Loading...
POWELL ESTATES LT 9 - ZCP 11/4/2019'^ Print Form Submit by Email Kodiak Island Borough A �Community Development Department 710 Mill Bay Rd. Rm 205 III I I II Kodiak AK 99615 III II II I Ph. (907) 486 - 9363 Fax (907) 486 - 9396 21573 http://www.kodiakak.us Zoning Compliance Permit Permit No. BZ2020-21 The following information is to be supplied by the Applicant: Property Owner / Applicant: Adam R Lutz Mailing Address: 3600 Sharatin Rd Phone Number: 1-706-466-6973 Other Contact email, etc.: David Putnam 539-2444 Legal Description: Subdv: Powell Estates Block: ----------- Lot: 9 Street Address: 3600 Sharatin Rd Use & Size of Existing Structures: Singe -family Residence Description of Proposed Action: 16'x 8' addition -laundry room Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: R3 KIBC 17.85 PROP ID 21573 Lot Area: 8043sf Lot Width: 60' Bld'g Height: 35' Side Yard: Front Yard: 25' Rear Yard: 10' Prk'g Plan Rvw? Not Applicable # of Req'd Spaces: Staff Compliance Review Notes and Specific Plat / Subdivision Requirements: Subd Case No. Plat No.,, t Bld'g Permit No. 5' Does the project involve NO an EPA defined facility? *Commercial buildings, installations (military bases), institutions (schools, hospitals) and residences with more than four (4) dwelling units. Driveway Permit? Septic Plan Approval: Fire Marshall: Proof of EPA notification provided (if required)? NO *Required for all demolitions, for renovations disturbing at least 160 square feet, 260 linear feet, or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and for renovations that remove a load -supporting structural member. No permit will be issued for such projects without proof of EPA notification Applicant Certification: I hereby certify that) will comply with the provisions of the Kodiak Island Borough Code and that) have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Not Applicable Date: Sep 19, 2019 List Other: Signature: This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED. ** EXPIRATION. Any zoning compliance permit issued is subject to the same expiration, suspension, and revocation provisions as a building permit issued for the same construction permit.** CDD Staff Certification Date: Sep 19, 2019 CDD Staff: w" Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building After -the -Fact 2X the published amount Not Applicable ❑ $0.00 ❑ $0.00 Less than 1.75 acres: $30.00 C-1 ❑ $60.00 1.76 to 5.00 acres: ❑ $60.00 C ❑ $120.00 5.01 to 40.00 acres: ❑ $90.00 F-]$180.00 40.01 acres or more: El $120.00I ❑ $240.00 KODIHWWWOUNUGh CIn1AAi %rnC0A0TAArAV7 Housewright Construction QUALITY NEVER COM?ROMiSED Adam Lutz 3600 Sharatin Road 8'x16' addition w/covered deck Housewright Construction responsibilities: • Supply all materials and labor. • Supply necessary permits and pay related fees. • Waste disposal and related fees. • Acquire structural engineering and pay related fees. Excavation: • Excavation sub -contractor will excavate pad with over dig down to maximum of 6' and bring back up to desired elevation in 1' lifts being compacted every 1'. • Once footing and floor system are built, back fill will be placed around new building using the organic material that was removed. • If excavation needs to be dug out more than 4' deep then additional fees may incur for the additional excavation. Foundation: • 8"x16" footing with (2) #4 rebar and galvanized 10"x5/8" anchor bolts with 3" bearing plates spaced maximum of 48" O.C. • Concrete will be minimum 3,000 psi • Rebar that is connecting the existing footings to the new footer will be set in epoxy. • Covered deck foundation post will be a pier pad 3'x3'x8". If additional concrete is needed for engineering purposes then the additional concrete will be an extra cost to homeowner. INITIALS 14gL- 1 Stem wall: • Stem wall will be A.W.W 2"x6" framed 016" O.C. Stem wall shear will be 1/z" A.W.W CDX nailed with hot dipped galvanized nails or stainless steel and nailed according to engineering. Stem wall will be coated with A.P.O.C. 365 foundation coating or similar. Floor: • Floor system will be framed out of 2"x12" @ 16" O.C. and floor decking will be 3/4" TNG glued and nailed at every joist. Walls: • Walls will be framed with 2"x6" @ 16" O.C. • Wall shear will be 1/2" CDX nailed at engineering required nailing. • All headers will be framed according to engineering specifications. Siding: • The first 2' of the building will be Gen -stone. The color will be Kenai and the style will be stacked stone. • The remaining siding for addition will be Monogram D5 and Arctic blend will be the color. • All trims will be colonial white. • Tyvek house wrap or equivalent will be installed on buildings exterior. All windows will be flashed in with GRACE Deck: membrane. An 8'x10' deck will be built on the north side of addition. The deck will be constructed out of O.D.W. There will be a hand railing that will be picket style O.D.W and a stair set leading to the rear yard that is 3' in width and number of stairs will be determined by elevation of yard after backfill. The roof from the addition will exceed beyond the building and cover the first 6' of the deck. INITIALS N- 2 Roof. • Roof will be framed with 2"x12" @ 24" O.C. and will be sheeted with 5/8" CDX. • Roof will be covered with Grip -Rite synthetic roof liner. • Roof will be shingled with Highlander midnight black shingles and tabbed down using A.P.O.0 rubberized tab cement. • The roof fascia will be vinyl and flashing will be white style "D". There will be a continuous gutter installed on eave of roof and drained onto ground. The gutter will be aluminum Seamless high gloss white. Windows: • There will be 3 windows total. 2 will be 3'x3' awning style windows that will be framed on eave wall of building as seen on plans and the 3rd window will be a 3'x3' picture window framed on south facing wall as shown on plans. Door: • Exterior door will be a composite 9 lite door with composite jamb that is double bore. If homeowner decides to go with a different door then the difference in cost will either be refunded or added in final billing. Insulation/vapor barrier: • All walls will have R-21 un -faced and a vapor barrier (6 mil poly) will be installed on walls in conditioned area. • Floor system will be insulated with R-30. A vapor barrier will be placed on ground (6 mil poly). • Roof system will be insulated with R-38 and have a vapor barrier on the conditioned space side. INITIALS *L 3 Drywall: • 1/z" drywall will be installed on interior of addition and area where sliding glass door is framed in. • 5/8" drywall will be hung on the lid of the room. • The drywall will be finished and textured to match (as close as possible) the existing texture. Homeowner responsibilities: • Remove fence prior to excavation. • Allow access to homes electrical panel in the event it is needed to flip a breaker and owners are not present. • Remove any obstructions in the work area that may hinder the flow of production. • Allow space for tool trailer and crew parking during working hours. Tool trailer will remain on jobsite during complete project. • Pay 50% upfront and remaining 50% is due upon completion of this contract. Exclusions: • All painting, electrical, plumbing, flooring, interior trim, interior doors, cabinetry, and anything else that is not spelled out above. Total cost labor and material- $37,763.52 1 INITIALS 4 This contract is in its entirety anything more or less should not be expected. owner/representative 1111 jl� Wil 111TIPMM Deposit amount INITIALS —/91-, Date Date Check INX Ll ,,'.h , . , . Lo z I . 14 z I A, It i. ;'p li x:'fi P,- -41. Eo*'� .1 tit it, 1.4 1-Y V, IV r- X -1Z Q) VIA*? •I.: it, F. ,,'.h , . , . Lo z I . 14 z I A, It i. ;'p li x:'fi P,- -41. Eo*'� .1 tit it, 1.4 1-Y V, IV r- X -1Z Q)