Loading...
EAST ADD BK 40 LT 9 - ZCP 5/17/2018Print Form Submit by Email Kodiak Island Borough - - d* ; Community Development Department 710 Mill Bay Rd. Rm 205 II Kodiak AK 99615 I I I I Ph. (907) 486 - 9363 Fax (907) 486 - 9396 14993 http://www.kodiakak.us Zoning Compliance Permit Permit No. CZ2018-045 The following information is to be supplied by the Applicant: Property Owner / Applicant: Romilio Sumera/ Stefan Macahilas Mailing Address: 1210 Baranof St Phone Number: 619-565-5867 Other Contact email, etc.: Legal Description: Subdv: EASTADD Block: 40 Lot: 9 Street Address: Use & Size of Existing Structures: Single family residence 1210 BARANOF ST Description of Proposed Action: �^ Replace deck and joist for deck. 4 Q 6 S i N ecAe d Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: R1 KIBC 17.75 PROP ID 14993 Lot Area: 5,000 SF Lot Width: 60' Bldg Height: 35 ' Side Yard: Front Yard: 25' Rear Yard: 10' Prk'g Plan Rvw? Not Applicable # of Req'd Spaces: 3 Staff Compliance Review Notes and Specific Plat / Subdivision Requirements: No change to building footprint 5' Subd Case No. Plat No. Bldg Permit No. TBD Bldg Does the project involve NO an EPA defined facility? *Commercial buildings, installations (military bases), institutions (schools, hospitals) and residences with more than four (4) dwelling units. Driveway Permit? Septic Plan Approval: Fire Marshall: N/A N/A TBD Bldg Dept Proof of EPA notification provided (if required)? NO *Required for all demolitions, for renovations disturbing at least 160 square feet 260 linear feet, or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and for renovations that remove a load -supporting structural member. No permit will be issued for such projects without proof of EPA notification Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan List Other: Date: May 17, 2018 Signature: This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED. ** EXPIRATION. Anyzoning compliance permit issued is subject to the same expiration, suspension, and revocation provisions as a building permit issued for the same construction permit.** CDD Staff Certification Date: May 17, 2018 CDD Staff. Dan nna- os er Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building After -the -Fact 2X the published amount Not Applicable ❑ $0.00 ❑ $0.00 Less than 1.75 acres: $30.OQ, ❑ $60.00 1.76 to 5.00 acres: ❑ $60.00 ❑ $120.00 5.01 to 40.00 acres: ❑ $90.00 C ❑ $180.00 40.01 acres or more: ❑ $120.00 ❑ $240.00 PA 1-M rn MAY 17 201$ KODIAKIbLiilvi,dUtjUU , F, 5/17/2018 Untitled Untitled - Daniel Mckenna-Foster Rommel Sumera <melmansumera@hotmail.com> Thu 5/17/2018 9:04 AM To: Daniel Mckenna-Foster <dnnckenna-foster@kodiakak.us>; I, Romillio R Sumera ( homeowner of 1210 Baranof St. ) is authorizing Stefan Macahilas to obtain a required building permit for the remodel of the said address. Any further questions, contact me at (907) 942-4441. Thank you https://mail.kodiakak.us/owa/#viewmodel=ReadMessageltem&ltemlD=AAMkADM3YTk3MDFlLWM4NWUtNDEzNC05MzZiLTMl MzZlZjlkYzVmNgBGAAAAAAD6 AIR. M. r 'W'i`A� i�<�';� �+', ��'� (' ,I��.•1: 'f'i'' :lr^j�('�t��•��:.•�} R AN !!.^r�i t FG !:1'7, 4. Y i w VIM r, iP; In MCA Itr�,Y� 1,p�r,, ' 1 �•I i��� � , 77�..'{" � ,��r'.;: r'wlv t, in pti'w,�irf 14 Sid Mks I EH hot 1 rl '.7 Tj oil fl .0 .0 10" OWT( 01 X X: a yi RJ oil; , 4. in i jg4f' toot Ali; o-4 tMi C.0 J,• Big , M NI I' I'• li f ri �, { ' , i:,• , is '}t 1). F t 1OV ANN A fill, 1 3 UEZ GI G 9 N 3 !WIN May, fit 'ja i I 9Z 5 Iv Rol; Aq I. 1 flUPS= out , I ! . 111. ib� •go fit. G+ Sjit is e: 11, It :. .. .,., . I., . , ., . * 1; - ,- - � i -., � 11 �,� 't:. i, - W :; , " :. i 1: r.i:, i, - -�. lss Y'. . 1 ! i" ;ji Am �q.wjq­ . it's, HEN Emil "l, 11 P. 14:12 JIM I -,ZT m M -TD CO i ZE rO rO M7 J n QJ rTl rqr 1