Loading...
1986-64 Authorizing Execution of Contract Amendment #15 with URS Co. for Construction Services for Water and Sewer Improvements in Service District #1.A RESOLUTION OF THE KODIAK ISLAND BOROUGH ASSEMBLY AUTHORIZING APPROVAL OF CONTRACT AMENDMENT NO. 15 WITH URS COMPANYI FOR CONSTRUCTION SERVICES FOR WATER AND SEWER IMPROVEMENTS IN SERVICE DISTRICT NO. 1. WHEREAS, the Kodiak Island Borough by Resolution No. 82 -13 -R approved a contract with URS Company for design of water and sewer improvements in Service District No. 1; and WHEREAS, the sixth project is scheduled for award on October 2, 1986; and WHEREAS, the Kodiak Island Borough desires to have URS Company continue with project administration through the construction phase; NOW, THEREFORE, BE IT RESOLVED by the Kodiak Island Borough Assembly that Amendment No. 15 for provision of construction services by URS Company is approved with costs and fixed fee not to exceed the following: Amendment No. 15: Cost $345,283 Fixed Fee 42,725 Total $388,008 BE IT FURTHER RESOLVED that the above expenditures are hereby authorized from funds received for the Island Lake Water and Sewer Project and that the Borough Mayor is hereby authorized and instructed to execute the appropriate documents. PASSED AND APPROVED this _ day of , 1986 by the Kodiak Island Borough Assembly. ATTEST: •ua,.,...... C' Mc, Borou4 Clerk KODIAK ISLAND BOROUGH RESOLUTION NO. 86 -64-12 KODIAK ISLAND BOROUGH Borough Mayor 44 Presiding Officer SUMMARY OF EXPENSES ASSOCIATED WITH CONSTRUCTION ADMINISTRATION SERVICES SERVICE DISTRICT NO. 1 WATER AND SEWER IMPROVEMENTS PROJECT NO. 85 -2 August 27, 1986 I. WORK TO BE COMPLETED BY URS COMPANY Task No. and Description Cost Amendment 15 Project 85 -2 I. Provide assistance through bid period; tabulate, review, and analyze bids received, and assist the Borough in obtaining signed contract. $ 5,960 2. Provide project management and coordinate with the Borough and regulatory agencies during construction 62,599 3. Review shop drawings, construction drawings, and other submittals made by the Contractor for compliance with the design specifi- cations. Review laboratory and shop test reports of materials and equipment. Prepare supplementary sketches to adjust to field conditions not anticipated during design. 11,626 4. Provide resident construction manager (project representative) and field assistant commensurate with the extent of construction activity in progress. 154,648 5. Prepare monthly construction progress reports, contractor's periodical pay estimates, change ceders, and other items necessary for the orderly progress of the work. 41,787 6. Provide field inspection by design team as needed, make final field observation, and prepare 0 & M manual for completed project. 11,925 7. Coordinate the taking of pre- construction video tape records between the Contractor and the Borough. Video taping and all necessary equipment to be furnished by the Borough with assistance by the Contractor 1,749 8. Coordinate instrument field layout for construction in accordance with scope of survey work to be.performed under this project. 7,617 9. Prepare one set of reproducible construction plans revised to conform with construction records for the Borough's use and files. 11,507 10. Maintain field inspection office, files, and inspection records for the work performed. 36,216 11. Provide instrument field location for points of intersection of the sewer line, manhole locations, water line locations, alignment stakes, and run level loops to provide elevation bench marks. 42,372 12. Coordinate final design alignment for field layout, balance level loops, provide office computations, and coordinate field layout with new during the progress of the work including the establishment and maintaining of survey records. 3.107 Total $ 388.008 IL EXPENSES INCLUDED IN TOTAL COST 1. Travel, housing, per diem, mileage, etc. $ 38,212 2. All other expenses, including printing, office rent, etc. 22,237 Total $ 60,449 W. COST SUMMARY - URS COMPANY 1. Administration, coordination, etc. $ 345,283 2. Profit at 12.4 percent 42.725 TOTAL COST NOT TO EXCEED $ 388,008