Loading...
NEW KODIAK BK 3 LT 2-6 - ZCP 7/29/2020Kodiak Island Borough ' - Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 Ph. (907) 486 - 9363 Fax (907) 486 - 9396 http://www.kodiakak.us Zoning Compliance Permit Property Owner/ Applicant: Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: Street Address: Use & Size of Existing Structures: Description of Proposed Action: Permit No C ZIZU211 -0()S The following information is to be supplied by the Applicant: Housewright Construction 2056 Ridge circle 907-539-2444 Subdv: NEW "O I AKG 210 Shelikof Street Sutliffs Hardware Siding and rot repair Block: 3 Lot: Z — (p Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning-. , PROP(,,�cj _0 Lot Area: 1 I_ Lot Width: Bld'g Height: Front Yard: Prk'g Plan Rvw? Staff Compliance Review Notes: Plat/Subdivision Requirements: Rear Yard: ># of Req'd Spaces: Side Yard: Subd Case No. Plat No. Bld'g Permit No. Does the project involve an EPA defined facility? *Commercial buildings, installations (military bases), institutions (schools, hospitals) and residences with more than four (4) dwelling units. Drivewa y Perm id Sep tic Pla n Ap p rova 1 Fire MarshlaI Proof of EPA notification provided (if required)? "Required far all demolitions, for renovations disturbing at least 160 square feet 260 linear feet or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and for renovations that remove a load -supporting structural member. No permit will be issued for such projects without proof of EPA notification Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Alla di m erts ? lis t O th er: /(. �� f layno -',IN Da le: 7-13-2020 Sig re tire: This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED. ** EXPIRATION: Anyzoning compliance permit issued is subject to the same expiration, suspension, and revocation provisions as a building permit issued for the same construction permit. ** CDD Staff Certification Da le: �- -' 2,b� CDD Sia f !-Ad j Payment Verification Zodrg Com pal rre Perm itFee Pa ya to in Ca s h ier'40111oe R oorri# 104- M a irf oorofBoroughBuidirg Afer-the- Fa ct2X1he p ubis heda m ourt ❑ $0.00 ❑ $60.00 ❑ $120.00 ® $180.00 ® $240.00 N otAp pida ble ❑ $0.00 Les sth a n1.75 a cres : $30.00 %17 1.76 to 5.00 a ores : ❑ $60.00 5.01 b 40.00 a cres : ® $90.00 40.01 a cres o r m o re: ❑ $120.00 Afer-the- Fa ct2X1he p ubis heda m ourt ❑ $0.00 ❑ $60.00 ❑ $120.00 ® $180.00 ® $240.00 k6z ]UN lRoorr- HCUS"ht CorWUCtion . OUAL17 NOM COAVROAOD Work order agreement iconsultation I —David nmerman—owner of prop" located at, .-7,10 Shelikof St—agree, to the Wowing terms.. •All carpentry labor/censultation-will be billed.at $70 per man-hour. Laborer rate will be billed at$gSperman-hour. All heavy equipment will be billed at $70 per hour. All purchased materialswill be billed atretall cost Inventory Materials will he billed at retail cost.. Billing cycle Will beweedy: Payment Is due wiWo 7 bugaoso days of date an WEL Failure to make -payment will result in, a daily 10% interest Owner will be responsibWWr ARA6000ary permfts;4, and Inspections. Owner agrees to remove aurobstructions ( vebicles, materials, ect ) that may hinder OW flow of a productive job site. • All timate -disposal fees will be billed to owner. • Exterfor/Interfor elecuicity will be supplied by owner. • Freight charges will be included in. weekly billing. • Sub contractor supplied by Housewright.will be billed through Housewright with a IS%; increase for wnsultation andscheduling. Housewdght Construction Owner date date I/ I6/LULU v-rUD - I ransacuun MeceiNi Transaction Receipt - Success Kodiak Island Borough Kodiak Island Borough Community Development MID:200006988265 710 Mill Bay Road Kodiak, AK 99615 907-486-9323 07/13/2020 02:28PM Remittance ID Kodiak07132018252564713ay Transaction ID: 248300250 DAVID M PUTNAM 2056 Ridge Circle KODIAK, Alaska 99615 United States Visa - 9012 Approval Code: 01300D Sale Amount: $30.00 David Putnum 907-539-2444 CZ2021-055 210 Shelikof Street Service Fee: $1.00 Service Fee Type: Dual Transaction Total Amount: $31.00 Cardmember acknowledges receipt of goods and/or services in the amount of the total shown hereon and agrees to perform the obligations set forth by the cardmember's agreement with the issuer. Signature click here to continue. htfnc//vclnrihinwmont rnm/arimin/4nriia4a4hinnc/3QF7Mrancartinnc/rcrcint/9Pwmontlho9dA4M9F(1 1/1