ALDERWOOD BK 1B TWNHSE COMMON AREA - ZCP 8/19/2020Kodiak Island Borough Print Form Submit by Email
Community Development Department
710 Mill Bay Rd. Rm 205
*
64, Kodiak AK 99615
,
Ph. (907) 486 - 9363 Fax (907) 486 - 9396
http://www.kodiakak.us
Zoning Compliance Permit Permit No. C20oD _,00-7
The following information is to be supplied by the Applicant:
Property Owner /Applicant: ���� O < —Tb uz r\\\f ,� s
Mailing Address: (� (� �� 2 n 2Q r �—��^,�nu lam` \C -
Phone
1(
Phone Number:
Other Contact email, etc.:
PfOJoe-c`LA , Li Q -�e f -a @ � • c" or,
Legal Description:�J U
Subdv: �
�'e_r LAJOO Block: Lot: c W S, a1 mm",
Street Address:
Use & Size of Existing Structures: t c�
Description of Proposed Action:
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points,
and vehicular parking areas.
Staff Compliance Review: Current Zoning: n PROP—ID 59 3 0
r
Lot Area: 319 Lot Width: / _ Bld'g Height: 3 '� 1
Front Yard: Rear Yard: I 0
Prk'g Plan Rvw? 1 # of Req'd Spaces:
Staff Compliance Review Notes and Specific Plat / Subdivision Requirements:
Side Yard: N 16 -Q LJf L,'/V
Subd Case No. Plat No. Bld'g Permit No.
Does the project involve
an EPA defined facility?
*Commercial buildings, installations (military bases),
institutions (schools, hospitals) and residences with
more than four (4) dwelling units.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Proof of EPA notification provided (if required)?
*Required for all demolitions, for renovations disturbing at least 160 square
feet, 260 linear feet or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and
for renovations that remove a load -supporting structural member.
No permit will be issued for such projects without proof of EPA notification
Applicant Certification: I hereby certify that) will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? List Other:
Date: ' 0 Signature: AV (-14ULQ-�
This permit is only for the proposed project as described by the ap cant. If there Yt a any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED.
**EXPIRATION. Any zoning compliance permit issued is subject to the same expiration, suspension, and revocation provisions as a
building permit issued for the same construction permit.**
CDD Staff Certification
Date: r7 O CDD Staff:
Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building
After -the -Fact 2X the published amount
Not Applicable F1 $0.00 ❑ $0.00
Less than 1.75 acres: [0 $30.00 F-]$60.00
1.76 to 5.00 acres: F-1 $60.00 F1 $120.00
5.01 to 40.00 acres: $90.00 $180.00
40.01 acres or more: $120.00 $240.00 1 ��
Ck
O