Loading...
WOODLAND EST BK 4 LT 1E - ZCP 3/8/2019Print Form Submit by Email Kodiak Island Borough - Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 III I I IIIIIIIIIIIIIII IIIII Ph. (907) 486 - 9363 Fax (907) 486 - 9396 16552 http://www.kodiakak.us Zoning Compliance Permit Permit No. BZ2019-019A The following information is to be supplied by the Applicant: Property Owner / Applicant: Friend Contractors LLC /Agent: Michael Haffeman Mailing Address: P.O. Box 175, Kodiak, AK 99615 Phone Number: (907) 539-1975 Other Contact email, etc.: jfriend@alaska.net Legal Description: Subdv: Woodland Estates Block: 4 Lot: 1E Street Address: 369 Plover Way Use & Size of Existing Structures: Vacant Description of Proposed Action: Construct a two-family residential structure totaling approximately 2,200 sf. Depicted in attached site plan, floor plan, and elevation drawings. Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: R2 KIBC 17.80 PROP—ID 16552 Lot Area: 18,651 sf Lot Width: 60' Bld'g Height: 35 ' Front Yard: 25 ' Rear Yard: 10' Side Yard: 51 Prk'g Plan Rvw? Yes # of Req'd Spaces: 6 Staff Compliance Review Notes and Specific Plat/ Subdivision Requirements: Three parking spaces are required for each dwelling unit per KIBC 17.175.040. Per the original zoning compliance permit for this parcel (BZ2019-019A), the front yard has been permitted as that yard which separates the structure from the southernmost lot line. That yard which separates the structure from the property line abutting Tract A, Block 4, Woodland Estates has been permitted as the rear lot line. The yards separating the structure from the westernmost and easternmost lot lines are permitted as side yards. See attached site plan. Subd Case No. S05-005 Plat No. 2006-9 Bldg Permit No. BB -2019-42 Does the project involve NO an EPA defined facility? *Commercial buildings, installations (military bases), institutions (schools, hospitals) and residences with more than four (4) dwelling units. Driveway Permit? Septic Plan Approval: Fire Marshall: Required N/A See Building Department Proof of EPA notification provided (if required)? N / A *Required for all demolitions, for renovations disturbing at least 160 square feet 260linearfeet or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and for renovations that remove a load -supporting structural member. No permit will be issued for such protects without proof of EPA notification Applicant Certification: 1 hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that 1 have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan List Other: Floor plan and exterior elevation drawings Date: - 3/8 /Icl Signature: This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED. **EXPIRATION. Any zoning compliance permit issued is subject to the same expiration, suspension, and revocation provisions as a building permit issued for the same construction permit.** CDD Staff Certification Date: Mar 7, 2019 CDD Staff. Sara Fraser Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building After -the -Fact 2X the published amount (21 Not Applicable FX] $0.00. ❑ $0.00 Less than 1.75 acres: ❑ $30.00 ❑ $60.00 1.76 to 5.00 acres: ❑ $60.00 ❑ $120.00 5.01 to 40.00 acres: ❑ $90.00 ❑ $180.00 40.01 acres or more: ❑ $120.00 ❑ $240.00 8060-98b (L06) S 1966 D� SDIb 'Io!po�{ pooh ADO II!VV 096L 0-1-I 'JOIDDJ}uo0 pual�A Lv ca 70 Q--� t a � o o m co m _ ��- - \cry \N -e, L!7 Lij Ll 5.. > % o m iQ �r d O z 07 Q O n N W �1] I— C U N uolc! 101 ST966 2�S21V '�21POA A2M aanold Ag£ °'(M 3f�ow; =10- -. 9062-99ti (L06) C91966 015101V '�101POAL II!W 096 Lo0 pualaA suoi}Dna13 ST966 ei sely `�elpo>l xaldna AeM JDAOld 69C 0 } c o>i iu %n 0 w c 0 n d LU s 0 5A 0 z E - w w N N N Q cs- T— I !n C8060-99ib D gL966 D� S01d '�008 � C)a IIIW'ao�00��uo0 S UOIIDA 913 ST966 2IS21V `)Jeipo>{ xaldna /,2M aanold 69C c 0 d d w s 4- 0 0 V) c 0 0 0 m LU +- d w c� Y, w w Qx m _s �O 04 CD 0- v CS' S' 9062-99-V U06) 51966 o�{Soid 'Jo!poN pool 400 II!W 0 9 6l 0�� '�o}oo��uoZ) pully uold -1001A ST966 2�S21V '� 21PO>j A2M a9AOId £9£ O O N do J N 062-9 U06) �DI CG:L966 o�Sold `PO>I OGh W�o}oo}u uold Goold ST966 2� Seld '�21POA xaldna AeM aanold 69C I' I 1 I H I f IIIIIIII� i Y Ir ........ rA r i cn H I Ir ........ lid rA r i cn e062-9e-� (LOO UDId SJOOIJ "0 '! ' CgL966 D�SDJV 'MDIIPO>i ol P Do 008 4010 IIIN 0961 ST966 elIS21V ')121PO>l 1,3 31-1 -.1010DJIUOD PU91JJ xaldnC] A2M J@AOld 69C z W W