Loading...
2002-34 Supporting General Obligation BondsKODIAK ISLAND BOROUGH RESOLUTION NO. 2002 -34 Introduced by: Manager Carlson Requested by: Manager Carlson Drafted by: Manager Carlson Introduced: 12/19/2002 Adopted: 12/19/2002 A RESOLUTION OF THE ASSEMBLY OF THE KODIAK ISLAND BOROUGH APPROVING THE KODIAK ISLAND BOROUGH SCHOOL DISTRICT BOARD OF • - SUBMISSION BY THE KODIAK ISLAND BOROUGH SCHOOL DISTRICT TO THE STATE OF ALASKA DEPARTMENT OF EDUCATION WHEREAS, the Kodiak Island Borough School District Board of Education approved the Facilities Review Committee's recommended General Obligation project priority list at their December 16, 2002 regular meeting; and WHEREAS, the State of Alaska Department of Education requires that the School District submit applications for state participation in school related General Obligation bond debt; and WHEREAS, the Kodiak Island Borough Assembly intends to submit to the voters as quickly as possible a General Obligation bond ballot for school projects; and WHEREAS, the election process for General Obligation bond debt requires approximately 75 days; NOW, THEREFORE, BE IT RESOLVED BY THE KODIAK ISLAND BOROUGH ASSEMBLY that the Borough Assembly approves the hereto attached list, and respectfully requests that the School District expedite the submission of the applications to the Department of Education for the projects, to ensure approval while the state General Obligation bond participation option is still available. ATTEST: ADOPTED BY THE ASSEMBLY OF THE KODIAK ISLAND BOROUGH THIS NINETEENTH DAY OF DECEMBER 2002 J udith A. Nielsen e i c, Borough Clerk KODIAK ISLAND BOROUGH 6.4 iC6‘ke Gabrielle LeDoux, Borough Mayor Kodiak Island Borough, Alaska Resolution No. 2002 -34 Page 1 of 2 0 d m N 0 Proiecc FRC Committee 11/20/02 GO Bond Projects * It has been suggested by committee members that a cost analysis of a new pool versus repairs to the old pool be completed. These figures will be brought to you at a later date. State Local State Local Cost 70% 30% 60% 40% KMS: Repair Spalling Concrete $ 85,000 $ 59,500 $ 25,500 $ 51,000 $ 34,000 KHS: Replace Voc -Ed Wing & Classroom Wing HVAC $ 218,026 $ 152,618 $ 65,408 $ 130,816 $ 87,210 East Elementary: Heating Control Replacement $ 520,000 $ 364,000 $ 156,000 $ 312,000 $ 208,000 North Star Elementary: Gym Floor Replacement $ 100,000 $ 70,000 $ 30,000 $ 60,000 $ 40,000 KHS: Exterior Insulation System & Thermal Windows $ 596,020 $ 417,214 $ 178,806 $ 357,612 $ 238,408 Ouzinkie School Gym Renovation $ 1,015,714 $ 711,000 $ 304,714 $ 609,428 $ 406,286 Old Harbor Gym/Voc -Ed Renovation $ 1,565,714 $ 1,096,000 $ 469,714 $ 939,428 $ 626,286 KHS Voc Ed/Classroom Reclamation $ 9,965,933 $ 6,976,153 $ 2,989,780 $ 5,979,560 $ 3,986,373 North Star Elementary Addition $ 3,625,051 $ 2,537,536 $ 1,087,515 $ 2,175,031 $ 1,450,020 Kodiak Learning Center/ Cones. Study Building Reno. $ 1,110,636 $ 777,445 $ 333,191 $ 666,382 $ 444,254 IRMA Roof Complex Upgrade $ 523,504 $ 366,453 $ 157,051 $ 314,102 $ 209,402 Larsen Bay: Repair Buckled Floor $ 250,000 $ 175,000 $ 75,000 $ 150,000 $ 100,000 KHS Asbestos Tile Removal and Carpet Project $ 822,254 $ 575,578 $ 246,676 $ 493,352 $ 328,902 P001 $ 10,000,000 $ 7,000,000 $ 3,000,000 $ •,000,000 $ 4,000,000 District Wide: Carpet Replacement Schedule $ 7,605,000 $ 5,323,500 $ 2,281,500 $ ,563,000 $ 3,042,000 Main Elementary Addition $ 4,536,278 $ 3,175,395 $ 1,360,883 $ ',721,767 $ 1,814,511 Total Project Costs $ 42,539,130 $ 29,777,391 $ 12,761,739 $ 2 ,523,478 $ 17,015,652