Loading...
KODIAK TWNST BK 1 LT 9A-3 - ZCP 12/13/2023Kodiak Island Borough Community Development Department AMIL 710 Mill Bay Rd. Rm 205 .' Kodiak Ph. (907) 486 - 9363 Fax (90 (907) 486 - 9396 14-1 http://www.kodiakak.us Zoning Compliance Permit Property Owner / Applicant: Mailing Address: Phone Number: Other Contact email, etc.: Print Form Submit by Email N 111111111111111110 15647 Permit No. CZ2020-030 The following information is to be supplied by the Applicant: JEANNINE M MARSH 710 Mission Road 907-486-6138 Steve DeHart 907-539-1748 Legal Description: Subdv: KODIAK TWNST Street Address: Use & Size of Existing Structures: SFR Block: 1 Lot: 9A-3 Description of Proposed Action: Parking deck 18' x 24' Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: R2 KIBC 17.80 PROP —ID 15647 Lot Area: Lot Width: Not Applicable Bldg Height: Not Applicable Front Yard: Not Applicable Rear Yard: Not Applicable Side Yard: Not Applicable Prk'g Plan Rvw? Not Applicable # of Req'd Spaces: Staff Compliance Review Notes and Specific Plat / Subdivision Requirements: Subd Case No. Plat No. 85-41 Bld'g Permit No. Does the project involve NO an EPA defined facility? *Commercial buildings, installations (military bases), institutions (schools, hospitals) and residences with more than four (4) dwelling units. Driveway Permit? Septic Plan Approval: Fire Marshall: Proof of EPA notification provided (if required)? NO -Requiredfar all demolitions, for renovations disturbing at least 160 square feet, 2601inear feet, or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and for renovations that remove a load -supporting structural member. No Permit will be issued for such Projects without Proof of EPA notification Applicant Certification: 1 hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan List Other: Date: \ -� �D I t Signature This permit is only for the proposed project as described dy fhe applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED. "EXPIRATION. Any zoning compliance permit issued is subject to the same expiration, suspension, and revocation provisions as a building permit issued for the same construction permit.** CDD Staff Certification Date: i I15 �� CDD Staff: Payment Verification Zoning Compliance Permit Fee Not Applicable ❑ Less than 1.75 acres: 1.76 to 5.00 acres: 5.01 to 40.00 acres: 40.01 acres or more: ■ in Cashier's Office Room # 104 - Main floor of Borough Building $0.00 $30.00 $60.00 $90.00 ❑ $120.00 After -the -Fact 2X the published amount ❑ $0.00 L7 U ❑ $120.00 ❑ $180.00 PAID❑ $240.00 Nov 15 V19 &W K091Ait!bt(A1V aUUHUUGh PA]AWrnp q>yT��^ltij 11 Uaes�.eK � Ri�lz� ,[ofs 9A�98, ,8,bc ,lied,: k Tewnsi e ,Ce4s ICI, :: R IB