Loading...
OCEANVIEW LT 33 - ZCP 2/22/2023Kodiak Island Borough Community Development Department -� 710 Mill Bay Rd. Rm 205 RA Kodiak AK 99615 D Ph. (907) 486 - 9363 Fax (907) 486 - 9396 Zoning Compliance Permit Permit No. The following information is to be supplied by the Applicant: Property Owner/ Applicant: Q W 1~ 1r ,_ M A t-FI 1N E M R R fv N Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: Street Address: Use & Size of Existing Structures: ItoDtPrKOt.J f tJ�cD GMAtt C4 M Subdv: 0eEAN J 1 t0 Block: Lot 33 11- 2-3 1-3 t{ou 5 Kod s-r- y9GlS i=Stl)V,Ail IOfL, ttOmg SIM77q t-dmit-y 2#1 , id /Mml tt k 6 6 Description of Proposed Action: Site Plan to include lot boundaries and existing easements, existing buildings, proposed tojarion of new construction, access points, and vehicular parking areas, As Built required with all improvement changes. A- fy) C4V Staff Compliance Review: Current Zoning: +n •t 1-1—75 PROP_ID LIM Lot Area: rl W Sq. QL Lot Width: Building Height: r ---_ Front Yard: aRear Yard: , � Side Yard: Parking plan? g�a �g {45 tJ• N Of Req 'd Spaces: n"t As Built: omp rance Review Notes and Specific Plat / Subdivision Requirements: Subd Case No. Plat No. Building PermitNo. ci Does the project involve an EPA defined facility? N o •commercialbuildings, installations (militaryboses), institutions (schools, hospitals) and residences with more than four (4)dwelling units. Driveway Permit? Septic Plan ,! Approval: 'Y Fire Marshall: Proof of EPA notification provided (if required)? 'Required for all demolitions, for renovations disturbing at least UO square feet, 2601inearfeet, or.15cubicfeetof Regulated Asbestos Containing Material iRACM). and far renovations that remove a load-supportingsimclurel memberer. No permit will be issued for such Drojacts without proof of EPA notification ADDII cant CeitMcat 4on: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and the I have the authority to certifythisas the property owner, or asa representative of the propertyowner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? ^ f\ 5 �LtiL I List Other. E NS2 e pf'A NS Date: Z I �G6 i 23 Print Name: Date: I FL� 'Z 3 Signature: S MPf0z-rN C)wcN This permit is only for the proposed project as described by the applicant If there are any changes to the proposed project, including its intended use, prior to or during itssiting, construction, operation, contact this office immediately to determine if further review and approval of the revised project is necessary. THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED. "EXPIRATION: Anyzoningconrpliancepennitissuedissubject to thesameexpiration, suspension, andrevocation provisions as building permit issued for the same construction permit. ** COD Staff Cerrt0fication Date: A Oildi]��J COD Staff: Payment Verification Zoning Compliance Permit Fee Payable in Cashiers Office Room It 104- Main floor of Borough Building After -the -Fact 2X the published amount Not App licable El $0.00 ❑ $0.00 Less than 1.75 acres: $30.00 $60.00 1.76 to S.00 acres: $60.00 $120.00 5.01 to 40.00 acres: $90.00 $180.00 40.01 acresor more: $120.00 $240.00 �V j,od o� N� Y O � \ OA ' T Z •'y m HOUSE N LOT 33, 00 30 N P �T. AS- BOIL T SURVEY TPARCO BY. NOR170N 1 CNO .... JX Nolen 1. Rafter. match existing #2 HF 2x6 minimum 2. Rafter, 11 P BCI 5000-19 DP. Web end joint blocking req.ircd. 3. �. ridge board. Construct 5 ". pony wall underneath. 4. Roof with e. exposure L plywood and roof to match existing. Use a sealing roof membrane such as grace ice and water shield over entire low pitch rod. 5. Ceiling joints, 9 f" BCI 5000 DF. HU2.n and HU2. h X SR3b4 hangars into ledger board. Both web and joist blocking required for pony wall set atop ceiling joists. G. Joint blocking. 4. Web blocking. 8. 'i" Plywood web blocking 9. Simpson LSTA 12 strop, attach BCI to plywood or m opposite rafter with 10 ea 2 P x .0148" fasteners 10. Simpson SDS25312 screws. Remove aiding and place emewn through sheathing and into existing wall muds. 11. Ledger board, rafter ledger board shown, ceiling joiet ledger board similar. 1 x 11'Wcrsa-lam LV 2400 BY tu'mr 2 twiner Attxen hm[ 4 1' nl Ix Srmwvuli,Pk. oo na--m22 Sheet 9 of 9 Notes 1. Rafter, match existing N2 HF 2x6 minimum 2. Rafter, 111. BCI5000Q.7DF. 3. a" ridge board. Rafter support with either a tapered board or Simpson VPA2.1 supports. Construct 5J" pony wall underneath in plane with matmgwall. 4. 11'. 11 z" VersmLAM LVL 1.8E 2650 Ladger board. 5. # 6x8 HF beam, support beam in n-" - use Surpass hanger on existing wal 6. 2" x 3" purlins at 24" o c. under clew 9. Simpson VPA2. 1, web and joist blocl rafters. 8. 2" x 6" save blocking,. Extend up B( minimum. 9. Simpson HU2.119X SKL54 SLD9, w, required. 10, Simpson HUC68 banger 11. Use lumber blocking under rafters, I rafters. 12. Ceiling joists, 9 t BCl 50M DF. HU HU21/9X SKL54 hanger. into ledge web and joist blocking required for 1 atop ceiling joists 13. Provide slue clo ng between m ti attic. Ventilation requirements 14, Provide a minimum if 168 square inches of fee ventilation at under rave. Ensure an open path between and under roof rafters. 15. Provide ventilation through well blocking, a mildmur openinga totaling 96 square inches per rafter bay - 16. Provide lower save ventilation, requires a minimum of 3.43 square inches of fee opening per linear foot. /.l Roof Pram, U • .:WWI; son« 2o22 Sheet 8 of 9 Hotel: Engineering: 12• L Floor Beam, 3 J' x I I J' Vema-Lam LVL 1$E 2650 DR iae Ro ideotia U 2. Floor joist, 11 J"BCI 5000Q.7 DF. 4o.symomm,eE. 3. Ledger board, 19' x 11 a'Vema-Lam LVL 2900 DF. ut ns yad;,t,s6yya,s 4. Simpson HU 2.L9, web blocking required. rI'l. 5. Simpson HU 2.1/9 SKL54, web blocking required. 416" 6. Simpson HU 2.119, SKR36, web blocking required. 7. Simpson SDS25312 Remove .fir screws. aiding and place M 1 sinews through sheathing and into existing waR studs. 0 6. Simpson LUC26 for end of beam at waR. ,4 n Slll Attachment � 0 � kf'i -M \2/ p 1' 2' �' a' Sq,e:1-]/Ybl' Ll � m M,a• 3 y o s rl Foundation �'o O 7y rb r. r s.,ir: Ua•tor a .'v a .. e-e - s - e� i f N Pa i A O 54°we A A i=q Dali smn.d sonr eo:z � " Re,iud'2flJ"n 2112:4 Sheet 7 of 9 1 —` rl Foundation Plan 9..1 8.. 9..1 8" 11 2 3.. J 2 Foundation Pier RII Notes6. 1. Centerline of columns are offset so finished walla line y. 3 j" x Ile" Veraa-Lam LVL 1.8E 2650 DE.3. 1& Simpson PBS44111j)G poet base. 4 ea vertical reinforeemenl, 4" from top with 6.25" legs 3" from bottom of looting. up with existing walls, verify offset with existing 8. Blocling required. 19. 24" bigfoot form or similar, bottom of footing 36" " structure. 9. Hanger varies, cee sheet 6. below grade. 0'1" eo'U¢ W22 2. 24" diameter bigfoot concrete forms with embedded 10. Sheathing paced on Bangs ofPjoiet to east joist bay I5. it slopes to drain and Grade area as required so it gn—d .r,x.tpy Simpson PBS4 G column bases, before insulation is placed and before floor sheathing bottom of Boor Gaming is a minrmum of 18" from 3. Batt insulation. is installed, finished grade. Sheet 4. Floor sheathing IL 8" diameter pier. 16. Existing wooden walkway and concrete apron at 5. fl exteriorsheathing, aide to match existing. 12. 4"OD hoops, 16" ac. doorway. 6 OC 9 Engineering: Jre'a Ruihnlul5eniva lx SSmomYi.PE rsntumSl Knd',ak AX.15 ❑ 0 m 0 x� y M ;8 3 w c w o..x O , " 3 0 0 0 w " 0 C is O yI ry Q 2 Moo w 4f.. NN, ® 2..L.� `g �"'airisw` Q Q has g, Sba,, 30 Dw 2022 R—a saaan 2. Sheet k>op �aa 5of9 Window Schedule Mark Conf Width Hight Notes Q Slider X-O�X 2'�0" 3'�0• Remove wivdsw, reinstall at Mark 2 Verily egress campliavice, Qi Slider X�O�X 5'�0" 3'�0• opening a mivimum of 20" j wide, 24" high, sill vo more than 94• shove finished Roox 0' Slider O-X 3'�0" 3'�0" Pcoeted Q X 1'�10 V2" 1'-10 1/2" Q X 1'�101/L" 3'QO ll2" Door Schedule Mark Type WidN Height 1 Existing da v/a � Remwe door for reuse at Mark 2 3 Exterior 3'0" 6`S" Pocket 3'-0" 6'-g" Header Schedule Mark Header #King Studs #lack Studs 1 2x4 flat I 1 2ea 2x10 I 1 J 2ea 2x6 1 I Engineering: JeffsRaideotial Sni«s Jm SJmono .Yk. 1517 L=h St Katlal.AKM15 ti a m O m O x� � M 4) 3 � o o lr.z 3`71'if3'-108 � 4 �2 ,,1 4' 5 y w 3• o _W ® 16, 5' 2 �. NM 7•. 2" g. del 23'-1116' a^ s�. .a aao- zaza Re�isvd 28JnnY023 Sheet i Floor %an J 4 of 9 Engineering: iue.R.eoe,wiaa— Note. Ice Synwno4i. P.E. H1➢Lxh St 1. Demo existing had vxf. KMekk sK 9.0 2. Demo existing entry, does door operang, retain door for reuse. an 3. Remove existing window and retain for reuse. > 4. Saturate oil tank 0 north aide of p ban". 5. Reposition or replace 2nd Door m window at ..a. discretion due to new roof interference, m M ;a S o w o..x 0 3 p Shed Roof 0 Shed Roof Cd Q s� i W Entry o \Vtl pMA 4 i T .� T.^'. .... rttn Syoed 3o D -2022 Sheet 3 of 9 Engineering: Jo2:RUWentiSenior J. SLm hSl i. PE. 1517 xh5 KdieL.hK 99415 r-I A mO�,�1 W O x ® dMb B N o w O O O O Sr ' & W W w z c S Ree+:d 28Jen�POrzS Sheet 2 of 9 6ENERgLN03E5: Resign ailena 1. Design matls guests assets loads, unless not" otherwise: b. Fknrlwakend one-anitwofsmady"elltng 40 psi L Raifr loads anstructionPiee load zo pal L Rmfsnow load criteria Nat roof mass lwi pf 40,1 2 Wnd criteria wind speed 166 mph L Milk ralegory II j. Exposure d L Impmtanw latloc the To 3. Seismic criteria a.Nsk.,c,, 11 I, Imromance Faro: ie ]0 $eiamir design category d a. SR. [lass a ads 1666 2.og2 g. :1 1.141 3. Foundation Criteria a. Sail Rearing Pressure 3.O00 pit R. Fr. depth 36' Al construction shall comply with the following codes. 1. Building and structural: 20121mernational Residential Code and/air the 2M2 waotl Frame Construction Manual 2. plumbng: 2018 Uniform Plumbing Code, 3. Mecbanial 2OU International Mechanical Coala. 4. Elmai"k 2012 National Electskal Catle, 5. Fire praledio¢ 2012 International Fire Cade GENERAL 1. venly dimensions and mnctions with the a rrhNerturaldrewings. Field surge dimensions and d e.b.n.reB. to the reistng strumure pna to fabaiotron of materials. z. For Natures of construction nor fully shown, proarde the same We and character as shown for similar mnditimb mbNm ro rewew by the architect and structural engineer of record. 3. m erldivn place, ered, By with maouf I urs,s aproducts and osruction. 4. Mequaery brace swolue and all structural comp grams force; and Use permanent entlateral for�mressl ngmic systems have wear hadedled. SITE PREPARATION 1. Remoee vegetation, rubbish, and existing fill wihinbuiltlingbwtaintantl 5' r(mimmuml beyond the foolpdnT Strip lop V of sill, minimum. E. Remove areas of sill, as required, that ca ibe exceadive unngair deflection under the weight of the rater m dump Loop. 3. Bed, fill excavated areas with Unitural fill as described Mmw. C. Materials And and gravel mixture or cashed rack d. .11 .tied Imam rwrse to fine enN R. than lo%by amEm aftbe minus V harnn ponds, the ooae Free of mgania, rubbish, day balls orracks larger thane 1. Mace Urudmal fill in now hills, misimomofa- in IhiMen 2. Compact structural fill m a minimum density of 95%Mmadmum dry, density, as determined by ASTM d 1553 S. Venlyatlequam of structural fill compx0an wish r ad -field density lasts. MUNRALN)N CRRERM 1. Place footings an firm, undisturbed names soil .structural fill (we -strunurid MPot nes for ddm idmdmfo.mation) 2. locale bottom of froomp below minimum frost depth unless atherwise noted. 3. Prior to placement of concrete, remaae all disturbed soil from bating eamation. CAST IN -PLACE CONCRETE 1. All warm, work shall conform to Ui 301. 2. Prepare mites for each type of wnaete. Propodion mires by either laboratory trial batch or field eaperience methods, uatmg, materials to be employed on the work for each claw of wnaete required as spedf din act Sol. 3. AtlmA2ures: Air entraining agent In aroraanm with aatm WEB and water-redmne admixtures wnfomdng to astm 4%, used in strict accareence with the nufadurers recommendations, may be Imoramated I. .,,.,a desten motes. R. Mair-hexing Went conforming to whir U6o shall be used In wnaete miles far exterior non ontalsurf cesea towenher. theamount of emtaNed air shall be 5%-7%byuolume_ c. Fly ash shay rmfarm to asM c ila and shdl be limited to 15%ma imum cemen@nus material By weight. 4. Use porniand cement We l or ii; conform with ASRd c 150. supply from me (1) so 5. Aggregales shall amfarm with mum a 33 and be thoroughly showed and washed prior to us. 6. Concrete strengths Be as Banner: a. Listings: Pc= 3,013O psi at 28 days (designed for 2,500 psi), 2. No water shall be "tied to the concrete other than that required by the miss design apprwea by the engineer of record. a. All bolmgs shall be installed such that the base alt,a timing is below local host depth, or placed on ambost smcepubk fill that etlendOF below finishedgrade. The bottom afthe fill shall contain drain to daylight M rantln ounfmtings T Remmcogaeelchanbedefasmedmis informing to astm a615. grace 0 unless noted otbeneise. z. Reinforcing steel tobe welded shall conform to aatm a.. 3. Unless noted Otherwise all remfncementlap spit¢; his be as follows: bar size spbte lh<=3500psd R4 32� 4. Support all reinforcement on appropriate chairs clatter methods to ensure placement of senfm<ement. . posmming aanforament during tancrete placement by lifting or mown, Use reinforcement Into peas is prahibued. CORCRETEACCExo ORIES: L. Receded studs a. extra f1554, gr"a 36 STRUCTURALSTEEL I. Structural steel shall be a$ fellows, unless noted otherwise Hollow structural smions(hss): as. a500, grade W(N=46 m) z. All welds percomrzd shall conform to th, aws standards her arc antl as weldion in to did ng nmstmotion and shal be 3/16^ minimum unless oted otheadae. 3. welds shall bemade:sine e]oveleRra m Engineering 4. Welding shall be daneby aert mrtifiM tuckers S. PrequalfiM welfing procedures are to be Jm sRrsiknlial5en used. 1« slmowski. pE. FRAMING LUMBER 1, Sawn lumber shall canfmm to west coast lumberiinograding umeam orevestem wood products 25 camber species Sigrades to be dangles firm.; arbetter (hem -flat. l air better for pressure treated) unless noted omervnse: 3. All lumberer permanent contact wM wncrits SPECRL INSPECTION 1, <%6 welds (periodic inspection) I. Veer =2 Sheet 1of9 t�. a-0 �pROpl 51 PPuL AS- BUILT SWPVEY ' I j ,I %'' I PAYMENT DATE 02/22/2023 COLLECTION STATION CASHIER RECEIVED FROM MARTIN OWEN DESCRIPTION 1223 W KOUSKOV ST Cz Kodiak Island Borough 710 Mill Bay Rd. Kodialy AK 99615 Payments: Type Detail Amount Check 1392 $30.00 Total Amount: BATCH NO. 2023-00000252 RECEIPT NO. 2023-00000769 CASHIER Teresa Medina $30.00 Customer Copy Printed by: Teresa Medina Page 1 of 1 02/22/2023 10:32:47 AM A ""c I