LAKESIDE BK 3 LT 1 - ZCP 11/4/2019Subd Case No. `" ,,Plat No. k, „ 1 Bldg Permit No.
Kodiak Island Borough Print Form
Submit by Email
Community Development Department
710 Mill Bay Rd. Rm 205 VIII I II II I III
Kodiak AK 99615
I
Ph. (907) 486 - 9363 Fax (907) 486 - 9396 16409
http://www.kodiakak.us
Zoning Compliance Permit Permit No. CZ2020-019
The following information is to be supplied by the Applicant:
Property Owner / Applicant: Mill Bay LLC - Stosh Anderson
Mailing Address: PO Box 310, Kodiak
Phone Number: 654-3674
Other Contact email, etc.:
Legal Description: Subdv: Lakeside Block: 3
Lot: 1
Street Address: Lq O ?j Vbn sc- 9Jl
Use & Size of Existing Structures:
Fishing Storage Lot
Description of Proposed Action:
10x12 storage shed with electric.
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points,
and vehicular parking areas.
Staff Compliance Review: Current Zoning: Industrial KIBC 17.105
PROP—ID 16409
Lot Area: .66 Lot Width: 75' Bld'g Height:
Not Applicable
Front Yard: 30' Rear Yard: 20' Side Yard:
20'
Prk'g Plan Rvw? Not Applicable # of Req'd Spaces:
Staff Compliance Review Notes and Specific Plat / Subdivision Requirements:
t
Subd Case No. `" ,,Plat No. k, „ 1 Bldg Permit No.
Does the project involve NO
an EPA defined facility?
`Commercial buildings, installations (military bases),
institutions (schools, hospitals) and residences with
more than four (4) dwelling units.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Proof of EPA notification provided (if required)? NO
'Required for all demolitions, for renovations disturbing at least 160 square
feet, 260 linear feet or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and
for renovations that remove a load -supporting structural member.
No permit will be issued for such projects without proof of EPA notification
Applicant Certification: 1 hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that 1
have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Not Applicable List Other:
Date: Aug 20, 2019
Signature: ✓, /,'�_
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED.
** EXPIRATION. Any zoning compliance permit issued is subject to the same expiration, suspension, and revocation provisions as a
building permit issued for the same construction permit.**
CDD Staff Certification
Date: Aug 20, 2019 CDD Staff:
Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104- Main floor of Borough Building
After -the -Fact 2X the published amount
Not Applicable
❑
$0.00 ❑
$0.00
Less than 1.75 acres:
®
$30.00 ❑
$60.00
1.76 to 5.00 acres:
❑
(( J n
$60.00F-] t( -' ` F-]$120.00
5.01 to 40.00 acres:
$90.00
Al
$180.00
40.01 acres or more:
E]$120.00
❑
$240.00
AUG 21 zM9
VADIAVOLAWWWOUG
�n�a�W-AAF Wr