Loading...
HOSPITAL BK 1 LT 2A-1 - ZCP 7/16/2019Kodiak Island Borough Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 oa Ph. (907) 486 - 9363 Fax (907) 486 - 9396 http://www.kodiakak.us I Print Form Submit by Email III IIIIIIIIIII ILII III III 23656 Zoning Compliance Permit Permit No. CZ2020-003 Property Owner / Applicant: Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: Street Address: Use & Size of Existing Structures: Providence Clinic The following information is to be supplied by the Applicant: Kodiak Island Borough/Providence 710 Mill Bay Rd., Kodiak, AK 307-486-9363 Friend Cont. - Mike Haffeman, 486-3908 Subdv: Ka4wakSN Block: 1 1915 Rezanof L Lot: 2A-1 Description of Proposed Action: Rebuild exterior wall. Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: Public Use KIBC 17.130 Lot Area: 11.92 Lot Width: Not Applicable Bld'g Height: Front Yard: Not Applicable Rear Yard: Not Applicable Side Yard: Prk'g Plan Rvw? Not Applicable # of Req'd Spaces: Staff Compliance Review Notes and Specific Plat / Subdivision Requirements: PROP ID 23656 Not Applicable Not Applicable Subd Case No. Plat No. Bldg Permit No. Does the project involve YES an EPA defined facility? *Commercial buildings, installations (military bases), institutions (schools, hospitals) and residences with more than four (4) dwelling units. Driveway Permit? Septic Plan Approval: Fire Marshall: Proof of EPA notification provided (if required)? YES *Required for all demolitions, for renovations disturbing at least 160 square feet 260 linear feet, or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and for renovations that remove a load -supporting structural member. No permit will be issued for such projects without proof of EPA notification Applicant Certification: 1 hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that 1 have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable corner markers in place for verification of building setback (yard) requirements. 04�-kr- Attachments? dale— List Other: Date: Jul 10, 2019 Signature: This permit is only for the proposed project as described by tbX_W1kaDL.1L&k" are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED. ** EXPIRATION: Any zoning compliance permit issued is subject to the same expiration, suspension, and revocation provisions as a building permit issued for the same construction permit.** CDD Staff Certification 11 Date: Jul 10, 2019 CDD Staff: Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room **04 - Main floor of Borough Building After -the -Fact 2X the published amount Not Applicable ❑ $0.00 ❑ $0.00 Less than 1.75 acres: ❑ $30.00 ❑ $60.00 1.76 to 5.00 acres: ❑ $60.00 ❑ $120.00 5.01 to 40.00 acres: ❑X $90.00 j (� ❑ $180.00 40.01 acres or more: ❑ $120.00 ❑ $240.00 R A 1 JUL 10 7019 KODlAWLANU OUNUGh C1hJAh1J%Cnct3A0TflA1!&1T Post Project Report Kodiak Providence Hospital Abatement 1915 E Rezanof Drive Kodiak, AK 99615 Client/Contractor Friend Contractors 1950 Mill Bay Road Friend Contractors Kodiak, AK 99615 Prepared by Satori Group, Inc. 1310 East 66th Avenue, Suite 2 Anchorage, AK 99518 April 2019 c SATORI GROUP ® z TABLE OF CONTENTS I. Notification ll. Daily Reports Ill. Visual Inspection IV. Worker Certificates V. Daily Air Monitoring VI. Clearance Air Monitoring 1310 East 66th Avenue, Suite 2 Anchorage, AK 99518 Phone 907.332.0456 Fax 907.332.0457 vexvegosatori.com G ti SATORI I. Notification 1310 East 66th Avenue, Suite 2 Anchorage, AK 99518 Phone 907.332.0456 Fax 907.332.O457 w:w4.gosatori.com Jil's r C��s -- Z 0 SATORI GROUP NOTIFICATION OF ASBESTOS ABATEMENT The intent of this letter is notification of the job and participating workers per AAC 61.620b To: Alaska Occupational Safety & Health Date: 3/21/2019 ACM Abatement Location 1915 E Rezanof Dr Kodiak, AK 99615 Projected Time Frame Start Date: 3/28/2019 Workers to be involved Satori Project Number: 40437 End Date: 3/31/2019 Last Name First Name Cert # Expires Caldwell Alan 20020632 01/31/2020 Taei Bahaa 20150014 10/08/2019 Guzman Payano 20160593 06/20/2019 Mercedes Yunior 20160492 01/31/2020 Caldwell Blake 20180305 05/25/2019 Rodriquez Gustavo 20050848 06/20/2019 Resto Miranda Jose 20160592 01/31/2020 Munoz Nunez Agripino 20180791 11/30/2019 Chadwell Adam 20190136 02/15/2020 Please contact me if you have any questions or require additional information. acaldwellCcD,gosatori.com Thank you, A /� 4v/ Alan Caldwell Operations Manager APPROVED DOL ASBESTOS NOTIFICATION DATE: 3/21/20 1 9 APPROVED BY:'— STATE OF ALASKA— DOL/OSH MAINTAIN AT WORKSITE 1310 East 66th Avenue, Suite 2 Anchorage, AK 99518 Phone 907.332.0456 Fax 907.332.0457 www.gosatori.com aC, X04, SATORI GROUP ® z O MFHT 0��,0 II. Daily Reports 1310 East 66th Avenue, Suite 2 Anchorage, AK 99518 , Phone 907.332.0456 , Fax 907.332.0457 1 www.gosatori.com 1310 E 66th Ave, Suite 2 Anchorage, AK 99518 info@gosatori.com co r SATORI GROUP DAILY FIELD REPORT Competent Person: Bahaa Taei Project Name: Kodiak Providence Hospital Abatement Project Location: Kodiak, AK Date: 03/28/19 Project #: 40437 Daily Report #: 1 Asbestos L�, Lead LJ Other LJ WORK AREA PREPARATION PROCEDURES 1. Applicable EPA/DOL notifications current & posted 2. OSHA Job Board complete and displayed 3. SSHP and job field binder on site 4. Applicable SDSs on site and available 5. Secure the area 6. Notify other building occupants 7. Post demarcation signage 8. Shut down the HVAC 9. Secure the electrical system 10. Clean and remove furniture and fixtures 11. Tape and seal windows, vents, and all critical openings 12. Seal stationary items 13. Cover the floor and walls with polyethylene 14. Establish decontamination unit(s) 15. Establish waste load out unit 16. Establish negative pressure in area (Class 1) TIMELINE OF WORK ACTIVITIES PERFORMED TODAY: 1:30 PM Crew arrived onsite and held the daily safety meeting. Phone: 907-332-0456 Fax: 907-332-0457 www.gosatori.com Completed In Process N/A o ❑ ❑ o ❑ ❑ G ❑ ❑ 1-±1 ❑ ❑ 0 ❑ ❑ L-A ❑ ❑ 0 ❑ ❑ El ❑ ❑ 0 ❑ ❑ 1-±1 ❑ ❑ El ❑ ❑ F±1 ❑ ❑ El ❑ ❑ El ❑ ❑ El ❑ ❑ ❑ ❑ a 1:45 PM Crew finished the meeting. Crew started loading in their tools, supplies, equipment, and setting up the containment barriers and the decon unit. 2:30 PM Crew finished setting up the job site. Crew and CP inspected their PPE for proper fit and function before properly donning them. CP then inspected the containment barriers and the decon unit before the crew entered the containment and started removing GWB/JC. Engineering controls used during today's work were: HEPA vacuums, wet methods, and prompt cleanup. 3:30 PM Crew finished removing the GWB/JC and started cleaning the entire job site. 5:00 PM Crew finished cleaning the job site. Crew loaded out their tools, equipment, and bagged debris. Crew finished the job and left the job site. Page 1 of 3 1310 E 66th Ave, Suite 2 Anchorage, AK 99518 info@gosatori.com SATORIGRO IP o DAILY FIELD REPORT Competent Person: Bahaa Taei Project Name: Kodiak Providence Hospital Abatement Project Location: Kodiak, AK Date: 03/28/19 Project #: 40437 Daily Report #: 1 DAILY SITE INSPECTION 1. Barriers and enclosure inspected during shift per regulations 2. Negative Air System being monitored and working properly 3. Demarcation signs posted 4. Applicable EPA/DOL notices displayed properly 5. Daily air monitoring report from previous day posted 6. Work practices reviewed and discussed with crew 7. Safety meeting held 8. Decon unit being monitored and working properly 9. Have all workers sign regulated area sign in/out sheet 10. Protective equipment donned and inspected 11. Electrical system used — GFCI's 12. Work area clean of trash and debris 13. Beginning/end of shift — water on/off 14. Storage area — secured 15. Load out area — secured 16. First Aid supplies — available and stocked 1. TYPE OF ACM AND/OR LEAD REMOVED PER ORIGINAL CONTRACT GWB/JC Phone: 907-332-0456 Fax: 907-332-0457 www.gosatori.com Completed In Process N/A 0 ❑ ❑ ❑ ❑ 0 21 ❑ ❑ D ❑ ❑ ❑ ❑ 0 ❑ ❑ D ❑ ❑ E ❑ ❑ E ❑ ❑ P1 ❑ ❑ F11 ❑ ❑ 0 ❑ ❑ 0 ❑ ❑ El ❑ ❑ ❑ ❑ ❑ ❑ 2. QUANTITY OF ACM AND/OR LEAD REMOVED PER ORIGINAL CONTRACT SQ FT, E F 50SF 3. LOCATION IN BUILDING OF REMOVAL (ROOM #, FLOOR #, HALLWAY, BATHROOM IA 505 Treatment Room 1 4. LIST ENGINEERING CONTROLS IN PLACE FOR PROJECT: HEPA vacuums, wet methods, and prompt cleanup 5. NEGATIVE AIR PRESSURE READINGS FOR DAY - LIST LOW TO HIGH, INCLUDE READOUT: 6. LIST TIMES WHEN CONTAINMENT INSPECTIONS PERFORMED: 7. LIST TIMES WORKER PPE INSPECTIONS PERFORMED UPON ENTERING REGULA Page 2 of 3 1310 E 66th Ave, Suite 2 Anchorage, AK 99518 info@gosatori.com co ` tir L SATORI GROUP Competent Person: Bahaa Taei Project Name: Kodiak Providence Hospital Abatement Project Location: Kodiak, AK Date: 03/28/19 Project #: 40437 Daily Report #: 1 8. LIST TIMES WHEN DECONTAMINATION AREA INSPECTIONS PERFORMED: Phone: 907-332-0456 Fax: 907-332-0457 www.gosatori.com 9. CP CONFIRMED REGULATED AREA SIGN IN SHEET FILLED OUT CORRECTLY AND ACCURATELY: ;rew signed the regulated area sign in sheet properly 10. CP CONFIRMED AIR MONITORING CONDUCTED IN ACCORDANCE WITH WORK PLAN: Fatori conducted the air monitoring in accordance with our SoW 11. LIST TOTAL QUANTITY OF DEBRIS GENERATED (# OF BAGS / 12. ANY CHANGE OF CONDITION FROM SCOPE OF WORK IN ORIGINAL CONTRACT: 13. CHANGES, DIRECTIVES, AND/OR INSTRUCTIONS RECEIVED OR GIVEN: 14. LIST SITE VISITORS / MEETINGS ATTENDED: 15. CONTRACTOR'S VERIFICATION The above report is complete and correct, and all material and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above. Project Supervisor Date Page 3 of 3 03/28/19 --A SATORI GROUP Daily Satety fV eetinp, Competent Person: Bahaa Taei Project Name: Kodiak Providence Hospital Abp Project Location: Kodiak, AK Proper PPE for the Job Site Respirator Inspections Ladder Safety Electrical Hazards Falling Hazards Burn Hazards Scaffold Safety Slip: Weather Sharp Ot Chemical Hazar Overhe Biologic SSHP a► Additional site safety haz Date: 03/ 2S /2019 Project Number: 40437 pan : i na ,�, sed in safety meeting /Trips/Falls Heat Stress Potential Conditions Cold Stress Potential jects/Tools. --" Hand Arm Vibration Js & SDS's Flying Particles Id Hazards Moving Equipment al Hazards Safe Use of Power Tools F-1 id Location ards and concerns /11 0 O o 3 o 0 z� o 3 o o m :3 m a 0 Q: CD CD V CD m .-t CD_ m m c m v n D m D T) 0 z Z O C Cl) 2 m m q wD) moo ca . G) o D a -O CD C OC 03CD cn N C- 0 v a a) rt :tt m _P:1 O W -P W v N 0 TI O X CD N) CD o N 0 V �1 C) C.0 w n� O A 3 En rn Z � m 1 Vl Z o s o5 o 5 05 o5 C of o5 o5 C oso�_ C o� o� oso� os C C a o m C00 7 0 .. o a .. o .. o 5 o 5 o 7 0 0 7 0 7 3 0 E 0 O g 7 O c 1 rn � c CD CD CL 0 O o 3 o 0 z� o 3 o o m :3 m a 0 Q: CD CD V CD m .-t CD_ m m c m v n D m D T) 0 z Z O C Cl) 2 m m q wD) moo ca . G) o D a -O CD C OC 03CD cn N C- 0 v a a) rt :tt m _P:1 O W -P W v N 0 TI O X CD N) CD o N 0 V �1 C) C.0 w n� O A 3 En rn III. Visual Inspection 1310 East 66th Avenue, Suite 2 Anchorage, AK 99518 , Phone 907.332.0456 Fax 907.332.0457 1 wwi-gosatori.com Satori Group, Inc. 1310 E. 66th Avenue, Suite 2 Anchorage, AK 99518 LOCATION: r�,C. CON 6 J n SATORI GROUP 0 �J� 4 �M o� fNT oE�j• Visual Inspection Business / Residence: Providence Hospital Address: 1915 E Rezanof Drive City: Kodiak Room(s) or Units Involved: State: AK Zip: 99615 Visual -� Inspection Date: 03/ � �% /2019 Project Name: Kodiak Providence Hospital Abatement Satori Project No.: 40437 Client: Friend Contractors Phone: 907-332-0456 Fax: 907-332-0457 www.gosatori.com In accordance with the procedures specified in Satori Group's Work Plan and this contract, Satori Group hereby certifies that the asbestos containing material has been thoroughly abated and a confirmation visual inspection performed. Asbestos Containing Materials (ACM) were abated in accordance with applicable 40 CFR (EPA) and 29 CFR (OSHA) regulations by certified Alaska asbestos abatement workers prior to commencing demolition. By:""- Bahaa Taei Competent Person, Satori Group, Inc. 11.4 8idVbfure by Client Representative Signature by Client Representative Print Name Print Name Date Title Title IV. Worker Certificates 1310 East 66th Avenue, Suite 2 Anchorage, AK 99518 1 Phone 907.332.0456 ; Fax 907.332.0457 1 www.gosatori.com ALASKA DEPARTMENT OF LABOR Certificate of Fitness ASBESTOS ABATEMENT Issued 1210512018 A-, WGT DOB 200 0310711989 403620 4451 20150014 Expires � `x,10/0812019 ,RTt9-i4�/ENUE K _ 8950,8 HGT ; •,. 611 J�� Dr Tamika Ledbetter RENEWAL Commissioner t knBrl stt: Of Eit ASBESTOS ABATEMENT 28190136 6 A DWELL STREET 1 IA�14S' RE ET Fps , M A443D ZX OZV3K"4 519 Dd34f ' t v i litit aiv of ! itnrr+ ASBESTOS ABATEMENT 20', PAYANO J GUZfAM ' 218 N PARK AVENUE, # 4 ANCHORAGE, AK 99508 MGT DOB ? .: 09r25l1973 Cl }ir'd, brygas ALASKA DEPARTMENT OF LABOR Certificate of Fitness ASBESTOS ABATEMENT 20160492 Issued Expires e�2 adz s 0173V2020 (pEi�ERCEDES 1�+1#�UNF, AiltDRIVE, APT 2 v�. R�1iC11tia ; AK 99501 WGT DOB HGT� 160 03/1211976 65 Dr Tamika L. Ledbetter At—%SKA DEPARTMENT OF LIBOR C aphr of filfti n, ASBESTOS ABATEMENT Z naff '91 jLIssued — Expires 12JOS1201E 11/3012019. AGRIPINO -MEZ 3700 ALEXANDER AVENUE ANCHORAGE, AK 99508 WGT DOB HGT 165 09121/1980 66 __-Dr. Tamika Ledbetter V. CSN JG !J, iy P GROUP O FQ Q Daily Air Monitoring 1310 East 66th Avenue, Suite 2 Anchorage, AK 99518 Phone 907.332.0456 Fax 907.332.0957 i mvw.gosatori.com 4 if Satori Group, Inc. (Satori Group ) 1310 East 66th Ave., #2 Anchorage, AK 99518 Telephone: (907) 332-0456 Fax: (907) 332-0457 Daily Inspection Report Report Date 3/28/2019 Satori Group Job No 40437 Project Name Kodiak Providence Hospital Abatement Project Manager Alan Caldwell Client Friend Contractors LLC Satori Group Inspector Bahaa Taei Client Contact Jerrol Friend Morning Afternoon Start 2:30 PM On -Site Manager Bahaa Taei Inspector hours Stop 4:30 PM 2:00 Client Project # Contractor Information Contractor Satori Group, Inc. Foreman Bahaa Taei 1310 E 66th Ave. #2 Contractor Phone 907-332-0456 Anchorage, Alaska 99518 Contractor Fax 907-332-0457 Scope of Work Shift ❑ Mobilization ® Bulk Removal ❑ Final Visual ❑ Other (See below) F=❑ Pre -Cleaning ® Detailing ❑ Clear. Inspection ❑ Setup ® Bag -out ❑ Tear Down / De -mob Work Area 505 Treatment Room 1 Notable Occurrences Description Crew arrived onsite and set up the air monitoring equipment. A total of six air samples were taken from around the job site. One air sample was taken from a worker's breathing zone, one excursion air sample, one air sample was taken from inside the containment, one air sample was taken from the exit of the decon unit, and two field blanks. All air monitoring equipment was tested and calibrated before and after use today. Sample Summary # Sample Collected: PCM 6 TEM PLM LEAD AIR LEAD WIPE TCLP OTHER ® Passed - proceed ❑ Need repairs - proceed ❑ FAILED ❑ Other... ❑ Adequate - proceed ❑ Inadequate - need reinspection ❑ Retest Recorded By Contractor Signature l� Bahaa Taei / Cert# 20150014 Bahaa Taei 3/28/2019 As a company representative, I aknowledge and authorize the above work and subcontractor hours Satori Group, Inc. (Satori Group ) 1310 East 66th Ave., #2 Anchorage, AK 99518 Telephone: (907) 332-0456 Fax: (907) 332-0457 Project Name Kodiak Providence Hospital Abatement Client Name Friend Contractors LLC Sampled By Bahaa Taei Analyzed By Alex Homer Review Comments AIR MONITORING DATA SHEET FOR ASBESTOS 7400 Method Page 1 Client Project Number Project # 40437 Sampled Date 4/1/2019 Date Analyzed 4/1/2019 Sample ID 0328-001 Location Breathing Sample inside breathing zone TWA =0.047 f/cc Sample Type B Work Removal of GWB/JC temp. am/pm/avg. 70 / 70 / 70 Protection H Performed temp. am/pm/avg. 70 / 70 / 70 Protection H - ---- - " Worker Name Chadwell, Adam Cert # 20190136 SS# Decon DBS Time Start 2:30 PM Flow Start 2 LOD 0.015 UCL 0.232 Environment H Liters /Fields f/cc Stop 4:00 PM Stop 2 Fibers Pump # SGI 9 Minutes 120 included 1 Liters /Fields f/cc Total No. of samples Rotometer # LV 1 Minutes 90 included 1 180.0 40/100 0.109 Sample ID 0328-002 Location Inside Controlled Area 0 Sample Type I Work Removal of GWB/JC Performed temp. am/pm/avg. 70 / 70 / 70 Protection H Pump # SGI 3 Decon DBS - ---- - " Time Start 2:30 PM Flow Start 2 LOD 0.011 UCL 0.192 Environment H Stop 4:30 PM Stop 2 Fibers Pump # SGI 14 Liters /Fields f/cc Total No. of samples Rotometer # LV 1 Minutes 120 included 1 240.0 44/100 0.090 Sample ID 0328-003 Sample Type 0 Protection H Decon DBS Environment H Pump # SGI 3 Rotometer # LV 1 Sample ID 0328-004 Sample Type STEL Protection H Decon DBS Environment H Pump # SGI 9 Rotometer # LV 1 Location Outside Decon Work Removal of GWB/JC Performed temp. am/pm/avg. 70 / 70 / 70 Time Start 2:30 PM Flow Start 2 LOD 0.011 UCL 0.011 Stop 4:30 PM Stop 2 Fibers Liters /Fields f/cc Total 120 No. of samples Minutes included 1 240.0 1/100 < 0.011 Location Excursion sample inside workers breathing zone Work Removal of GWB/JC Performed Worker Name Chadwell, Adam Cert # 20190136 Time Start 4:00 PM Flow Start 2 Stop 4:30 PM Stop 2 Total No. of samples Minutes 30 included 1 TWA =0.047 f/cc temp. am/pm/avg. 70 / 70 / 70 SS# LOD 0.045 UCL 0.905 Fibers Liters /Fields f/cc 60.0 52/100 0.425 SAMPLES TYPES RESPIRATORY PROTECTION DECONTAMINATION ENVIRONMENTAL STEL - Excision CL - Clearance PD - Pressure Demand, S - Supply Air DS - Decon w/Shower H - HEPA Vacuum B - Breathing Zone XCL - Aggressive Clearanc CF - Continuos Flow, D - Decon w/o Shower N - Negative Pressure Enclosure H - HEPA Exhaust PRE - Pre -Abatement BH - Blasting Hood, PAPR - Powered Air Pur DBS - Double Suit O - No Containment I - Inside Work Area O - Outside Work Area F - Full Face Negative Pressure C - Controlled Area N - Neg. Air Exhaust BL - Field Blank H - Half Face Negative Pressure Page 2 Project # 40437 Sampled Date 4/1/2019 Client Project Number Sample ID 0328-005 Location Field Blank BL Protection ample Type BL Work Field Blank nvironment H Pump# Performed temp. am/pm/avg. 70 / 70 / 70 Protection H Decon DBS Time Start Flow Start LOD 0.001 UCL 0.001 nvironment H Stop Stop Fibers Pump # Liters /Fields f/cc Total No. of samples .otometer # Minutes included 1 0/100 0?000 Sample ID 0328-006 ample Type BL Protection H Decon DBS nvironment H Pump# .otometer # Location Field Blank Work Field Blank Performed temp. am/pm/avg. Time Start Flow Start LOD 0.001 UCL 0.001 Stop Stop Fibers Liters /Fields f/cc Total No. of samples 1 1!100 0?000 Minutes included Personal Air Samples Date 3/28/2019 Project Name Kodiak Providence Hospital Abatement Project Number 40437 Work Area Name A 505 Treatment Room 1 Worker/ Grouping ID Sample No. Chadwell, Adam Cert# 20190136 0328-001 0328-004 Satori Group, Inc. (Satori Group ) 1310 East 66th Ave., #2 Anchorage, AK 99518 Telephone: (907) 332-0456 Fax: (907) 332-0457 Type Time(min) Result Units 8 hour TWA: 0.047 B 90 0.109 f/cc STEL 30 0.425 f/cc Sample Types: STEL - Excursion, B - Breathing zone Page 1 \�G iit� ,G�ti-P0�S i c SATORI GROUP 70 VI. Clearance Air Monitoring 1310 East 66th Avenue, Suite 2 Anchorage. AK 99518 . Phone 907.332.0456 , Fax 907.332.0457 1 www.gosatori.com AK Environmental Consultants, Inc. 5700 Old Seward Highway, Suite 202 MECAnchorage, AK 99518 (907) 561-AKEC Client: Satori Group 1310 East 66th Avenue #2 Anchorage, AK 99518 Client Project No: 40501 Project: Providence Hospital PCM Air Sample Report Report Date: 3/29/2019 Report No: 1453 Turnaround Time: RUSH Collection Date: 3/28/2019 Collected By: CLIENT Sample Count 4 Date Received 3/29/2019 Client #: Lab# Location Volume Density Fibers/CC Liters (F/MM ) CL -07 A19-1970 CL - Inside Work Area 1200L < 7 < LOD Client M CL -08 Lab# A19-1971 Location CL- Inside Work Area Volume Liters 1200L Density (F/MM ) < 7 Fibers/CC < LOD Client M Lab# Location Volume Density Fibers/CC Liters (F/MM ) FB -09 A19-1972 Field Blank N/A < 7 NA Client M Lab# Location Volume Density Fibers/CC Liters (F/MM ) FB -10 A19-1973 Field Blank N/A < 7 NA Page 1 of 2 Analyst: Approved By: PCM Air Sample: Time Weighted Average Date Analyzed: 31 �/201= Date . 3 la b bi g Analysis by NIOSH 7400 Method. Reporting Limit based upon 7 f/mm'. All results are based on the samples as received at the laboratory. AK Environmental Consultants, Inc. (AKEC) assumes that appropriate sampling methods were used and the data upon which these results are based has been accurately supplied by the client. Method requires the submittal of 2 to 10 field blanks per set. These results are corrected for contamination by field or analytical blanks. Current annual Coefficient of Variation values will be updated as data becomes available. The Limit of Detection (LOD) depends on sample volume and quantity of interfering dust and is <0.01 f/cc for atmospheres free of interferences. The method gives an index of airborne fibers. It is primarily used for estimating asbestos concentrations, though PCM does not differentiate between asbestos and other fibers. Use this method in conjunction with electron microscopy for assistance in identification of fibers. Fibers <0.25 µm diameter will not be detected by this method. The Walton Beckett graticule area is 0.00785 f/mm' as verified by stage micrometer. Samples with concentrations below the limit of detection are reported as <LOD. AVOID concentration means that the sample has been overloaded with particulate matter and could not be reliably analyzed. Time Weighted Averages (TWA's) calculated based upon adjusted standard method (ASM) for 8 hours. No certification or accreditation exists for calculating Time Weighted Averages. AKEC accepts no legal responsibility for the purpose for which the client uses test results. This confidential report relates only to those item(s) tested and does not represent an endorsement by AIHA or any agency of local or state governments nor any agency of the U.S. government. This report shall not be reproduced except in full, without written approval of AKEC. Page 2 of 2 AK Environmental Consultants, Inc. 5700 Old Seward Highway, Suite 202 Anchorage, AK AEC (907) 561-253299518 61 2 3299518 Sample Chain of Custody Client: 6A'•Ta p�n�s,�D Date: 3�Z`' j t4 Time: Client Project: Client Project 4p.5-0) Samples Relinquished By: Date: 7/24/t f 90'1— 3So-I l4k Samples Received by: Date: Samples Received by: Sample Analysis Type: (write in column) P M PLM TEM LEAD TCLP Other (Specify) Turnaround Time: (write in column) ush 1 Day 2 Day 3 Day 5 Day Sample Number: Collection Date: Sample Condition: Analysis Type: Turnaround Time: CL - 0-1 5/76 G. -cw 312bIc� rorh,d pcw rr-�sK F= �0 It is the responsibility of the Customer to ensure that samples are correctly taken, labeled, and packaged. AKEC reserves the right to refuse samples for analysis which are obviously unsuitable due to damage, incorrect or insufficient labeling, or incorrect sample loading. AKEC will notify the Customer as soon as such a problem is identified and will discuss with the Customer the course of action to be taken. 7 A""• U sc" C)L-" N 1