Contract No. 1992-35 Scout Circle Road Project, ProjectCAonxc **THIS CHANGE ORDER REPLACES CHANGE ORDER #6 DATED 11/16/92 KODIAK ISLAND BOROUGH FIELD CHANGE ORDER NO. _6 A** Contractor: A -K CONSTRUCTION Number Contract No. C92-035 Address: PO BOX 3707 1 Date: ) ) /30/g? City/State/Zip: KODIAK, AK 99615 line item 1.05 to read 8451 RE: SCOUT CIRCLE ROAD PROJECT Gent tmen: This Change Order, when executed by the parties to the Contract, shalL constitute an amendment of the referenced Contract. Except as provided herein, all terms and conditions of the Contract remain unchanged and in full force and effect. Payment provided for in this Change Order set forth herein, if any, are full and complete compensation to the Contractor for the change(s) to the work, deleted work, modified work, direct or indirect impact on the Contractor's schedule, and for any equitable adjustment to which the Contractor may be entitled, pursuant to the Contract between the Owner and Contractor or any other basis whatsoever. Contract Item Estimated Revision in Contract Quantities Number Description (-) Decrease (+) Increase 1 Change estimated quantity of $ 729.33 line item 1.05 to read 8451 CY 2 Change estimated quantity of $ 22,560.93 line item 1.06 to read 6671 CY 3 Change estimated quantity of $. line item 1.07 to read 3:643 1,726.40 SY 243WL ( V 4 Change estimated quantity of $ 37,166.40 line item 1.08 to read 10372 CY 5 Change estimated quantity of $ 2,646.00 line item 1.09 to read 2602 CY This Change Order is approved with the understanding that: (1) the total contract price may decrease or increase by the actual quantity of materials deleted or installed as requested above and as paid for at extablished unit contract prices, (2) no additional cost except as described in (1) will be borne by the Owner due to these revisions. Actual net decrease or increase in the total contract price will be reflected in the monthly and/or final pay estimates to the Contractor, (3) the contract time is not changed. APPROVED: KODIAK ISLAND BOROUGH APPROVED: nn CONTRACTOR. 4—IC--.1/ yy a-js T#it7Cr70✓ BY: c1o�.1 ,J —a r%pe — DATE• Z Or -e. 4 Z- ORDER #6 DATED 11/16/92 KODIAK ISLAND BOROUGH FIELD CHANGE ORDER NO. 6A** Contractor: A -K CONSTRUCTION Contract No. C92-035 Address: PO BOX 3707 Date: 12/03/92 City/State/Zip: KODIAK, AK 99615 RE: SCOUT CIRCLE ROAD PROJECT Gentlemen: This Change Order, when executed by the parties to the Contract, shall constitute an amendment of the referenced Contract. Except as provided herein, all terms and conditions of the Contract remain unchanged and in full force and effect. Payment provided for in this Change Order set forth herein, if any, are full and complete compensation to the Contractor for the change(s) to the work, deleted work, modified work, direct or indirect impact on the Contractor's schedule, and for any equitable adjustment to which the Contractor may be entitled, pursuant to the Contract between the owner and Contractor or any other basis whatsoever. This Change Order is approved with the understanding that: (1) the total contract price may decrease or increase by the actual quantity of materials deleted or installed as requested above and as paid for at extablished unit contract prices, (2) no additional cost except as described in (1) will be borne by the Owner due to these revisions. Actual net decrease or increase in the total contract price will be reflected in the monthly and/or final pay estimates to the Contractor, (3) the contract time is not changed. APPROVED: KODIAK ISLAND BOROUGH APPROVED: BY: DATE: CONTRACTOR: BY: PREPARED BY: KIS DATE: Contract Item Estimated Revision in Contract Quantities Number Description (-) Decrease Increase 6 Change estimated quantity of $ 385.00 line item 1.10 to read 286 LF 7 Change estimated quantity of $ 1,200.00 line item 1.13 to read 1 each 8 Change estimated quantity of $ 600.00 line item 1.14 to read 4 each 9 Change estimated quantity of $ 1,496.00 line item 1.18 to read 548 CY SUBTOTALS (3,311.40) 65,198.66 T IS CHANGE ORDER SUPERCEDES C GE ORDER NUMBER ITEM 2. THIS W LL INCREASE THE CONTRACT PRIC FROM $212,856.50 , TO $271,533.76. This Change Order is approved with the understanding that: (1) the total contract price may decrease or increase by the actual quantity of materials deleted or installed as requested above and as paid for at extablished unit contract prices, (2) no additional cost except as described in (1) will be borne by the Owner due to these revisions. Actual net decrease or increase in the total contract price will be reflected in the monthly and/or final pay estimates to the Contractor, (3) the contract time is not changed. APPROVED: KODIAK ISLAND BOROUGH APPROVED: BY: DATE: CONTRACTOR: BY: PREPARED BY: KIS DATE: NOTICE TO PROCEED KODIAK ISLAND BOROUGH 710 MILL BAY ROAD KODIAK, AK 99615-6398 TO: A - K Construction Inc. P O Box 3707 Kodiak AK 99615 Project: Scout Circle Road No.: KIB - 430 - 601 Contract No. C92-035 Type of Contract: Lump Sum Amount of Contract: $197,798.50 You are hereby notified to commence work on the referenced contract on or before August 17, 1992, and shall fully complete all of the work of said contract within 120 consecutive calendar days thereafter. Your completion date on the road is therefore November 15, 1992. Grass seeding must be completed by May 31, 1993. The contract provides for an assessment of the sum of $ 300.00 as liquidated damages for each consecutive calendar day after the above established contract completion date that the work remains incomplete. Dated this 17th day of August, 1992. _s/Titl Mayor "7—i ACCEPTANCE OF NOTICE Receipt of the foregoing Notice to Proceed is hereby acknowledged By A -K WNS1z0C_r7o-J 0r'7PRn,� this 17th day of August, 1992. By_,2L MJJ -;� W-- o H a '2,a77aORN Title Vicr= f�Zaio�-yT' OWNER - GENERAL CONTRACTOR C O N T R A C T THIS CONTRACT, made this 19 may of August A.D., 1992, between the Kodiak Island Borough, acting by and through its Borough Mayor, party of the first part, and A - K Construction, Inc. of Kodiak, Alaska. A CORPORATION, incorporated under the laws of the State of Alaska its successors and assigns, party of the second part, hereinafter called the Contractor. WITNESSETH: That the Contractor, for and in consideration of the payment or payments herein specified and agreed to by the party of the first part, hereby covenants and agrees to furnish and install all the materials and to do and perform all the work and labor required in the construction of the Scout Circle Road Project, Project RIB - 430 - 601 in the Kodiak Island Borough, Kodiak, Alaska, for the sum of One hundred ninety-seven thousand seven hundred ninety-eight Dollars and 50 Cents ($197,798.50). The Contractor further covenants and agrees that the entire construction shall be done under the administration and to the complete satisfaction of the Kodiak Island Borough subject to inspection at all time and approval by any participating agency of the Government of the United States of America, and in accordance with the laws of the State of Alaska and rules and regulation of said Federal Agency. The Contractor further covenants and agrees that all of said work and labor shall be done and performed in the best and most workmanlike manner and that all and every of said materials and labor shall be in strict and entire conformity in every respect with the Contract documents: that he will abide by and perform all stipulations, covenants, and agreements specified in said Contract documents, all of which are by reference hereby made a part of this Contract, as to all premises therein: and in case any of said materials or labor shall be rejected by the Borough Mayor or his assistant or authorized representative, as defective or unsuitable, then the said materials shall be removed or replaced with other approved materials and the said labor shall be done anew, to the satisfaction and the approval of the Borough Mayor or his representatives, at the cost and expense of the Contractor. The Contractor further covenants and agrees that all of said materials shall be furnished and delivered and all and every of the said labor shall be done and performed, in every respect, to the satisfaction of the herein aforementioned Borough Mayor, on the road on or before November 15, 1992 and on the grass seeding on or before May 31, 1993. It is expressly understood and agreed that in case of the failure on the part of the Contractor for any reason, except with the written consent of the Borough Mayor, to complete the furnishing and delivery of said materials and the doing and performance of the said work before the aforesaid date, the party 532SP Page 1 of 3 of the first part shall have the right to deduct from any monies due or which may become due the Contractor, or if no monies shall be due, the party of the first part shall have the right to deduct from any monies due or which may become due the Contractor, or if no monies shall be due, the party of the first part shall have the right to recover said deduction to be made, or said sum to be recovered not as penalty, but as damages. Provided, however that upon receipt of written notice from the Contractor of the existence of causes over which said Contractor has no control and which must delay the completion of said work, the Borough Mayor may at his discretion, extend the period hereinbefore specified for the completion of the said work, and in such case the Contractor shall become liable for said liquidated damages for delays commencing from the date on which said extended period shall expire. It is distinctly understood and agreed that no claim for additional work or materials, not specifically herein provided, done or furnished by the Contractor, will be allowed by the Borough Mayor, nor shall the Contractor do any work or furnish any material not covered by this contract, unless such work is ordered in writing by the Borough Mayor. In no event shall the Contractor incur any liability by reason of any verbal directions or instructions that he may be given by the Borough Mayor, or his representatives, nor will the said party of the first part be liable for any materials furnished or used, or for any work or labor done, unless said materials, work or labor are required by said Contractor on written order furnished by the Borough Mayor. Any such work or materials which may be done or furnished by the Contractor without written order first being given shall be at the said Contractor's own risk, cost and expense and he hereby covenants and agrees that without such written order he shall make no claim for compensation for work or materials so done or furnished. Any dispute arising under this contract which is not disposed of by agreement between the Contractor and the Project Manager shall, at the request of the Contractor, be decided by the Contracting Officer who shall reduce his decision in writing and mail or otherwise furnish a copy thereof, to the Contractor. The Contracting Officer reserves the right to make written request to the Contractor at any time for any additional information needed to make his decision. The decision of the Contracting Officer shall be final and conclusive unless, within 30 days from the date of receipt of such copy, the Contractor mails or otherwise furnishes to the Kodiak Island Borough Assembly, a written appeal. The Notice of Appeal shall include specific exceptions to the contracting Officer's Decision, including specific provisions of the contract relied upon. General Assertions that the Contracting Officer's Decision is contrary to law or, to fact, are not sufficient. The decision of the Kodiak Island Borough Assembly shall be rendered within 120 days of the Notice of Appeal. The decision shall be final and conclusive unless determined by a court of competent jurisdiction to have been fraudulent, or capricious, or arbitrary, or so grossly erroneous as necessarily to imply bad faith. 532SP Page 2 of 3 The Disputes article does not preclude consideration of questions of law in connection with decisions provided for above. Nothing in this contract, however, shall be construed as making final the decisions of the Kodiak Island Borough Assembly or its representative on a question of law. At all times during the time that a dispute is pending and in the process of being resolved or decided, the Contractor shall proceed diligently with the work so as to achieve, if at all possible, performance of the work within the contract allotted time. The Contractor hereby agrees to receive the prices set forth in the proposal as full compensation for furnishing all the materials and labor which may be required in the prosecution and completion of the whole work to be done under this contract, and in all respects to complete said contract to the satisfaction of the Borough Mayor. It is further distinctly agreed that the said Contractor shall not assign this contract, nor any part thereof, nor any right to any of the monies to be paid him hereunder, nor shall any part of the work be done or materials furnished under this contract. The bonds given by the Contractor in the sum of 50% Payment Bond, and 50%, Performance Bond, to secure the proper compliance with the terms and provisions of this contract, are hereto attached and made part thereof. IN WITNESS WHEREOF, The Kodiak Island Borough Mayor, by authority in him vested, has executed this contract on behalf of the Kodiak Island Borough, and the said A - K Construction, Inc. has hereunto set their hands and seals, the day and year first above written. KODIAK ISLAND BOROUGH 710 Mill Bay Road Kodiak, AK 99615-6398 By B ough Mayor By acilitie0 oor ina ATTEST: ByQr rny-1 � Boraugh Clerk 532SP Page 3 of 3 CONTRACTOR A - K Construction, Inc. P. O. Box 3703 Kodiak, AK 99615 FED ID NO. By c�b7J�171.8- U&-g_; President JOH&J `25 rr*Jor_c ITEM NO. 1 Kodiak /s/and Borough AGENDA STATEMENT Meeting of: August 6, 1992 C- U -3J ITEM TITLE: Contract Award - Scout Circle Road Project SUMMARY STATEMENT Bids were received and opened July 28, 1992 at 3:00 p.m. for the construction of Scout Circle. A -K Construction, of Kodiak, Alaska, is the low bidder for the project. Recommend award of the contract for the Scout Circle Road Project to A -K Construction in an amount not to exceed $ 197,798.50. FISCAL NOTES [I N/A Expenditure Account Required $197.798.50 No 430-601-452-150-042-005 APPROVAL FOR AGENDA: •����.... •.�.�vw r1V I IVIr. Moue to award Contract No. 92-35 Scout Circle Road Construction to A -K Construction in an amount not to exceed $197,798.50. KODIAK ISLAND BOROUGH SCOUT CIRCLE ROAD PROJECT BID TABULATION JULY 18, 1992 3:00 P.M. FIRM SCHEDULE I SCHEDULE II TOTAL ANDERSON CONSTRUCTION $ 245,148 $ 4,000 $249,148 BRECHAN ENTERPRISES $ 271,016.60 $ 3,600 $274,616.60 A -K CONSTRUCTION $ 193,048.50 $ 4,750 $197,798.50 PROPOSAL NUMBER DATE SUBMITTED TO SHEET NO. OF ---- ARCHITECT DATE OF PLANS TELEPHONE WORK TO BE PERFORMED AT STREET/0111TAII -_---�---. We propose to furnish all the materials and perform all the labor necessary for the completion of ,rn lumenal IS guaranteed to be as specified, and the above work to be performed in accordance with the drawings and specifications submitted for above work and completed in a substantial workmanlike manner for the sum of with payments to be or Dollars ade as follows. _. __. -- - Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance upon above work. Workmen's Compensation and Public Liability Insurance on above Respectfully Submitted work taken out by Per NOTE: This proposal may be withdrawn by us if not accepted within days. ACCEPTANCE OF PROPOSAL The above prices, specifications and conditions are satisfactory and are Accepted hereby accepted. You are authorized to P Signature - do the work as specified. Payment will be made as outlined above. Date Signature TRIPLICATE WIISonJon" • fa,ponbu. MADE IN LLS A. i4M DupIKe1B-P WIIfONonBs, 1w, KODIAK ISLAND BOROUGH CONTRACT CHANGE ORDER 710 MILL BAY ROAD KODIAK, ALASKA 99615 Contract No. Change Order No Project Name, Number & Location Amount of Contract & Change Orders Original Contract - Previous Changes -�-- - --- Contractor This Change Adjusted Contract Description of Change Cost U....., .:.4 .,, td —UM . .' .:. �.. ... '..0 i.. Sit - l.. .. :- The time provided for completion of the contract is futabaapaWincreased)1de0gaaevd(by v calendar days. This document shall become an amendment to the contract and all provisions d the contract will apply thereto - - - Accepted By: Date Contractor's Representative Recommended: Date - Facility Coordinator Approved By: Date Contracting Officer Copies: Original to Facility Coordinator Canary to Contractor Pink to Project Inspector MqA KODIAK ISLAND BOROUGH CONTRACT CHANGE ORDER 710 MILL BAY ROAD KODIAK, ALASKA 99615 Contract No. Change Order No Project Name, Number & Location Amount of Contract & Change Orders Original Contract" " ^-�-" ' -• - - Previous Changes .- , ... Contractor This Change Adjusted Contract _ Description of Change Cost The time provided for completion of the contract is (uda4w0w-(incised) (decreased/ by " ca/ender days. This documentshpll. become an amendment to the contract and all provisions of the contract will apply thereto `' cr, n1 . c L i '• ` c Accepted By:=� ' '''.. :::: Date _- Contractors Representative ,- Recommended: Data Facility Coordinator Approved Bye Date Contracting Officer Copies: Original to Facility Coordinator Canary to Contractor Pink to Project Inspector KODIAK ISLAND BOROUGH 4 FIELD CHANGE ORDER NO. Contractor: A—R Construction contract No. C92-035 Address: P O Box 3707 Date: 10/14/92 City/State/Zip: Kodiak, AR 99 RE: Scout Circle Road Project Gentlemen: This Change Order, when executed by the parties to the Contract, shall constitute an amendment of the referenced Contract. Except as provided herein, all terms and conditions of the Contract remain unchanged and in full force and effect. Payment provided for in this Change Order set forth herein, if any, are full and complete compensation to the Contractor for the change(s) to the work, deleted work, modified work, direct or indirect impact on the Contractor's schedule, and for any equitable adjustment to which the Contractor may be entitled, pursuant to the Contract between the Owner and Contractor or any other basis whatsoever. Contract Item Estimated Revision in Contract Quantities Number Description (-) Decrease (*) Increase 1.10 24" Galvanized Corrugated Revises Project Quantity from Metal Pipe 273 LF on Field Change Order #2 to 293 LF Th's culvert is to replace 2 sections of pipe that after being ex avated to be relocated to align with the new di.tchline of island Lake Road were found to he damaged beyond Mse. CONTRACTOR DID NOT DAMAGE CULVERT This will increase the contract from $206,083.50 to $207,183.50 This Change Order is approved with the understanding that: (1) the total contract price may decrease or increase by the actual quantity of materials deleted or installed as requested above and as paid for at extabLished unit contract prices, (2) no additional cost except as described in (1) will be borne by the Owner due to these revisions. Actual net decrease or increase in the total contract price will be reflected in the monthly and/or final pay estimates to the Contractor, (3) the contract time is not changed. APPROVED: KODIAK ISLAND BOROUGH BY:�. DATE: L �1 PREPARED BY: /Pm KIB FC."Jac' APPROVED:r- CONTRACTOR: DATE: /!E,/ 'i a&A- KODIAK ISLAND BOROUGH 710 MILL BAY ROAD KODIAK, ALASKA 99615 Contract No. ` CONTRACT CHANGE ORDER Change Order No Project Name, Number & Location Amount of Contract & Change Orders Original Contract Previous Changes- Contractor This Change Adjusted Contract Description of Change Cost The time provided for completion of the contract is (unehengad).F wasseWdeca"d}by calendar days. This document shall become an amendment to the contract and all provisions of the contract will apply thereto Accepted By: '�-�r- Contractor'sRepresentative Date Recommen FaGil Date -�-�'r• �� Approved By: Contracting Officer Date Copies: Original to Facility Coordinator Canary to Contractor Pink to Project Inspector 192.15 � O'HEADy TEL ON OUND / FOUNDATION I �l 0 / \ ELECT. /L_13UR ON TREES TERLWE DIRTATE SEVE M.H�a'• I.E. _. 1 4.5 - x 2 S.B9 C,OR B ' 4 =07930 _ LOT \ 3A JT �B SEE f�'.A.. M.H. IL \ _ � _ 99.0 Jn / M.H. i oox LOT 2 TEL. GOES TO GR D 3 AND INTO LAKE 1 TEL V C� TEL C MES TEL MES 11� 2- " op lt —� THIS S EY L OT /4-/ 1.34 ACRES ± COR'2 LOTS i_iS \R5 \� LOT I V 26" S.S. TEL. RISER_ 4p9 LOT I9 .. 9 OT S.OQ ACRES ± ivy ,� STREET PRG IG AERN WES'I� N w 'TY: 24 " C.M.P. SOLE I.E. = 99.9 WEST �c 101.2 EAST PAWN� / CID D = 90.0874' R. = 50.00 00 I re /soo' R. =[60.00 L. = 119.1? o'LEAD �0 LES TEL. RISER CCOOR6 LOT I PN PTPS STREE PP5/ COR '/ LOT I LEGEND = FOUND OR SET MONUMENT = SET AL. CAPON 51S" REBAR lll.u.n Al rAo nm FIA" RFRAR KODIAK ISLAND BOROUGH FIELD CHANGE ORDER NO. 2 contractor: A -K CONSTRUCTION contract No. C92-035 Address: P 0 BOX 3707 KODIAK AK 99615 Date: 9/x/92 City/State/Zip: RE: SCOUT CIRCLE ROAD PROJECT Gentlemen: This Change Order, when executed by the parties to the Contract, shall constitute an amendment of the referenced Contract. Except as provided herein, all terms and conditions of the Contract remain unchanged and in full force and effect. Payment provided for in this Change Order set forth herein, if any, are full and complete compensation to the Contractor for the change(s) to the work, deleted work, modified work, direct or indirect impact on the Contractors schedule, and for any equitable adjustment to which the Contractor may be entitled, pursuant to the Contract between the Owner and Contractor or any other basis whatsoever. Contract Item Estimated Revision in. Contract Ouantities Number Description (-) Decrease (+) Increase 1.10 24" GALVANIZED CORRUGATED REVISES ESTIMATE QUANTITY FROM METAL PIPE 17 GUAGE 266LF TO 273LF This change reflects the increase of length f r the culvert designed for Sta 11+70 which originally was 70,F and now will be 77LF to allow it to extenc through landscap berm. This will increase the cont act from $200,198,50 to $200,583.5 This Change Order is approved with the understanding that: (1) the total contract price may decrease or increase by the actual quantity of materials deleted or installed as requested above and as paid for at extablished unit contract prices, (Z) no additional cost except as described in (1) will be borne by the Owner due to these revisions. Actual net decrease or increase in the total contract price will be reflected in the monthly and/or final pay estimates to the Contractor, (3) the contract time is not changed. APPROVED: KODIAK ISLAND BOROUGH APPROVED: BY: '� C.L �/l �v.ya� CONTRACTOR: �14 —L,...,,�?�[X';-7z J DATE: Z.�- ( BY: %lAJ D BKIB DATE: t r'567R 67R Y�f Z- a