Loading...
USS 3945 T28S R19W - ZCP 4/23/2018Kodiak Island Borough I Print Form Submit by Email Community Development Department 710 Mill Bay Rd. Rm 205 ���.. Kodiak AK 99615 ' Ph. (907) 486 - 9363 Fax (907) 486 - 9396 16427 http://www.kodiakak.us Zoning Compliance Permit Permit No. CZ2018-040 The following information is to be supplied by the Applicant: Property Owner / Applicant: City of Kodiak Mailing Address: PO Box 1397, Kodiak, AK 99615 Phone Number: (907) 486-8060 Other Contact email, etc.: gmelvin@city.kodiak.ak.us Legal Description: Subdv: Portion of USS 3945 T.28S, R.19W (Pillar Mt. Gravel Pit) Block: ----- Lot: ----- Street Address: NHN Pillar Mountain Road, Kodiak, AK 99615 Use & Size of Existing Structures: The portion subject to this zoning compliance is a former gravel extraction site Description of Proposed Action: Site grading and reclamation (excavation and fill) as depicted on attached site plan. Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: Conservation KIBC 17.50 PROP—ID 16427 Lot Area: Site = approx. 6.5 acres Lot Width: 250' Bld'g Height: 35' Front Yard: 25 ' Rear Yard: 25' Side Yard: 25' Prk'g Plan Rvw? Not Applicable # of Req'd Spaces: Staff Compliance Review Notes and Specific Plat / Subdivision Requirements: Subd Case No. Plat No. Bld'g Permit No. TBD by Building Dept. Does the project involve NO an EPA defined facility? *Commercial buildings, installations (military bases), institutions (schools, hospitals) and residences with more than four (4) dwelling units. Driveway Permit? Septic Plan Approval: Fire Marshall: N/A N/A TBD by Building Dept. Proof of EPA notification provided (if required)? N / A *Required for all demolitions, for renovations disturbing at least 160 square feet 260 linear feet or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and for renovations that remove a load -supporting structural member. No permit will be issued for such aroiects without proof of EPA notification Applicant Certification: I hereby certify that) will comply with the provisions of the Kodiak Island Borough Code and that 1 have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan Date: Apr 23, 2018 List Other: City of Kodiak disposal of unusable or surplus materials document Signature: Glenn Melvin, Engineer, City Kodiak Public Works Department This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED. ** EXPIRATION: Any zoning compliance permit issued is subject to the same expiration, suspension, and revocation provisions as a building permit issued for the same construction permit.** CDD Staff Certification Date: Apr 23, 2018 CDD Staff: Jack Maker Payment Verification Zoning Compliance Permit Fee le in Cashier's 6ffice Room # 104 - Main floor of Borough Building After -the -Fact 2X the published amount Not Applicable ❑ $0.00 ❑ $0.00 Less than 1.75 acres: ❑ $30.00 ❑ $60.00 1.76 to 5.00 acres: ❑ $60.00 ❑ $120.00 5.01 to 40.00 acres: ® $90.0 ❑ $180.00 40.01 acres or more: ❑ $120.00 , � � ❑ $240.00 PAID@ APR 23 j7pp KODIAK«tHluU OUNU& CIA18 ifIr_ nCOADT4111=110T I PAYMENT DATE Kodiak Island Borough BATCH NO. 04/23/2018 710 Mill Bay Rd. 2018-00000577 COLLECTION STATION Kodiak, AK 99615 RECEIPT NO. CASHIER 2018-00001097 RECEIVED FROM CASHIER CITY OF KODIAK Teresa Medina DESCRIPTION NHN PILLAR MOUNTAIN RD KODIAK Zoning Compl Zoning Compliance Permit $90.00 CZ 2018 040 Payments: Type Detail Amount Check 521672 $90.00 Total Amount:I $90.00 Customer Copy Printed hv- Teresa Medina Pane 1 nf 1 04/23/2n1R 11 -n7 -1n AM Pillar Mountain Reclamation Fill Site CITY OF KODIAK ENGINEERING DEPARTMENT ALEUTIAN HOMES WATER AND SEWER PHASE VI SPECIAL PROVISIONS SECTION 209 DISPOSAL OF UNUSABLE OR SURPLUS MATERIAL Article 209.2 Construction Replace the first paragraph of Article 209.2 with the following; February 2018 Contractor shall dispose of unusable and surplus material in accordance with Section 211, Owner Provided Material Disposal Site. END OF SECTION 209 SP -1 Pillar Mountain Reclamation Fill Site February 2018 Add the following Special Provision: SECTION 211 OWNER PROVIDED MATERIAL DISPOSAL SITE Article 211.1 Description This work consists of providing all materials and performing all work necessary for Owner Provided Material Disposal Site preparation and unusable material disposal, including clearing and grubbing, subgrade preparation, construction of perimeter drains, placement of unusable or surplus material, preparation of a site-specific Storm Water Pollution Prevention Plan and the installation and maintenance of temporary erosion and pollution control measures. The following is the Owner provided material disposal site for unusable material or surplus material originating from other items of Work including but not limited to: Section 202, Clearing and Grubbing; Section 203, Excavation; Section 206, Trench Excavation and Backfill; and Section 207, Removal of Structures and Obstructions. Pillar Mountain Reclamation Fill Site: • Location — Approximately 1.5 miles from downtown Kodiak adjacent to Pillar Mountain Road • Access — Pillar Mountain Road • Approximate Total Site Disposal Quantity — 57,300 CY • Total Available Area for Disposal of Waste or Excess material — 4 AC Unusable or surplus material shall be inert construction or demolition material and may include land clearing waste, excavated dirt, rock, soil, stumps, wood waste, bricks, mortar, Portland cement type concrete, and crushed asphalt pavement in accordance with Section 209, Disposal of Unusable or Surplus Material and Alaska Department of Environmental Conservation regulations for Solid Waste Management 18 AAC 60. If material does contain hazardous waste do not dispose of the material in the owner provided disposal site. The owner provided disposal site will be actively used over several construction seasons. The disposal site will be considered closed once the final volume listed above and the final grades indicated on the Pillar Mountain Reclamation Fill Site drawings, see attached, have been reached. A project specific interim grading plan shall be provided as part of the Contractor's disposal plan, see Article 211.3 Construction for additional requirements. Article 211.2 Materials All materials shall be in accordance with Section 204, Classified Fill and Back Fill; Section 210, Furnish Filter Material; Section 702, Furnish and Install Pipe; Section 808, Geotextile, and Section 811, Topsoil. SP -2 Pillar Mountain Reclamation Fill Site February 2018 Submittals: Submit product data and samples for each type of material specified including the following: • Woven Geotextile: Woven geotextile is used for reinforcement and separation. The woven geotextile shall be Mirafi HP370 or an approved equal. • Non-woven/Permeable Geotextile: Non -woven geotextile is used for separation and filtering. The non -woven geotextile shall consist of Mirafi 160N or an approved equal. • Perimeter Drain: Perimeter drain pipe must be constructed from Corrugated Polyethylene Pipe (CPEP), or perforated High Density Polyethylene Pipe (HDPE), and conform to the requirements of Section 702, Furnish and Install Pipe. The pipe shall be perforated in accordance with Detail 700-3, Subdrain. • Impermeable Membrane: Impermeable Membrane used for perimeter drain shall consist of Miradrain 5000, or approved equal. • Compost: Compost shall be City of Kodiak compost produced at the City owned and operated Biosolids Composting Facility and shall possess no objectionable odors or substances toxic to plants, and shall not resemble the raw material from which it was derived. • Ditch Lining: Ditch lining shall use stones that are sound and durable, are no larger than 8 -inches in greatest dimension, and not more than 50 percent by weight passing the 3 - inch sieve as determined by ASSHTO T 27. Article 211.3 Construction A. General: Work shall comply with provisions of Section 202, Clearing and Grubbing; Section 203, Excavation; Section 204 Classified Fill and Backfill; Section 206, Trench Excavation and Backfill; Section 207, Removal of Structures and Obstructions; Section 209, Disposal of Unusable or Surplus Material; Section 210, Furnish Filter Material; Section 803, Erosion and Pollution Control; Section 304, Temporary Erosion and Pollution Control; Section 702, Furnish and Install Pipe; and Section 808 Geotextile. B. Laws: Conduct operations within the disposal site according to all applicable State, county, and federal laws including mining and fire laws. Provide, operate, and maintain wildland firefighting equipment appropriate for the current fire levels on-site at all times during all material source/disposal site operations. C. Permits: Copies of the Kodiak Island Borough issued Zoning Compliance permit and the material disposal site narrative for the material disposal site are available for inspection at SP -3 Pillar Mountain Reclamation Fill Site February 2018 the Project Manager's office. The Contractor shall examine and become familiar with all documents. Operations within the material source/disposal site shall conform to the stipulations and conditions of these documents and to all the requirements of the development plan and these Special Provisions. D. Preconstruction Conference Meeting: Before occupying material sources/disposal sites, attend a preconstruction conference at the disposal site with the Engineer, the owner and their representatives. Coordinate material disposal site use with the Engineer. The material disposal site project boundary shall be as shown and as staked. Do not operate beyond the material source/disposal site Project boundary or no work area(s) as shown and as staked unless otherwise directed. E. Site Development Plan & SWPPP: Prior to placement of unusable material prepare and submit a proposed Disposal Plan and obtain written approval. The disposal plan shall include proposed phasing/sequencing of material placement within the disposal site, proposed schedule including anticipated start of disposal grading activities and final stabilization, equipment to be used, site preparation and maintenance activities, site security and control, site-specific Storm Water Pollution Prevention Plan (SWPPP), and a proposed project specific interim grading plan. The interim grading plan will provide final grades achieved by disposal of project specific unusable materials, indicate disposal limits, top and toe of fill slopes, and final erosion control measures. Develop a site-specific SWPPP including a Temporary Erosion and Pollution Control Plan for the disposal site according to Sections 803, Erosion and Pollution Control, and 804, Temporary Erosion and Pollution Control and submit it to the Engineer at least 5 days prior to the preconstruction conference. Prior to proceeding with disposal install storm water silt fencing and straw wattles as shown on the contract drawings and as needed to control runoff. Do not allow any materials, including sediments, aggregate or crushing by-products to enter waterways or wetlands. F. Disposal Site Operations: The following apply during material disposal site operations: • Prior to placement of disposal material, the site shall be prepared by clearing and grubbing and by removing surficial organics and loose overburden materials. • Construct a perimeter drain along the toe of existing excavated rock slope, as indicated on the drawings. Perimeter drains shall be per City of Kodiak Standard Detail 700-2 Fin Drain Detail, or an Engineer approved equivalent. • Place the disposed material per the configuration and slopes indicated on the Pillar Mountain Reclamation Fill Site drawings. Depending on the amount of material to be SP -4 Pillar Mountain Reclamation Fill Site Febmary 2018 disposed, the final elevations on the drawings may not be reached, it is still required that the material is placed at the slopes and in a similar configuration shown on the drawings. • Disposed materials shall be placed in 12 -inch lifts and compacted using heavy equipment, a drum roller, or track vehicle. Compaction shall be sufficient to allow for standard fleet vehicle access/maintenance at the site. • The disposed material shall be brought up from the bottom in uniform horizontal layers, with the top of each layer graded to enable surface water to drain readily. Disposed material shall not be deposited by dumping loose material down slope faces. Break all tree stumps apart, stump -grind the root -ball apart, and incorporate into the disposal soil lifts to be compacted. Stump pieces too large for incorporation into a 12 -inch lift shall be individually placed into a shallow excavation in the disposal material and vibrated into a loose lift of disposal material using a large vibratory plate on an excavator. Once firmly seated, compact the loose lift around the stump, taking care to avoid creating voids due to the stump's geometry, and subsequent lifts should be placed in a similar fashion until fully buried. Large vertical piles of tree stumps or multiple lifts of stumps are prohibited. Lifts of compacted disposal material without stumps at least as thick the underlying stump layer should be placed over significant stump placement areas. A layer of geotextile such as Mirafi HP270 or similar can be placed above the disposal material lift overlying a significant stump layer to encourage bridging of voids and reduce sinkhole propagation into overlying layers. • Construct rock or compost and seed lined ditch at the locations show on the plans or as staked. Place and spread ditch lining materials so that the finished face is reasonable uniform and conforms with the lines and slope shown on the plans or as directed. • Place final cover as indicated on the Drawings and per the applicable special provisions. • Spread the compost evenly on the designated areas to the depth (after settlement) shown on the Drawings. Do not place the when the ground or compost is frozen, excessively wet, or in a condition detrimental to the work. Maintain areas covered by compost until subsequent seeding is accomplished. • Construct permanent storm water management features as directed herein and on the drawings. SP -5 Pillar Mountain Reclamation Fill Site February 2018 • Place only material that is identified as acceptable for this site in the disposal area as shown. Maintain a minimum 10 -foot wide buffer strip between the toe of the disposal area and the property boundary. Smooth and contour the disposal area to form side slopes no steeper than 8H:1 V. G. Disposal Site Clean-up and Vacating: Before vacating the material source/disposal site the following apply: • In addition to other areas within the site disturbed by the Contractor's operations, stabilize the disposal area by surface roughening, seeding, mulching, and tackifying, as directed. • Remove all Contractor owned, supplied or created structures, noncombustible debris, and equipment from the material disposal site. • Remove any solid waste and hazardous material from the site and dispose of properly. • If a spill or dumping has occurred or if a spill or dumping is suspected to have occurred, the Engineer will sample and test underlying material after all contaminated material is removed to assure compliance with DEQ regulations and to make sure that no material residue has been left behind. If test results show that material residue remains, perform additional cleanup measures according to DEQ requirements. • Attend a post -work meeting at the material disposal site to evaluate material disposal site rehabilitation work with the Engineer. Article 211.4 Measurement No measurement of quantities will be made for work performed under this Section. Article 211.5 Basis of Payment No separate or additional payment will be made for work performed under this Section. Payment will be included in payment made for the appropriate items under which this Section is required. SP -6 Pillar Mountain Reclamation Fill Site SECTION 811 TOPSOIL Article 811.1 General Replace this article with the following This work consists of furnishing and spreading topsoil or compost where shown on the Drawings. Article 811.2 Materials Add the following Item B: 2018 B. Compost: The City of Kodiak has compost stockpiled at their Pillar Mountain Water Treatment Facility. Compost can be used where stated in the contract documents or upon written approval by the Engineer. The compost will be available at no cost to the Contractor for use on this project. Article 811.5 Method of Measurement Add the following to the end of the Article: Compost shall be measured by cubic yard and include all coordination, transporting, handling, storing, and placement. Stockpiling and rehandling of compost during the stripping operations or during placement are incidental. Compost repair, maintenance, and replacement are incidental. Article 811.6 Basis of Payment Add the following pay item: ITEM NO. DESCRIPTION UNIT 811(2) Compost CY SP -7