Loading...
MONASHKA BAY BK 5 LT 1 - ZCP 7/12/2019Kodiak Island Borough I Print Form I Submit by Email , =a�.. IL Community Development Department 710 Mill Bay Rd. Rm 205 at{ Kodiak AK 99615 Ph. (907) 486 - 9363 Fax (907) 486 - 9396 22100 http://www.kodiakak.us Zoning Compliance Permit Permit No. BZ2020-005 The following information is to be supplied by the Applicant: Property Owner / Applicant: Clint Moudy Mailing Address: PO Box 9017, Kodiak Phone Number: 208-630-4717 Other Contact email, etc.: Legal Description: Subdv: Monashka Block: 5 Lot: 1 Street Address: 3242 Monashka Bay Use & Size of Existing Structures: Single family residence, shop, storage building Description of Proposed Action: Build a boiler shed, 8x8, next to house and expand deck 20'. Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: RR1 KIBC 17.70 PROP—ID 22100 Lot Area: 1.83 ac Lot Width: 120' Bld'g Height: 35 ' Front Yard: 25 ' Rear Yard: 20 ' Side Yard: 15 ' Prk'g Plan Rvw? Not Applicable # of Req'd Spaces: 3 Staff Compliance Review Notes and Specific Plat/ Subdivision Requirements: Subd Case No. Plat No. 67-22 Bld'g Permit No. Does the project involve NO an EPA defined facility? *Commercial buildings, installations (military bases), institutions (schools, hospitals) and residences with more than four (4) dwelling units. Driveway Permit? Septic Plan Approval: Fire Marshall: Proof of EPA notification provided (if required)? NO *Required for all demolitions, for renovations disturbing at least 160 square feet 260 linear feet or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and for renovations that remove a load -supporting structural member. No permit will be issued for such projects without proof of EPA notification Applicant Certification: 1 hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan Date: Jul 12, 2019 List Other: Signature: X This permit is only for the proposed project as described by the applicant`�re are any changes to the proposed project, including its intended use, prior to or during its siting, struction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED. ** EXPIRATION: Anyzoning compliance permit issued is subject to the same expiration, suspension, and revocation provisions as a building permit issued for the same construction permit.** CDD Staff Certification Date: Jul 12, 2019 CDD Staff: Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Rdom,4 104 - Main floor of Borough Building After -the -Fact 2X the published amount Not Applicable ❑ $0.00 ❑ $0.00 Less than 1.75 acres: ❑ $30.00 ❑ $60.00 f 1.76 to 5.00 acres: $60.00 , r l jkI [ � � ❑ $120.00 V v _ 5.01 to 40.00 acres: $90.00 ramrs, J& $18. 0 Va 40.01 acres or more: $120.00VVU[i AM 240 1L Vt9 K00IAK1,WkWUdUKUUGh GAIAW%r! 1CDAOTAAl:A1T I 'Of ty3