MOUNTAIN VIEW LT 7 - ZCP 12/6/2019Kodiak Island Borough Print Form Submit by Email
'r<,,, `. Community Development Department
;`` 710 Mill Bay Rd. Rm 205 II I I I I I
r Kodiak AK 99615 I II I I III I I II I III
!_.. Ph. (907) 486 - 9363 Fax (907) 486 - 9396
20615
http://www.kodiakak.us
Zoning Compliance Permit Permit No. BZ2020-042
Property Owner/ Applicant:
Mailing Address:
Phone Number:
Other Contact email, etc.:
Legal Description:
Street Address:
Use & Size of Existing Structures:
Single Family Residence
The following information is to be supplied by the Applicant:
Rocky Fraser Et Al
1319 Mountain View Drive
907-654-7758
Rod Kiefer 907-539-1804
Subdv: MOUNTAIN VIEW Block: Lot: 7
1319 Mountain View Drive
Description of Proposed Action:
6'x 6' water storage room
4'x 30' stairs & stairway enclosure
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points,
and vehicular parking areas.
Staff Compliance Review:
Lot Area:
Current Zoning: RR1
Lot Width:
120'
KIBC 17.70
Front Yard: 25 ' Rear Yard: 20'
Prk'g Plan Rvw? Not Applicable # of Req'd Spaces:
Staff Compliance Review Notes and Specific Plat / Subdivision Requirements:
PROP_ID 20615
Bld'g Height: 35 '
Side Yard: 15 '
Subd Case No. Plat No. Bld'g Permit No.
Does the project involve NO Proof of EPA notification provided (if required)? NO
an EPA defined facility? *Required for all demolitions, for renovations disturbing at least 160 square
*Commercial buildings, installations (military bases), feet, 2601inear feet, or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and
institutions (schools, hospitals) and residences with for renovations that remove a load -supporting structural member.
more than four (a) dwelling units. No permit will be issued for such proiects without proof of EPA notification
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Applicant Certification: I hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Not Applicable List Other: Slie
Date: 11
, Ia —0
- I Signature:
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED.
"EXPIRATION. Any zoning compliance permit issued is subject to the same expiration, suspension, and revocation provisions as a
building permit issued for the same construction permit.*'*
CDD Staff Certification
Date: 11. 12. 11 CDD Staff. V
cp
Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building
After -the -Fact 2X the published amount
Not Applicable
❑
$0.00 ❑ $0.00
Less than 1.75 acres:
$30.00 $60.00
1.76 to 5.00 acres:
$60.00 $120.00
5.01 to 40.00 acres:
$90.00$180.00
40.01 acres or more:
$120.00 A DF -]$240.00
NOV 12 2Itq
AOIAKI�WW WUQGh
_Y
r�