SUNRISE HAVEN LT 4 - ZCP 6/15/2018Kodiak Island Borough Print Form Submit by Email
Community Development Department
l•-�- � 710 Mill Bay Rd. Rm 205 II ( I I (I II I I III I I I I I I
ea Kodiak AK 99615 I I II
- • Ph. (907) 486 - 9363 Fax (907) 486 - 9396 23456
http://www.kodiakak.us
Zoning Compliance Permit Permit No. BZ2018-072
The following information is to be supplied by the Applicant:
Property Owner / Applicant: Charles Lewis
Mailing Address:
Phone Number:
Other Contact email, etc.:
PO Box 2302
907-942-1949
Legal Description: Subdv: SUNRISE HAVEN LT
Street Address: 551 Lupine
Use & Size of Existing Structures:
Vacant parcel
Block: Lot: 4
Description of Proposed Action:
Construct 20'x24' cabin and 10'x20' accessory building
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points,
and vehicular parking areas.
Staff Compliance Review: Current Zoning: Conservation KIBC 17.50 PROP—ID 23456
Lot Area: 5.56 acres Lot Width: 250' Bld'g Height: 35 ', 50' accessory
Front Yard: 25' Rear Yard: 25' Side Yard: 25 '
Prk'g Plan Rvw? Not Applicable # of Req'd Spaces: 3
Staff Compliance Review Notes and Specific Plat / Subdivision Requirements:
3 spaces of parking as required by code shown on the site plan.
Subd Case No. Plat No. 2011-18 Bldg Permit No. TBD Bldg Dept
Does the project involve NO
an EPA defined facility?
*Commercial buildings, installations (military bases),
institutions (schools, hospitals) and residences with
more than four (4) dwelling units.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
N/A
TBD Bldg Dept
TBD Bldg Dept
Proof of EPA notification provided (if required)? NO
*Required for all demolitions, for renovations disturbing at least 160 square
feet 1601inear feet or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and
for renovations that remove a load -supporting structural member.
No permit will be issued for such projects without proof of EPA notification
Applicant Certification: 1 hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Site Plan List Other:
Date: Jun 15, 2018 Signature: Y
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED.
**EXPIRATION: Any zoning compliance permit issued is subject to the same expiration, suspension, and revocation provisions as a
building permit issued for the same construction permit.**
CDD Staff Certification
Date: Jun 15, 2018
CDD Staff: Da enna-Foster
Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building
After -the -Fact 2X the published amount
Not Applicable ❑ $0.00 ❑ $0.00
Less than 1.75 acres: ❑ $30.00 ❑ $60.00
1.76 to 5.00 acres: ❑ $60.00 ❑ $120.00 ^ >?
5.01 to 40.00 acres: ❑X $90.00�F?Jvk❑ $180.00
40.01 acres or more: ❑ $120.00
❑ $240.00
PAID
JUN 15 2010
KODIAKIWANU WHUU