Loading...
MILLER PT 1ST BK 9 LT 5 - ZCP 12/2/2020Kodiak Island Borough Print Form Submit by Email F Community Development Department 710KMill Bay Rd. diak AK 99615205 111111111111111111 Ph. (907) 486 - 9363 Fax (907) 486 - 9396 21871 http://www.kodiakak.us Zoning Compliance Permit Permit No. BZ2021-017 The following information is to be supplied by the Applicant: Property Owner / Applicant: James Peterson Mailing Address: PO Box 2290, Kodiak Phone Number: 907-654-4495 Other Contact email, etc.: jimnkim@gci.net Legal Description: Subdv: Miller Pt. 1st Addition Block: 9 Lot: 5 Street Address: 839 Mallard Way Use & Size of Existing Structures: Home is 26 x 40' two story. Unattached shop is 26x40'. Description of Proposed Action: I wish to place a 40' x 8' conex next to shop for storage. Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: RR1 KIBC 17.70 PROP —ID 21871 Lot Area: .92 ac Lot Width: 120' Bldg Height: 35 ' Front Yard: 25 ' Rear Yard: 20' Side Yard: 10, Prk'g Plan Rvw? Not Applicable # of Req'd Spaces: Staff Compliance Review Notes and Specific Plat / Subdivision Requirements: Subd Case No. Plat No. Bld'g Permit No. Does the project involve an EPA defined facility? *Commercial buildings, installations (military bases), institutions (schools, hospitals) and residences with more than four (4) dwelling units. Driveway Permit? Septic Plan Approval: Fire Marshall: Proof of EPA notification provided (if required)? *Required for all demolitions, for renovations disturbing at least 160 square feet 260 linearfeet, or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and for renovations that remove a load -supporting structural member. No permit will be issued for such projects without proof of EPA notification Applicant Certification: 1 hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that 1 have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan List Other: Date: Oct 1, 2020 Signature: This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED. ** EXPIRATION. Any zoning compliance permit issued is subject to the same expiration, suspension, and revocation provisions as a building permit issued for the same construction permit.** CDD Staff Certification Date: Oct 1, 2020 CDD Staff: Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Roor"r-f104 - Main floor of Borough Building After -the -Fact 2X the published amount Not Applicable ❑ $0.00 ❑ $0.00 Less than 1.75 acres: FX-J $30.00 ❑ $60.00 1.76 to 5.00 acres: ❑ $60.00 ❑ $120.00 5.01 to 40.00 acres: ❑ $90.00 ❑ $180.00 40.01 acres or more: ❑ $120.00 ❑ $240.00 n o ei Zo I O