Loading...
USS 3218 TR M BK 1 LT 1A-2 - ZCP 4/1/2021Kodiak Island Borough �. Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 Ph. (907) 486 - 9363 Fax (907) 486 - 9396 - - http://www.kodiakak.us Zoning Compliance Permit Permit No. CZ Z(y - The following information is to be supplied by the Applicant: Property Owner /Applicant: Alagnak, Inc Mailing Address: Phone Number: Other Contact email, etc.: L ID PO Box 1275, Kodiak 907-942-1515 (Angela McFarland) es. escription. Subdv: V3 J 3 2 Street Address: 2625 Mill Bay Rd Use & Size of Existing Structures: Offices Block: 1 Lot: 1 P) _ 2. Description of Proposed Action: Would like to add three small offices to the large open area on the right side of building Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: Business Lot Area C) . Lot Width: Front Yard: (v Rear Yard: KIBC 17.90 N 1 +� f\j Prk'g Plan Rvw? N C) 4 of Req'd Spaces: Staff Compliance Review Notes and Specific Plat / Subdivision Requirements: PROP —ID Bld'g Height: Sy Side Yard: N r F Qt�� -r,C1. No. f " Plat No. Bld'g Permit No. Does the project involve Proof of EPA notification provided (if required)? ^ \ o an EPA defined facility? 1�e-S*Requiredforalldemolitions,forrenovationsdisturbingatleast160square o�J *Commercial buildings, installations (military bases), feet 260 linear feet, or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and institutions (schools, hospitals) and residences with for renovations that remove o load -supporting structural member. more than four(4) dwelling units. No permit will be issued for such proiects without proof of EPA notification Driveway Permit? Septic Plan Approval: Fire Marshall: �Q s Applicant Certification: I hereby certify that/ will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan List Other: Date: Z Zi Signature: Tre This permit is only for the proposed project as described by the applicant. If there are y changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED. ** EXPIRATION: Anyzoning compliance permit issued is subject to the some expiration, suspension, and revocation provisions as a building permit issued for the same construction permit.** CDD Staff Certification Date: / 2 CDD Staff: C �2i Payment Verification Zoning Compliance Permit Fee Payable in shier's Office Room # 104 - main floor of Borough Building After -the -Fact 2X the published amount Not Applicable ❑ $0.00 ❑ $0.00 Less than 1.75 acres: ` $30.00 ❑ $60.00 1.76 to 5.00 acres: ❑ $60.00 ❑ $120.00 5.01 to 40.00 acres: ❑ $90.00 ❑ $180.00 40.01 acres or more: ❑ $120.00 ❑ $240.00 d u