Loading...
MOUNTAIN VIEW LT 7 - ZCP 12/6/2019Kodiak Island Borough Print Form Submit by Email 'r<,,, `. Community Development Department ;`` 710 Mill Bay Rd. Rm 205 II I I I I I r Kodiak AK 99615 I II I I III I I II I III !_.. Ph. (907) 486 - 9363 Fax (907) 486 - 9396 20615 http://www.kodiakak.us Zoning Compliance Permit Permit No. BZ2020-042 Property Owner/ Applicant: Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: Street Address: Use & Size of Existing Structures: Single Family Residence The following information is to be supplied by the Applicant: Rocky Fraser Et Al 1319 Mountain View Drive 907-654-7758 Rod Kiefer 907-539-1804 Subdv: MOUNTAIN VIEW Block: Lot: 7 1319 Mountain View Drive Description of Proposed Action: 6'x 6' water storage room 4'x 30' stairs & stairway enclosure Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Lot Area: Current Zoning: RR1 Lot Width: 120' KIBC 17.70 Front Yard: 25 ' Rear Yard: 20' Prk'g Plan Rvw? Not Applicable # of Req'd Spaces: Staff Compliance Review Notes and Specific Plat / Subdivision Requirements: PROP_ID 20615 Bld'g Height: 35 ' Side Yard: 15 ' Subd Case No. Plat No. Bld'g Permit No. Does the project involve NO Proof of EPA notification provided (if required)? NO an EPA defined facility? *Required for all demolitions, for renovations disturbing at least 160 square *Commercial buildings, installations (military bases), feet, 2601inear feet, or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and institutions (schools, hospitals) and residences with for renovations that remove a load -supporting structural member. more than four (a) dwelling units. No permit will be issued for such proiects without proof of EPA notification Driveway Permit? Septic Plan Approval: Fire Marshall: Applicant Certification: I hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Not Applicable List Other: Slie Date: 11 , Ia —0 - I Signature: This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED. "EXPIRATION. Any zoning compliance permit issued is subject to the same expiration, suspension, and revocation provisions as a building permit issued for the same construction permit.*'* CDD Staff Certification Date: 11. 12. 11 CDD Staff. V cp Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building After -the -Fact 2X the published amount Not Applicable ❑ $0.00 ❑ $0.00 Less than 1.75 acres: $30.00 $60.00 1.76 to 5.00 acres: $60.00 $120.00 5.01 to 40.00 acres: $90.00$180.00 40.01 acres or more: $120.00 A DF -]$240.00 NOV 12 2Itq AOIAKI�WW WUQGh _Y r�