Loading...
CLIFF POINT EST OCEANFRONT ADN #2 LT 29 - ZCP 2/4/2019Kodiak Island Borough Print Form Submit by Email a Community Development Department 710Kodiak AK 99615 205 Mill Bay Rd. 5III I I II I II I II II I II I I II III Ph. (907) 486 - 9363 Fax (907) 486 - 9396 24496 http://www.kodiakak.us Zoning Compliance Permit Permit No. BZ2019-044 The following information is to be supplied by the Applicant: Property Owner / Applicant: Joseph Chaulklin Revocable Trust/Brechan Enterprises Mailing Address: 15135 Mrtin Creek Road Jackson, WY 83001 Phone Number: 408-644-1930 Other Contact email, etc.: joe@cliffpointestates.com Legal Description: Subdv: CLIFF POINT EST OCEANFRONT ADN #2 LT 29 Block: Lot: 29 Street Address: 6160 Cliff Point Rd Use & Size of Existing Structures: Undeveloped land Description of Proposed Action: Building Pad 4- �t ElZ Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: Conservation KIBC 17.50 PROP—ID 24496 Lot Area: 578,912 SF (13 acres) Lot Width: 250' Bld'g Height: 35' Front Yard: 25 ' Rear Yard: 25 ' Side Yard: 25 ' Prk'g Plan Rvw? Not Applicable # of Req'd Spaces: Staff Compliance Review Notes: Plat / Subdivision Requirements? "17.50.080.8.1 1. There is a required setback (preventing clearing, filling, excavation, or structural development) of 50 feet from the bank vegetation of anadromous fish water bodies that are specified pursuant to AS 16.05.870(a) and 5 AAC 95.010, except in the case of timber harvesting activities, whose required setback will be regulated by AS 41.17.010 through 41.17.950, " Subd Case No. PlaftN& 3018-3 Bldg Permit No. TBD Bldg Dept Does the project involve NO an EPA defined facility? *Commercial buildings, installations (military bases), institutions (schools, hospitals) and residences with more than four (4) dwelling units. Driveway Permit? Septic Plan Approval: Fire Marshall: TBD Bldg Dept TBD Bldg Dept Proof of EPA notification provided (if required)? NO *Required for all demolitions, for renovations disturbing at least 160 square feet 2601inear feet or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and for renovations that remove a load -supporting structural member. No permit will be issued for such projects without proof of EPA notification Applicant Certification: I hereby certify that will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan Date: Feb 4, 2019 List Other: Signature: )41.0 zlw� This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED. "EXPIRATION.- Any zoning compliance permit issued is subject to the same expiration, suspension, and revocation provisions as a building permit issued for the same construction permit.** CDD Staff Certification Date: Feb 4, 2019 CDD Staff: D i en -Fos Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building After -the -Fact 2X the published amount Not Applicable ❑ $0.00 $0.00 Less than 1.75 acres: E] $30.00 $60.00 1.76 to 5.00 acres: ❑ $60.00 ❑ $120.00 5.01 to 40.00 acres: ❑X $90.00 $180.00 40.01 acres or more: ❑ $120.00 $240.00 FEB 04 1011 K001AK 14&Ami a u rc U U U F, PA16A1f _rJr6 61'AAl nrr Lot 29 cliffpoint authority email Jascha <jaschaz@gdnet> Mon 2/4/2019 4:35 PM To Daniel Mckenna-Foster <dmckenna-foster@kodiakak.us>; Sent from my Phone Begin forwarded message: From: Joe Chaulklin <joe@jbluxuryproperties.com> Date: February 4, 2019 at 4:33:16 PM AKST To: jaschaz _gci.net Subject: Email To whom it may concern, I have hired Brechan Construction to assist me with my excavation and zoning compliance. Joe Chaulklin 408-644-1930 httnc•//maiI1—Hi.VnIeiic/n%nin/ttvic%nrmnrlol=RcorKA=ccmnclt=mxitcmlrl_AAI\AIrAr1KAAVTLihAr1F11IA/AAARIIA/IIfKIr)P7KI.(1FhA77iITKA1hA7717iILeV�\/mNInPVZA 1/1 07-z0�9 -01�� =ciy.cv /L39 �YY LOT 16 NII,, II \\ I+• _ L43 5.07 Acres L40 L42LOT 15 LOT 17 -,1 --eL41 10.86 Acres A2806we 01sT. LOT 19R150.00' 5.40 Acres �I4II I I t. D4808'59• WC DIST. -133.24 .11 y s Al 78.15' I I LOT 18 I I 5.20 Acres I I \\ / R150.00' 11z z II / \D 8`02'58' a 5.11 Acres II IIS II CLIFF POINT ROAD \> (120' WIDE PRIVATE ROAD " 3559 `ry WC DIST. R15o.00' \ \ S 07W27• E I I£ R71070.W' \ AND UTILITY EASEMENT -54.12' I \ 39.81' I I I D718'11'57• D67'30 58 CREATED THIS PLAT) I I I WC -76.16 ' DIE. WC DIST. A411.85' A737.40' -55.47�� R230.00, WC DIST. / Rtoo.Do, / \0 10 WSW I I -64.61' / / 9{0 \ D78'43'19' / 200' dAe; E 0,5- %1, m! °! \ / / 30' 0' 10.2 / / \ ��P.� OBtig i -i DIST. / / 10' 1 \ yj � /WC DIST. a vs / / �' / -50.18• \ P / � WC DIST / \ -55.35' `s Sj I I A321.86'�� / / WC DIST. be. I 8230.00' \ / \ \ -60.47' 200' I I D80 0'42• we DI#T. 1—A89.99' \ -34. R230.00' \ LOT 27 \ \ 10UTILITY I I D22'2509• �' j LOT 28\\w 5.06 Acres \\N 90 I I EASEMENT (TYPICAL) I �� w N WC DIST.-103.58' i m• CREATED THIS PLAT IN � `.` 1I 5.00 Acres II I N 9.94'\�\ LOT 31 11 I$ LOT 30� Im 1 \\ \ 0.00' LOT 2 �1"\ sz'o3• 10.12 Acres 1 Acres wD Disc -107•x' \ \ 5.09 Acres -,6. 1 I - ± m \ \\N13.29 111 51 \ LOT 32 Lao L79 5.01 Acres `�I I `. I1WC DIST-247.30' L81 L78 L•, \\ \ 1111 1 I L82 \ \ WC DIST.-82.11W WC DIST-86.33' I 1 \ \ L104 WC DIST.-121.15' L83 P. Wiae�o9' 159ei L105 L103 L102 L101 1 I \ L100 L84 L106 L99 L85 L107 L87 L108 L92 L86 L 3 L88 L89 L97 L94 L91 L90 L96 L95 COVENANTS A. THE 120' PRIVATE ROAD EASEMENTS NOTED ON THIS PLAT CONVEY A PERPETUAL EA WAY TO THE OWNERS OF LOTS TWELVE (12) THROUGH THIRTY-FOUR (34), CLIFF POIN SUBDIVISION. THE EASEMENT WILL RUN WITH THE LAND FOR THE DESIGNATED PARC