Loading...
2003-20G Amending Resolution 2003-20 Re-Establishing FeesWHEREAS, prudent financial management dictates that an organization review its fees on at least an annual basis; and WHEREAS, Kodiak Island Borough Code 3.04.065 ordains that all fees be reviewed on an annual basis; and WHEREAS, it is recognized that if a service or program benefits only a select individual or group of individuals, those individuals or group of individuals should pay for the service; and WHEREAS, staff has compiled a list of all current fees; and WHEREAS, staff has recommended changes to the current fee schedule for fiscal year 2007 as shown on the attached exhibit; and NOW, THEREFORE, BE IT RESOLVED BY THE ASSEMBLY OF THE KODIAK ISLAND BOROUGH THAT: SECTION 1: The attached exhibit of fees becomes effective July 1, 2008. ATTEST: KODIAK ISLAND BOROUGH RESOLUTION NO. 2003 -20G Introduced by: Manager Gifford Requested by: Finance Director Drafted by: Finance Director Introduced: 06/19/2008 Amended: 06/19/2008 Adopted: 06/19/2008 A RESOLUTION OF THE KODIAK ISLAND BOROUGH ASSEMBLY AMENDING RESOLUTION NO. 2003 -20 TO RE- ESTABLISH FEES OF THE KODIAK ISLAND BOROUGH ADOPTED BY THE ASSEMBLY OF THE KODIAK ISLAND BOROUGH THIS NINETEENTH DAY OF JUNE, 2008 Javier, B rough Clerk , , g k Kodiak Island Borough, Alaska KODIAK ISLAND BOROUGH Jerome M. Selby, Borou Resolution No. 2003 -20G Page 1 of 1 KODIAK ISLAND BOROUGH FEE SCHEDULE Effective July 1, 2008 Page 1 of 13 REPRODUCTION OF BOROUGH RECORDS Copies, per page, general public Copies, per page, government and non - profits POW copies (does,not inotade copy charges))!'! W ` Audio Video Recording Operating & Capital Budget Arnuaf Afigft0,0ciat Report Comprehensive plans, paper 2007 Comprehensive Plan (bound copy) Comprehensive plans, cd BOROUGH CODE OF ORDINANCES Borough Code, Complete Supplement Service (Annual Fee) Title 6, con9Plete' Title 15, complete Title 16, complete Title 17, complete Any of the above titles on CD SPECIAL ASSESSMENT AND PROPERTY TAX FEES Full reproduction of tax map Includes 3' x 5' base map and unbound (complete book by book copies) individual page cop Forecure Fe e Publication Fee (based on prior year publication) Interest Penalty BAYSIDE FIRE STATION COMMUNITY TRAINING CENTER Refundable Cleaning Deposit One -half of Training Center, per half day (1 -6 hrs, max 49 people) One-half of Tralning Center, per day (8-10 hrs, max 49 people) Full Training Center, per half day (1 -6 hrs, max 100 people) Full Training Center, per day (6 -10 hrs, max 100 people) KODIAK FISHERIES RESEARCH CENTER Main Lobby (upstairs /down - fee includes large conference room) Refundable cleaning deposit, main lobby Large conference Room Refundable cleaning deposit, large conference room Small Conference Room Refundable cleaning deposit, smatl conference room ASSEMBLY AND COMMISSION AGENDAS, MINUTES & PACKETS (Annual Mailing Fees) Agenda & Minute Mailing, Assembly Agenda & Minute Mailing, P & Z tsetrty f?aokek C ,mplete Mailing P & Z Packet, Complete Mailing GENERAL SERVICES Wire Transfer Fee NSF Check Fee EteCtronically,Reproduced Records, up to 5 pagan ; y (For documents over 5 pages in length, add $0.25 per page) Monthly Fee for Online Computer Services Borough Building Office Rent for 710 Mil! 't y Rd I°(pt r square foot) Borough Building Annex Building for 610 Egan Way (per square foot) New/Transfer Liquor License hith fllIC1g fee for` s faxes (Severance and Bed) ' f , r, i , i 1 61i d h' a Interest on miscellaneous accounts Passport execution fee per federal guidelines 'l) 30fpape ip $1.10 $1.00 per notice mailed $50 per Ming: 12% annually $25.00 ii actual cost 12% annually 10% charge Page 2 of 13 $0.25 $0.05 $5.00;' $20.00 $0.00 $0,00' $25.00 $100.00 $5.00 $50.00 $50.00 $300.00 $200.00 $125.00 $45.00 .$2.50 $7.50 $10.00 $25.00 $5.00 $400.00 $25.00 $25.00 $6.001 $25.00 $1.85'' $50.00 $15.00 $25.00 $30.00 $50.00 $250.00 $300.00 $b0.00 $50.00 $40.00 00 REPRODUCTION COSTS Large Scale Scanning and Copy Charges Scanning, per page Copy scan file to CD /DVD, per disk Xerox Bond Small 18" x 24" 24" x 24" Standard "x Medium 36" x 36" 36" x 48" Large 36" x 60" 36" x 72" 36" x 84" Xerox Mylar Small 18" x 24" 24" x 24" 24" x Medium 36" x 36" 36" x 48" Large 36" x 60" 36" x 72" 36" x 84" MAPPING AND RESEARCH SERVICES Drafting and plotting services. (1/4 hr minimum) Digitized Data of ArcGIS or Autocad products (per 1 megabyte + cost of disk) 1 i iesearch S®'""iX' °' rds r cqv ry (1 hr's! A ti um ..' Research Service, data analysis (1 hr minimum) PLOTTED MAPS Line drawings Images /Full (0 0(00 P. (ets'- „:bo nd.papg ,, ', Images /Full Color Plots - photo quality paper * No copying or commercial use, except for reference CD copy of aerial photos ADMINISTRATIVE SERVICE FEES: Federal & State Grants Amount of Grant x Percent Up to $100,000 x 3% 00' to 500,000 x 25% 500,000 to 1,000,000 x 2% 1,000,000 and up x 1.5% ACCOUNTING SERVICE FEES Administrative Service Fees TITLE 6: ANIMALS (KIBC 6.04.070) A. License Fees 1) Male dog (per year) 2) 1eni is dog (per year) 3) Neuter and spayed dogs (per year) 4) Duplicate tag (each) B. Boarding Fees 1) Small animals (dogs, cats, etc.)(per day) 2) Large animals (cows, horses, etc.)(per day) C. Animal Control Offenses 1) Cruelty to Animals (KIBC 6.04.010 A -D) a. 1st offense b. 2nd offense c. 3rd offense li! MIL Page 3 of 13 $2.00 $10 $3.00 $4.00 $6,00' $9.00 $12.00 $15.00' $18.00 $21.00 $5.00 $6.00 $8.00 $10.00 $15.00 $20 00 $25.00 $30.00 $40.00 /Hr $0.10 $40.90 /Hr $60.00 /Hr $2.00 /sq ft $4.50 /sq ft $10.00 /sq ft $10.00 /path $10.00 service fee Per grant agreement Up to $ 3,000.00 1x ,50 0.00 $10,000.00 - $20,000.00 15,000.00 and up 3% of entity's budget $35.00 $35.00 $10.00 $5.00 $5.00 $50,00 mandatory court appearance mandatory court appearance mandatory court appearance 2) Contagious animals (KIBC 6.04.020) a. 1st offense i rtdoffen a s ." dP c. 3rd offense 3) Annoying animals (KIBC 6.04.030) a. 1st offense 011e o ffense c. 3rd offense 7) Animal littering (KIBC 6.04.060) a. 1st offense b. 2nd offense c. 3rd offense 4) Tethering (KIBC 6.04.040) a. 1st offense fir; -2nd offense c. 3rd offense 6) Vicious animals (KIBC 6.04.050A) a. 1st offense b. 2nd offense c. 3rd offense 9) Tag and collar (KIBC 6.04.080) a. 1st offense b. 20 offense i iil " c. 3rd offense 5) Control of animals (KIBC 6.04.050BD & KIBC 6.04.180A) a. 1st offense b. 2nd offense c. 3rd offense 8) Animal identification (KIBC 6.04.070) a. 1st offense b. 2nd of# nse ?;; c. 3rd offense D. Miscellaneous Fees 1) Rabies vaccinations deposit (partially refundable) Adoption (includes neuter or spay, rablles "'shot:licens TITLE 16: SUBDIVISIONS (GENERALLY KIBC 16.10.060) Waivers (16.10.050) AbbreviatediAliquot Part Plats Preliminary Plats Creating: 1 to 12 lots Over 50 lots Vacations Appeal to Commission (16.100) R .evielni of#$wZC Decision (16.90 C Appeal to Assembly (16.90) Appeal Record copy, per page ,!I Page 4 of 13 0 $55.00 $82 50 $110.00 $27.50 $55 .00 $82.50 $27.50 $55 - 00 $82.50 $55.00 $82.50 $110.00 mandatory court appearance mandatory court appearance mandatory court appearance $27.50 $55.00 $82.50 $27.50 555.00 $82.50 $27.50 $$,5.0) $82.50 $20.00 actual cost $75.00 $00.00 $350.00 20.00 for each addltional',lo ov+ $350.00 $200.00 $75.00 $200.00 $0.15 $1,110.00 + $15.00 for each additional lot over 50 Plan Review Services: Improvement Plan Review Initial and Final Plan Additir r} t,K v rient "plan Ravi Site Grading Plan Review Materials Approval Services First Submittal Subsequent k eyiews i ' } Inspection Services - General Personnel ST Igrpfir DT Vehicle Hours MIeag9 s4 r.. Administrative Fee Inspection Services - Subdivision Road and Utility Improvement (per lineal ft) Improvements for 1 to 12 lots Improvements for. 13 more P" ZONING Conditional Use Permit (17.04.010 A) Variance (17.040 010 ©) Wirteggeogrogenomog Zoning Change (17.040.010 E): Less than 1.75 acres 1.76 to 5.00 acres 5.01, fo 40 00 acres 40.01 acres or more Other P &ZC Approval (e.g. 17.21.050 C) Appeal to Commission (17.90) Review of P&ZC Decision (11.80) Appeal to Assembly (17.100) Appeal Record Copy, per page Zoning Compliance Permit (17.03.060): After the fact Zoning Compliance Permits Less than 1.75 acres 1.76 to 5.00 acres 5.01 ilt 40,00'acres 40.01 acres or more Construction Dumpster Deposits: less than 250 sq ft 251 to 500 501 or greater sq ft Postponement at Petitioner's request - Public Hearing Item Postponenler at Petitioners request = Nan -Put ic:FCearlrig:lier TITLE 18: BOROUGH REAL PROPERTY Land disposal application (18.20.060 A) ( n41 "00 ,.1nnvaily (18 50 010 C),' , 7 . 011'i1 Wood Cutting Permits Material Sales (18.60) Use Fee (per site, annually) Ikoyaity'fee, percubtc yarrd �� gar roil: Page 5 of 13 aia $200.00 5 $250.00 $200.00 $60.00 $40.00 /hr $66. $72.00 /hr $1.70 /hr $030fmi;` 10% $3.5011f $2.00fif $250.00 $350.00 $750.00 $1,000.00 $1,500.00 $150.00 $350.00 $150.00 $350.00 $0.15 2 x the publish amount $30.00 $60.00 $00,P $120.00 $250.00 $50&00 $1,000.00 $100.00 $25.00 $350.00 $250.00 $25.00 $5,000.00 $1.25 Grading Permit Fees: 50 cubic yards 51 to 100 c.y. 1:01:to 1 O QunnrY i'r 1,001 to 10,000 c.y. 10.00 ;f Q „O tt "e 100,001 c.y. or more ” The fee for a grading permit authorizing additional work to that under a valid permit shall be the difference between the fees paid for the original permit and the fee shown for the entire project. Building Permit Fees value = up to $500.00 value = 2,000.01 - 25,000.00 value =25,000. value = 50,000.01 - 100,000.00 w , e:first $1 00 0 $3.50 fur etch additional fraction thereof, tp and inciudin9 $500,000.00, value value = 500,000.01 to 1,000,000.00 Building Demolition Fee Other inspection fees: Inspections outside of normal business hours (per hour, 2 hr min) R airlspectfonn fees assessed under provisions of section.3Q5 vg Inspections for which no fee is specifically indicated Additional plan review required by changes, additions or revision to approved plans (1/2 hr min) Appeals and Exceptions (15.44) l fa Page 6 of 13 $23.50 $37.00 " $37 Q fo 1st 100 $17 50 f0 a additionai'," 00 cy $194.50 for 1st 1,000 cy + $14.50 for ea additional 1,000 cy $919.00 for 1st 100,000 cy + $36.50 for ea add 10,000 cy $45.00 for the first $2,000 plus $9.00 for each additional $1,000 or fraction thereof, to and including $25,000.00 252.00 for $1,000 $ $414.50 for the first $50,000 plus $4.50 for each additional $1,000 or fraction thereof, to and including $100,000.00 fo Ist „io o 00bcy 2. idditional.10,01 t $25,000,,P1 $ 650 fovea ton thereof', to and includinnl $15.00 IQ uding $2,00000 additional $50,000.00 $2,039.50 for the first $500,000 plus $3.00 for each additional $1,000 or fraction thereof, to and including $1,000,000.00 1.01 a nd up he ,000,000 ptu 1,000 o each addl mal hereof: $40.00 $70.00 $40.00 %Fir $40.00 /hr $50.00 /hr NOTES: I. Valuations for determination of permit fees will be based on contract prices or, in the absence of a contract price, the Building Valuation Data as published, by I.C.B.O. Building Standards II. Plan review fees (residential non - engineered) will be 50% of the building permit fee, and plan review fees (residential engineered) will be 20% of the building permit fee III. Plan review fees (commercial) will be 65% of the building permit fee Driveway permit fee (15.26) (no fee when included w /bldg permit) $25.00 R,O.W. pe !t” or,drlveway acres a mp"^ '' g �,. ' °j " ' $350.00 PLUMBING PERMIT FEES B. C. D. Single family and duplexes: Newresidentiat single family I4 1 iupie�t °L Additional plumbing, remodeling Residential Only All other plumbing work ELECTRIC PERMIT FEES A. For new construction of electrical work: Single family and duplexes: For temporary work service permit For residential single family - new obi duplex For additional wiring, remodeling Residential Only Plus the following additional charges: for each plumbing fixture for each gas outlet ,tor each water heater &' hot water boiler "(per 1 .000 btu) for automatic sprinkler systems (per head) for plumbing alteration work (per outlet) Plumbing Permits after work has started The following schedule of fees shall apply to all electrical work for which a permit is required All other electrical work For issuance of permit For each fixture /duplex outlet/individual switch /emergency light Foefil' Optne heat per k.w. installed 'p q," ' For each power outlet For electrical service to 200 amps electrical service 200 amps For each area floodlight, 1st light For each additional floodlight For genetat*peruk w. output For transformers 5 k.v.a. or above For motor connections, 15 hp and above For. transfer switches For transfer switches - automatic For electrical signs For trailer courts (each space) additional (same permit) For temporary services Fc r environmental control, devices per outlet/unit .1 The following schedule of fees shall apply to all electrical work for which a plan review is required: $0 - 500 $501 1,000 01 - $2,001 - 3,000 $3,001 - 4,000 $4,001- 6,000 $6,001 - up Page 7 of 13 $70.00 100.00'' $30.00 $35.00 $7.00 $5.00 $0 „,20; $1.50 $7.00 2 x the publish amount $30.00 $70.00 $100.00' $30.00 $35.00 $1.25 $1.00 $2.00 $20.00 $30.00 $20.00 $5.00 $1.00 $5.00 $20.00 $5.00'. $10.00 $20.00 $50.00'' $10.00 $5.00 $125 $35.00 $60.00 $100.00 $150.00 $200.00 $250.00'; $300.00 When extra inspections are made necessary by reason of defective work, or otherwise through fault or error on the part of the holder of the permit, or on the part of the permit holder's official setting forth the violation, only one such extra inspection shall be made under the regular fees as herein prescribed. For each further extra inspection for which the holder of the permit or employee is entirely responsible, fees shall be charged as follows: First inspection Second inspection Each additional inspection $40.00 $50.00 $60.00 The building department shall allow for correction of such work, a maximum of ten working days following the date of inspection Electric permits after work has started 2 x the publish amount SOLID WASTE COLLECTION AND DISPOSAL RATES A. Solid Waste Disposal fees at the landfill site: la. Residential garbage from a passenger automobile or pickup truck, up to 500 lbs. lb. Residential garbage 501 Ibs or greater 2. Commercial wastes and mixed construction /demolition ( residential /commercial /industrial /institutional) debris. Any mixed construction loads that have greater than 10% metals will not be accepted. 3a. Garbage truck of borough collection contractor 3b. Garbage truck of United States Coast Guard contractor 11a. Used oil - residential 11b. Used oil - commercial 12a. Incineration of medical /infectious waste - under 10 pounds 12b. Incineration of medical /infectious waste - 10 pound and over. 13a. Incineration of animals - euthanized 13b. Document Incineration 13c. Incineration of animals - cremation (up to 200 pounds); separated in incinerator unit, but not always the only animal in Page 8 of 13 no charge $46.00 /ton, $20.00 min. $100.00 /ton, $20.00 min. per contract $115.00 /ton 4. Asbestos disposal (Over 10 c.y. - price to be negotiated with Borough Manager) $135.00 /cy, $135.00 min 5a. Lead acid batteries - residential no charge 5b. Lead acid batteries - commercial $6.00 per large, $3.00 per small 6. Sludge disposal $75 /ton 7. House trailers (measured per trailer's longest dimension) $22.00/If 8a. Metals $275 /ton 8b. Vehicles $475 per vehicle 8c. Refrigerators no charge 8d. Other Appliances no charge 9a. Tires - commercial $70.00 /ton, $32.00 minimum 10a. Fishing gear - commercial, line & web only $100 /ton 10b. Fishing gear - residential - line & web, up to 500 Ibs. no charge 10c. Fishing gear - residential - line & web, 501 Ibs. and greater $46.00 /ton no charge $3.00 /gal $25.00 $25.00 + $1.50 per pound over 10 pounds $1.50/Ib, $15.00 minimum $1.50/Ib, $15.00 minimum $200.00 14a. Incineration of regulated vessel waste $50.00 + $2.00 per pound over 10Ibs. 14b. Landfilling of regulated vessel waste $115 /ton 15. Household Hazardous Waste No charge 16 .'''to obtain a .certrfted'*eigt 17. Equipment usage to off load customer waste d . s - 5. Vacancy rate, per month 604ien f ee_ 7. Late fees Kodiak fee per month 2.0 cu yds 2.6 cu , yds 3.6 3.6 cu yds r 4 } 0 cu yds 5 qq � 77 .0 c�! U�ii uij ti I'd i 5.5 cu yds 6.0 cu yds 10,0 cu yds 15.0 cu yds 20.0 cu yds dditi � fps€ + B. Solid Waste Collection Fees: 1. Weekly residential door to door collection service (per month, ins 2. Residential collection service (per month, outside city) k i I darry jt service in ad tiS , tc the charge f regur entai service 4. Senior citizen residential rates are 75% of those listed above 8. Commercial and residential dumpster service: Kodiak fee per tip 2.0 cu yds 2.6 cu yds 3.0 cu yds 3.6 cu yds 4.0 cu yds &0 c i yds 5.5 cu yds 6.0 cu yds 10.0 cu yds 15.0 cu yds 20.0 cu yds Beyond Salonie Creek fee per tip 2.0 cu yds 2.6 cu yds 3.0 ci' �t� °'',.� 3.6 cu yds 4.0 cu yds 5.0 " c lyds 5.5 cu yds 6.0 cu yds 18.0 cu yds. 20.0 cu yds Page 9 of 13 $10.0Q/ticket $65 /hour, $65 minimum $39 .. 17.50 $23.25 $12.00 $0:00`` 1% for each class of service plus $1.00 a9 $31.00 $31.00 $52.00 $52.00 $58.00 $58.00 . $75 $75.00 $75.00 $110.00 $333.50 $388.15 $30.00 $30.00 $34.03 $34.03 $40.00 $40. $40.0 0 $56.00 $68.00 $115.09 $138.57 $38.76 $56.25 $56,67; $75.26 $75.26 $78.34 $83.50 $83.50 $411.87 $501.08 Beyond Salonie Creek fee per month 2.0 cu yds 2.6 cu yds 3.6 cu yds 4.0 cu yds 5.0 cu'yds 5.5 cu yds 6.0 cu yds I $.0 cu _ f 20.0 cu yds 9. Construction / Demolition Dumpster Service Kodiak fee per tip 5.0 cu yds 10.0 Cu yds 15.0 cu yds Kodiak fee per month 5.0 cu yds 10.0 cu yd &w. 15.0 cu yds ii $75.00 '$155.O0 $333.50 Beyond Salonie Creek fee per tip 10.0; d 15.0 cu yds 20.0 cu yds ddiN JYA Beyond Salonie Creek fee per month 10.0 cu yds 1l5.0 cu 20.0 cu yds 10. Special Waste Dumpster Service Kodiak fee per tip 2.0 cu yds 5 0,qu 10.0 cu yds Kodiak fee per month 2.0 cu yds 5.0 0.1-yds, 10.0 cu yds Beyond Salonie Creek fee per tip 10.0 cu yds 15:0.cu yds z .... 20.0 cu yds Beyond Salonie Creek fee per month 10.0 cu yds 15.0 cu yds 20.0 cu yds Bear resistant dumpster - rent Bear resistant dumpster - per tip rF Page 10 of 13 $40.00 $40.00 X0.00 $40.00 $45.51 ,$45.51 $45.51 $67.00 $213.14 $246.93 $40.00 $68.00 $115.09 $300.00 $411.87 $411.87 $68.00 $213,14'' $213.14 $52.00 $75,Q6 $150.00 $30.00 $40.00 $68.00 $310.00 $310.0( $310.00 $68.00 $ 213.14 $213.14 $63.66 $50.00 iiuinpster 5 The charge for commercial dumpster service which compacts materials is one and one -half times the standard rate. 12. Governmental customers will be served by a private company by direct negotiation for service. Fees will be set, billed and collected by that company. aiw 14. A deposit may be charged for a dumpster of up to two (2) times the monthly rental. C. Every residential unit will be charged for solid waste collection services. Residential units within the City of Kodiak and Service District 1 will be billed by the City with their utility bills. D. Commercial and residential solid waste materials collected by the United States Coast Guard, or its representative, for disposal at the Kodiak Island Borough landfill will be charged at the time of disposal at the rate established in item A.3. of this fee schedule. The Kodiak Island Borough will invoice the United States Coast Guard for all or any portion of those fees charged, as agreed upon by the parties. Fees associated with other waste disposal options will be charged based on the applicable fee represented in this schedule. E. Dumping commercial waste in residential dumpsters or other business's dumpsters without written permission will result in a $300.00 fine for the first offense and a $1,000.00 fine for the second and subsequent offenses. F. Dumping metals, used oil, bilge water, epoxy paint or other hazardous waste items in a commercial or residential dumpster will result in a $300 fine for the first offense and a $1,000 fine for the second and subsequent offenses. Page 11 of 13 G. For all construction and demolition projects there will be a deposit of $250 minimum for projects up to 249 square feet, $500 minimum for projects 249 to 500 square feet and $1000 minimum for projects 501 square feet and above. This deposit will be paid in full upon application for a zoning permit and no building permit will be issued without proof of payment. A deposit is also required for projects that do not require a zoning compliance or building permit (e.g. demolition /remodeling projects such as roofing and siding). A bill will be generated and sent to the client on a monthly basis until verification is received that the project is complete and the dumpster has been removed. If a positive deposit balance remains after verification is received and the dumpster has been removed this remainder amount will be returned to the client. H. If a client wants to take the waste directly to the landfill, a deposit will still be required and they must pay for the waste at the landfill in cash and retain their receipts. The receipts will then be presented after the project is complete to verify that the waste was properly disposed of. Estimates may be made to determine if the amount of waste generated from a project reasonably corresponds with the receipts. I Companies conducting commercial, industrial and institutional demolition projects need to separate their waste into metal and non -metal loads. Mixed loads will not be accepted at the landfill. J. Metals received at the landfill in the form of tanks or cables must be prepared in an acceptable manner. Tanks must be drained of all fluids and wiped clean. Tanks under 500 gallons must have an 18" square hole cut into it and wiped clean. Tanks over 500 gallons must have one end cut off and wiped clean. Tanks 1000 gallons and greater must contact Engineering /Facility staff to discuss acceptable criteria. Fishing cable must be cut into 3' lengths. Other metal items must be cut into pieces no greater than 17' long, 7' wide and 5' high. They must be separated from non -metal material (e.g., machinery with hoses or electrical components). K. Non - profit organizations will be allowed free disposal of household residential waste up to 1000 Ibs /week. Disposal of large items (e.g., boats, trailers, construction /demolition debris and metals) will be charged at the same rate as shown in this fee schedule. L. Commercial establishments, and /or small quantity generators, who generate hazardous waste must contact an environmental company to properly dispose of their waste. Page 12 of 13 M. Commercial establishments which dispose of construction and or demolition waste into dumpsters which are not designated for such use (i.e., public dumpsters, commercial dumpsters) will be charged at the same rate as shown in this fee schedule. An estimate of waste generated will be obtained from building or zoning permit information. If this information is not available a field estimate will be made. Definitions: Residential waste - Waste generated from your home (for example, household garbage, bulky items such as furnishings and grass /lawn clippings). It excludes construction /demolition waste. Commercial waste - Institutional and industrial organizations or contractors and businesses conducting work for compensation and /or barter. Regulated vessel waste - Waste from vessels that have been inspected by U.S. Customs & Border Protection Office must be transported by a compliance holder to the landfill and may be landfilled. Waste from vessels that have not been inspected must be transported by a compliance holder and must be incinerated. Page 13 of 13