Loading...
MOUNTAIN VIEW 2ND BK 4 LT 3 - ZCP 11/4/2019PrintKodiak Island Borough Form Submit by Email Community Development Department 2— 710 Mill Bay Rd. Rm 205 III III II Kodiak AK 99615 II I I III I I I II Ph. (907) 486 - 9363 Fax (907) 486 - 9396 20648 http://www.kodiakak.us Zoning Compliance Permit Permit No. BZ2020-036 The following information is to be supplied by the Applicant: Property Owner / Applicant: Danny Fox Mailing Address: Phone Number: Other Contact email, etc.: Legal Description• PO Box 1559, Kodiak All;"- r7 57 - (D 13 - ora 3t Subdv: Mountain View Sub Street Address: 1855 Three Sisters Way Use & Size of Existing Structures: Sinqle Familv Residence Block: 4 Lot: 3 Description of Proposed Action: Replace approximately 1600sf of structure that was existing. Putting it on a concrete foundation. Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: RR1 KIBC 17.70 PROP—ID 20648 Lot Area: .96 Lot Width: 120' Bld'g Height: 35 ' Front Yard: 25' Rear Yard: 10' Side Yard: 15' Prk'g Plan Rvw? Not Applicable # of Req'd Spaces: Staff Compliance Review Notes and Specific Plat/ Subdivision Requirements: Subd Case No. .,Plat No. Bldg Permit No. Does the project involve NO an EPA defined facility? *Commercial buildings, installations (military bases), institutions (schools, hospitals) and residences with more than four (4) dwelling units. Driveway Permit? Septic Plan Approval: Fire Marshall: Proof of EPA notification provided (if required)? NO *Required for all demolitions, for renovations disturbing at least 160 square feet 260 linear feet, or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and for renovations that remove a load -supporting structural member. No permit will be issued for such projects without proof of EPA notification Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that 1 have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Not Applicable Date: Oct 15, 2019 List Other: Signature: This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED. "EXPIRATION. Any zoning compliance permit issued is subject to the same expiration, suspension, and revocation provisions as a building permit issued for the same construction permit.** CDD Staff Certification Date: Oct 15, 2019 CDD Staff: Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room #-T64 - Main floor of Borough Building After -the -Fact 2X the published amount Not Applicable ❑ $0.00 F-1 $0.00 Less than 1.75 acres: N $30.00 ❑ $60.00 1.76 to 5.00 acres: ❑ $60.00pp��������� ❑ $120.00 5.01 to 40.00 acres: ❑ $90.00 C��'J7i(V° ❑ $180.00 40.01 acres or more: 0 $120,0 F� $240.00 i 15 ,!((��(('�� �1rLrt KOVIliC'r bLF Iw oun 1