Loading...
RUSSELL EST 1ST BK 2 LT 5 - ZCP 7/17/2018Print Form Submit by Email Kodiak Island Borough Community Development Department 710 Mill Bay Rd. Rm 205 II I I I II II I I II II VIII I I III ` oe Kodiak AK 99615 Ph. (907) 486 - 9363 Fax (907) 486 - 9396 16107 http://www.kodiakak.us Zoning Compliance Permit Permit No. CZ2019-001 The following information is to be supplied by the Applicant: Property Owner / Applicant: Belma Llorente/ Putnam Construction Mailing Address: 1212 Selief Phone Number: 907-539 1528 Other Contact email, etc.: Legal Description: Subdv: RUSSELL EST IST BK 2 LT 5 Block: 2 Lot: 5 Street Address: 1212 Selief Use & Size of Existing Structures: Multifamily residence Description of Proposed Action: Replace windows and siding Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: R3 KIBC 17.85 PROP_ID 16107 Lot Area: 0.28 Acres Lot Width: 60' Bld'g Height: 35 ' Front Yard: 25' Rear Yard: 10, Side Yard: 5 ' Prk'g Plan Rvw? Yes # of Req'd Spaces: 12 Staff Compliance Review Notes and Specific Plat / Subdivision Requirements: No change to footprint Subd Case No. Plat No. Bldg Permit No. TBD bldg Dept Does the project involve NO an EPA defined facility? *Commercial buildings, installations (military bases), institutions (schools, hospitals) and residences with more than four (4) dwelling units. Driveway Permit? Septic Plan Approval: Fire Marshall: N/A N/A TBD Bldg Dept Proof of EPA notification provided (if required)? NO *Required for all demolitions, for renovations disturbing at least 160 square feet, 2601inear feet or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and for renovations that remove a load -supporting structural member. No permit will be issued for such projects without proof of EPA notification Applicant Certification' 1 hereby certify that will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Other Date: Jul 17, 2018 List Other: Authorization Signature: v This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED. "EXPIRATION. Any zoning compliance permit issued is subject to the same expiration, suspension, and revocation provisions as a building permit issued for the some construction permit.** CDD Staff Certification Date: Jul 17, 2018 CDD Staff: Dann McKenna -Foster r' Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building After -the -Fact 2X the published amount Not Applicable $0.00 $0.00 Less than 1.75 acres: $30.00 $60.00 1.76 to 5.00 acres: El 5.01 to 40.00 acres: ❑ 40.01 acres or more: El $60.00 / /�V ' E] $120.00 $90.00 Cllr �/ j R $180.00 $120.00 PAID r-� $240.00 JUL 17 2111 K(��INKt�t�tvuauGh 7-j6-18 A K ,-C4� �11�1�allll �1-11 �/,`�z �11-1 rle-