MILLER PT 1ST BK 4 LT 2B - ZCP 7/1/2019Kodiak Island Borough
Community Development Department
710 Mill Bay Rd. Rm 205
c Kodiak AK 99615
T' Ph. (907) 486 - 9363 Fax (907) 486 - 9396
http://www.kodiakak.us
Zoning Compliance Permit
Property Owner / Applicant:
Mailing Address:
Phone Number:
Other Contact email, etc.:
Legal Description:
Street Address:
Use & Size of Existing Structures:
Single family residence
Print Form Submit by Email
Permit No. BZ2020-002
The following information is to be supplied by the Applicant:
Federal Home Loan Corp
5000 Plano Parkway, Carrollton, TX 75010
1A 4� Q t `775 - °710 l H 55 I - p� o u.3 nom'
Subdv: Miller Pt. 1st Block: 4 Lot: 2B
3419 Melnitsa
Description of Proposed Action:
Demo interior due to fire. No outside wall modification. Remove wall board, windows, doors, etc for replacement.
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points,
and vehicular parking areas.
Staff Compliance Review: Current Zoning: R2 KIBC 17.80 PROP—ID
Lot Area: .24 Lot Width: 60' Bldg Height: 35 '
Front Yard: 25 ' Rear Yard: 10, Side Yard: 5 '
Prk'g Plan Rvw? Not Applicable # of Req'd Spaces: 3
Staff Compliance Review Notes and Specific Plat / Subdivision Requirements:
s'.
Subd Case No. Plat No. Bld'g Permit No.
Does the project involve NO
an EPA defined facility?
*Commercial buildings, installations (military bases),
institutions (schools, hospitals) and residences with
more than four (4) dwelling units.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Proof of EPA notification provided (if required)? NO
*Required for all demolitions, for renovations disturbing at least 160 square
feet 2601inear feet, or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and
for renovations that remove a load -supporting structural member.
No permit will be issued for such projects without proof of EPA notification
Applicant Certification: 1 hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that 1
have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Not Applicable List Other:
Date: Jul 1, 2019
Signature: V
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED.
"EXPIRATION.- Any zoning compliance permit issued is subject to the same expiration, suspension, and revocation provisions as a
building permit issued for the same construction permit.**
CDD Staff Certification
Date: Jul 1, 2019 CDD Staff:
Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Rooms 04 - Main floor of Borough Building
After -the -Fact 2X the published amount
Not Applicable
❑
$0.00 ❑
$0.00
Less than 1.75 acres:
R
$30.00 ❑
$60.00
1.76 to 5.00 acres:
❑
$60.00 , %❑
$120.00
5.01 to 40.00 acres:
❑
$90.00 ❑
$180.00
40.01 acres or more:
❑
❑
$120.00PAIU
$240.00
C1h1ARiMnrDAnfir&rr