1986-31 Acquiring Industrial Land at Womens Bay for the Specific Purpose of Encouraging Development of the Kodiak International Shipworks.KODIAK ISLAND BOROUGH
RESOLUTION N0. 04 -31 -R
A RESOLUTION OF THE KODIAK ISLAND BOROUGH ASSEMBLY ACQUIRING INDUS-
TRIAL LAND AT POMP'S BAY FOR THE SPECIFIC PURPOSE OF ENCOURAGING DEVELOPMENT OF
;THE KODIAK INTERNATIONAL SHIPWORKS.
WHEREAS. Kodiak International Shipworks has designed • boat repair
facility with offis* warehouse building to be located at an existing dock
facility in Masons Bay, and
•
WHEREAS, Kodiak International Shipworks holds transferable porches*
options for approziwat*ly 44.36 sores of land contingent to the dock, and
WHEREAS, the 44.35 acres are currently owned by Konilg, Inc. (approx-
; imately 42.66 acres/ and Lash Corporation ( approximately 1.0 acres), and
WHEREAS, the North Pacific Development Company has requested that the
• Kodiak Island Borough purchase the above described land and make it available
by lease to the North Pacific Development Company for construction of the
Kodiak International Shipworks ship lift and repair facility and support
services building, and
WHEREAS, a 50.3 million financing for the building and ship lift and
repair facility including complete refurbishment of the dock facility are
contingent upon the land purchase and lease by the Kodiak Island Borough.
NOW, THEREFORE, BE IT RESOLVED that the Kodiak Island Borough
44.35 acres of land and lease the land to
Company or its assigns for the purpose of construct-
Assembly intends to purchase the
Korth Pacific Development
lag and operating •
trial
activities
boat repair
subject to
the
facility,
following
office
building
Conditions:
and related indns-
1. Land porches* seall'be accomplished using proceeds Of this sale
of
2. Roseau* to the land sale fund shall be used to pay off the
riving• bond;
3. Lease and /or purchase payments received from NPDC most equal or
eseesd the total payback on the revenue bond of principle and
interest.
4. laitlal lease term shall be for a period not to exceed 40 years.
S. First position of lend ownership by th• Kodiak Island Borough.
AND BE IT FURTHER RESOLVED that Kodiak Island Borough staff is
directed to prepare purchase offers, a lease, rsv.* u. bond documents and other
such documents es aro r.guir.d to further Assembly approval and on the
condition that no bonds will b. sold or land purchased or leased prior to final
loan approval or financing for the ship lift and repair facility contingent
only on Kodiak Island Borough purchase and lease of the land.
PASSED AND APPROVED this 1 day of Acril 1666.
' ' I ATTEST:
' By
Bbrough
KODIAK ISLAND BOROUGH
By
Mayor
Bore dh
B � . _Y - n/
P./ iding Officer
SUMMARY OF EXPENSES ASSOCIATED WITH DESIGN SERVICES
SERVICE DISTRICT NO. 1 WATER AND SEWER IMPROVEMENTS
PROJECT NO. 85 -3
I. WORK TO BE COMPLETED BY URS COMPANY
Task No. and Description
Cost
Amendment 14
1. Coordinate the work with the Borough and regulatory
agencies $ 6,679
2. Establish design criteria for the sewer and water system.
Identify areas to be served by individual grinder pumps, points
of connection or discharge into existing system, establish
sewer and water system locations. 5,000
3. Prepare draft layout of water and sewer system. Draft layout
will be on a single overall map of the design area prepared by
URS from existing subdivision and other maps furnished by the
Borough. Scale will be 1" = 100'. 5,645
4. Review draft layout with Borough officials, incorporate any
changes resulting from the review and obtain formal approval
of the water and sewer system layout. 3,133
5. Prepare plan and profile sheets for water and sewer system.
Prepare plan sheets for water meter vaults and sewage
metering manholes as required. Roadway profile and cross
sections differing from existing roadway to be provided by
the Borough. 29,077
6. Prepare technical specifications and contract documents. 13,858
7. Accomplish field design survey. Survey will include survey of
all existing roadway profiles and cross sections of Kraft Way
for use by the Borough in providing future roadway designs
incorporated into the design of the sewer and water system.
See Task No. 5. 34,029
8. Submit six copies of the plans and specifications to the
Borough for review and approval. 932
9. Incorporate any revisions and additions to the plans and
specifications resulting from Borough's review. 2,453
10. Submit copies of the final plans and specifications to ADEC
and other regulatory agencies for review and approval. Make
appropriate revisions and additions. 4,625
11. Furnish the Borough with one set of Mylar and master
specifications to be used for construction bidding purposes. 500
Total
II. EXPENSES INCLUDED IN TOTAL COST
I. Travel, housing, per diem, mileage, etc.
2. All other expenses including printing, office rent, etc.
Total
III. COST SUMMARY - URS COMPANY
1. Administration, coordination, etc.
2. Profit at 13 percent
TOTAL COST NOT TO EXCEED
March 25, 1986
$ 1
$ 7,945
6.155
$ 14,100
$ 93,953
11,978
$ 105,931