MILLER PT BK 3 LT 1A - ZCP 6/20/2018int Form Email
a
Kodiak Island Borough -- P -r - - Submit by -- --- -
Community Development Department
710Mill Bay Rd. Rm 205
Kodiak AK 99615III I I II I II II llll II I'll III
Ph. (907) 486 - 9363 Fax (907) 486 - 9396 21673
http://www.kodiakak.us
Zoning Compliance Permit Permit No. BZ2018-073
The following information is to be supplied by the Applicant:
Property Owner/ Applicant: Bayside West Business Park/ Mr. C.L. Lowenberg
Mailing Address: PO Box 9014
Phone Number: 503-939-2558
Other Contact email, etc.:
Legal Description: Subdv: Miller Point Block 3 Lot 1A Block: 3 Lot: 1A
Street Address:
Use & Size of Existing Structures:
Warehouses, gym business
Description of Proposed Action:
Add two additional 35'x160' warehouses
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points,
and vehicular parking areas.
Staff Compliance Review: Current Zoning: Business KIBC 17.90 PROP—ID 21673
Lot Area: 2.16 acres Lot Width: Not Applicable Bld'g Height: 50'
Front Yard: Not Applicable Rear Yard: Not Applicable Side Yard: Not Applicable
Prk'g Plan Rvw? Yes # of Req'd Spaces: 6
Staff Compliance Review Notes and Specific Plat / Subdivision Requirements:
17.175.040 Miniwarehouses 1 per 200 square feet of office area but not less than 3 spaces. More than 6 spaces are available,
mandated parking is indicated on site plan.
Subd Case No. Plat No. Bldg Permit No. TBD Bldg Dept
Does the project involve YES
an EPA defined facility?
*Commercial buildings, installations (military bases),
institutions (schools, hospitals) and residences with
more than four (4) dwelling units.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
N/A
N/A
TBD Bldg Dept
Proof of EPA notification provided (if required)? NO
*Required for all demolitions, for renovations disturbing at least 160 square
feet 260 linear feet or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and
for renovations that remove a load -supporting structural member.
No permit will be issued for such projects without proof of EPA notification
Applicant Certification: I hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that 1
have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Site Plan
Date: Jun 20, 2018
List Other:
Signature:
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED.
"EXPIRATION.- Any zoning compliance permit issued is subject to the same expiration, suspension, and revocation provisions as a
building permit issued for the same construction permit.**
CDD Staff Certification
Date: Jun 20, 2018 CDD Staff:
Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building
Not Applicable
Less than 1.75 acres:
1.76 to 5.00 acres:
5.01 to 40.00 acres:
40.01 acres or more:
❑ $0.00
❑
$30.00
❑X
$60.0
❑
$90.00
❑
$120.00
After -the -Fact 2X the published amount
❑ $0.00 � S^ i � 1
❑ $60.00 y
❑ $120.00-;
❑PAID El
JUN 20 2018
KOD AK16Lk UbUHD4GH
M10PPUP4 NT
r6 7 z -o (te ^ 0
m
N
(60
- 2n3ef
au
m
N