Loading...
PASAGSHAK 2ND BK 2 LT 2 - ZCP 7/17/2019Kodiak Island Borough Print Form Submit by Email Community Development Department 710lBay Rd. m 205 iak AK 9965 Kodiak Ph. (907) 486 - 9363 Fax (907) 486 - 9396 19222 http://www.kodiakak.us Zoning Compliance Permit Permit No. BZ20-007 The following information is to be supplied by the Applicant: Property Owner / Applicant: Brad Bonner Mailing Address: 301 Durham Ct., Danville, CA 94506 Phone Number: 925-786-8829 Other Contact email, etc.: Jim Peterson, 907-539-5722 Legal Description: Subdv: Pasagshak 2nd Block: 2 Lot: 2 Street Address: 42042 Furin Way Use & Size of Existing Structures: 2376 single family residence Description of Proposed Action: Garage 2440 Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: RR1 KIBC 17.70 PROP—ID 19222 Lot Area: 1.12 ac Lot Width: 120' Bld'g Height: 35 ' Front Yard: 50, Rear Yard: 20 ' Side Yard: 15 ' Prk'g Plan Rvw? Not Applicable # of Req'd Spaces: Staff Compliance Review Notes and Specific Plat / Subdivision Requirements: Subd Case No. Plat No. Bld'g Permit No. Does the project involve NO an EPA defined facility? *Commercial buildings, installations (military bases), institutions (schools, hospitals) and residences with more than four (4) dwelling units. Driveway Permit? Septic Plan Approval: Fire Marshall: Proof of EPA notification provided (if required)? NO *Required for all demolitions, for renovations disturbing at least 160 square feet 260 linear feet, or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and for renovations that remove a load -supporting structural member. No permit will be issued for such projects without proof of EPA notification Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan Date: Jul 17, 2019 List Other: Signature: This permit is only for the proposed project as described b the applicant. If there are any changes to the proposed project, including its intended use, prior to ."or d ring its siting, construction, or operation, contact this office immediately to determine if further review approval of the revised project is necessary. THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED. **EXPIRATION: Anyzoning compliance permit issued is subject to the same expiration, suspension, and revocation provisions as a building permit issued for the same construction permit.** CDD Staff Certification Date: Jul 17, 2019 CDD Staff: Payment Verification Zoning Compliance Permit Fee Pai _. a s Office Voom # 104 - Main floor of Borough Building ISM, if Not Applicable Less than 1.75 acres: 1.76 to 5.00 acres: 5.01 to 40.00 acres: 40.01 acres or more: KODIIAKR .NIWj ,,,,Obt-the-Fact 2X the published amount p(o .FcnpAQTQAr&iT❑ $0.00 L4 ❑X $30.00 ❑ $60.00 ❑ $60.00 ' ❑ $120.00 • 1 11 ❑ $120.00 $180.00 $240.00 C. 3 4CY ' % •'�{ Cb V zo 3a 40d s SV I ci=Ami 44 19 � Z 4060 ox 4.p b' c CoCb- ;$ 9-0vie , S 410 Quo-6ro2�g