Loading...
EAST ADD BK 40 LT 3 & 4 - ZCP 7/29/202017 Kodiak Island Borough Community Development Department ,4 `L 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 Ph. (907) 486 - 9363 Fax (907) 486 - 9396 http://www.kodiakak.tis Zoning Compliance Permit Permit No. CZ2020--051 The following information is to be supplied by the Applicant: Property Owner/ Applicant: Daniel Blizzard Mailing Address: 12_17 East Rezanof Dr. Kodiak AK 99615 Phone Number: (907) 469-0336 Other Contact email, etc.: danblizzard@aol.com Legal Description: Subdv: East Addition Block: 40 Lot: 3 $ 4 Street Address: 1217 East Rezanof Dr. Kodiak, AK 99615 Use & Size of Existing Structures: Single family residential home w/ current 5' X 12' wood deck on back Description of Proposed Action: Tear off and rebuild existing deck to make it 10'x 14' Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: _ 1211 Lot Area: �, 1 �'Ag Lot Width: Front Yard: Prk'g Plan Rvw? b5 FT Rear Yard: Staff Compliance Review Notes: Plat/Subdivision Requirements: # of Req'd Spaces: lD FT PROP_ID ��8g Bld'g Height: .35 PT Side Yard: 5 T-1 Subd Case No. Plat No. Bld'g Permit No. Does the project involve �O an EPA defined facility? *Commercial buildings, installations (military bases), institutions (schools, hospitals) and residences with more than four (d) dwelling units. Driveway Permit? Septic Plan Approval:' Fire Marshall: Proof of EPA notification provided (if required)? 'Required for all demolitions, for renovations disturbing at least 160 square feet 2601inear feet or 3S cubic feet of Regulated Asbestos Containing Material (RACM), and for renovations that remove a load -supporting structural member. No permit will be issued for such proiects without proof of EPA notification Applicant Certification: I hereby certify that 1 will comply with the provisions of the Kodiak island Borough Code and that 1 have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place far verification of building setback (yard) requirements. Attachments? s�•r� �(,�� '� List Other: Date: 5/14/2020 Signature: This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT 15 REQUIRED. • * EXPIRATION. Any zoning compliance permit Issued is subject to the same expiration, suspension, and revocation provisions as a building permit issued for the same construction permit. * * CDD Staff Certification Date: 51liaiZo2p CDD Staff: Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building After -the -Fact 2X the published amount Not Applicable ❑ $0.00 ❑ $0.00 Less than 1.75 acres:$30.00 FJ$60.00 1.76 to 5.00 acres: ❑ $60.00 ❑ $120.00 5.01 to 40.00 acres: ❑ $90.00 ❑ $180.00 40.01 acres or more: ❑ $120.00 ❑ $240.00 03/31/2014 HON 11tH PAX 9074811047 WAZTCO �IIA A ri � i d t IN �•V �V�Aa a � hMr g AS 4, Im ff i �IIA A n � � 3 D d 14003/013 A D d 14003/013 �v.p e f - A t4 i �4 IN g AS 4, V a �v.p e f - 0, 0 IL v ti i a w� �i v