safety Access Project) Memorandum of Agreement Page 7 BY: SECOND: ‘6-- f�l cx‘i Sil " BY: 1 SECOND: J BY: ic SECOND: 0 ,., .ob BY: VD SECOND: ic ,- 0 BY: SECOND: u5 A Yes No Yes No Yes No Yes No Yes No Mr. Abell / Mr. Abell -e' ±, Mr. Abell Mr. Abell ✓ Mr. Abell V Ms. Branson V Ms. Branson '4./ . Ms. Branso' �/ Ms. Branson V Ms. Branson V Mr. Friend V Mr. Friend 1 Mr. Friend (,l Mr. Friend *" Mr. Friend V � Ms. Jeffrey V Ms. Jeffrey V Ms. Jeffrey t/ Ms. Ms. Jeffrey r Ms. Jeffrey '/ Ms. Lynch V Ms. Lynch V Ms. Lynch V Ms. Lynch V Ms. Lynch V Mr. Oswalt V Mr. Oswalt V/ Mr. Oswalt 1 Mr. Oswalt V Mr. Oswalt V Ms. Stutes V Ms. Stutes V Ms. Stutes f Ms. Stutes V Ms. Stutes V DOES ANYONE WISH TO CHANGE THEIR VOTE? 0 TOTAL TOTAL q D TOTAL 9 D TOTAL 1 () TOTAL Ti In case of a tie In case of a tie In case of a tie In case of a tie In case of a tie Mayor Selby V Mayor Selby Mayor Selby Mayor Selby Mayor Selby Regular Special ✓ Convened: : 0 KODIAK ISLAND BOROUGH ASSEMBLY ROLL CALL SHEET Date: 4/x'4 I 0 Z Adjourned: CI /assembly /roll call sheet 5: m G Z 0 W H I ON saA Ilagd 'a W Ms. Branson Mr. Friend Ms. Jeffrey Ms. Lynch Mr. Oswalt Ms. Stutes TOTAL In case of a tie Mayor Selby 5: m G z 0 W N 0 N saA 'logy 'a W Ms. Branson Mr. Friend Ms. Jeffrey Ms. Lynch Mr. Oswalt Ms. Stutes IGE THEIR VOTE? TOTAL IIn case ofatie Mayor Selby >' CO G Z 0 W H ON I SeA NVH Ilagv 'aW Ms. Branson Mr. Friend Ms. Jeffrey Ms. Lynch Mr. Oswalt Ms. Stutes NYONE WISH TO C TOTAL In case of a tie Mayor Selby 5: m c z 0 W N ON SeA 0 D IV S30a Mr. Abell Ms. Branson I Mr. Friend J Ms. Jeffrey Ms. Lynch wMSO 'aW Ms. Stutes TOTAL In case of a tie Mayor Selby \--) m oN I saA I g Z 0 W N Mr. Abell Ms. Branson Mr. Friend Ms. Jeffrey Ms. Lynch Mr. Oswalt Ms. Stutes 1 TOTAL In case of a tie Mayor Selby v f0 0 KODIAK ISLAND BOROUGH ASSEMBLY ROLL CALL SHEET Cl/assembly/roll call sheet 1. ROLL CALL Kodiak Island Borough Assembly Special Meeting Guidelines April 24, 2009, 7:30 p.m., Borough Conference Room KIBC 2.16.070.... the Chair shall cause the record to reflect the absence of the member, the REASON for the absence, and whether the absence is excused by the Assembly. Recommended motion: Move to specifically excuse any Assembly members that are absent. VOICE VOTE ON MOTION 2. CITIZENS' COMMENTS (These are limited to three minutes per speaker.) A. Agenda items not scheduled for public hearing and general comments. ASK SPEAKERS TO SIGN IN AND STATE THEIR NAME FOR THE RECORD. 3. CONSIDERATION OF MATTERS IN THE CALL FOR THE SPECIAL MEETING A. Contract No. FY2008 -31 Kodiak Middle School Seismic Upgrade Phase II. Recommended motion: Move to authorize the manager to execute Contract No. FY2008 -31 Kodiak Middle School Seismic Upgrade Phase II with Brechan Enterprises, Inc. in the amount not to exceed $2,973,688.54. Staff Report — Manager Gifford Assembly discussion - Amendments may be offered at this time. ROLL CALL VOTE ON MOTION. B. Contract No. FY2008 -32 Peterson Elementary Seismic Upgrade. Recommended motion: Move to authorize the manager to execute Contract No. FY2008 -32 Peterson Elementary Seismic Upgrade with Wolverine Supply in the amount not to exceed $537,000. Staff Report — Manager Gifford Assembly discussion - Amendments may be offered at this time. ROLL CALL VOTE ON MOTION. Kodiak Island Borough Assembly Guidelines April 24, 2008 Page 1 C. Contract No. FY2008 -33 Kodiak High School Library Seismic Upgrade. Recommended motion: Move to authorize the manager to execute Contract No. FY2008 -33 Kodiak High School Library Seismic Upgrade with Janssen Contracting Co., Inc. in the amount not to exceed $550,700. Staff Report — Manager Gifford Assembly discussion - Amendments may be offered at this time. ROLL CALL VOTE ON MOTION. D. Contract No. FY2008 -34 Approving a Memorandum of Agreement With the State of Alaska Department of Transportation and Public Facilities for Construction of a Portion of the North Star Elementary School Pedestrian Path. Recommended motion: Move to authorize the manager to execute Contract No. FY2008 -34 with the State of Alaska Department of Transportation and Public Facilities in the amount not to exceed $110,331. Staff Report — Manager Gifford Assembly discussion - Amendments may be offered at this time. ROLL CALL VOTE ON MOTION. 4. ADJOURNMENT Recommended motion: Move to adjourn the meeting. ROLL CALL VOTE ON MOTION Kodiak Island Borough Assembly Guidelines April 24, 2008 Page 2