Loading...
FY2020-13 Sole Source Agreement for Replacement of Sprinkler Piping at KFRC TowerU LLC 725 W Wasair Dr Ste I Wasilla, AK 99654 Phone 907-373.1760 Fax 907-373-5760 November 26, 2019 Kodiak Island Borough Attn: Dave Conrad Re: KFRC Tower Pipe replacement Dave, Quote 19-348R Taylor Fire Protection is pleased to offer this quote for replacing the rotted outside section of the tower sprinkler system with galvanized pipe and fittings. All work will be performed to meet current code and will be conducted to meet an agreeable schedule. The total price to perform these tasks will be as follows: 1. Replace rotted pipe in the Tower area $ 12,030.00 2. Sub -Contractor to be Billed on a Time and Material Basis $ TBD 3. Sub -Contractor Estimated Price $ 30,781.00 4. Sub -Contractor Not to Exceed $ 38,367.00 S. Sub -Contractor to provide equipment operator $ 1,800.00 6. Travel and expenses $ 900.00 TOTAL ESTIMATED PRICE $ 45,511.00 TOTAL NOT TO EXCEED $ 53,097.00 Included is the following: • Labor • Parts and Materials • Travel and expenses Excluded is the followina: • Removal or replacement of exterior panels or other building materials. • Any work not specifically included in the qualifications above. • Any additional work required by the Fire Marshall or other approving agencies. • Delays caused by others, including weather delays, will be billed at $140.00 per hour, and are above and beyond the scope of the work in this proposal. The quoted price will remain in effect for 30 days. Should you have any quest -ions, please contact me. 144— Sincerely, Signature of approval DA YD CONRAD Frederick Naef Dat