Loading...
ERSKINE ADD BK 10A FIRE DEPT - ZCP 4/4/2018Print FormSubmit by Email Kodiak Island Borough t� Community Development Department 710Mill Bay Rd. Rm 205 Kodiak AK 99615 a II I I I III I I I II II I II I I II III Ph. (907) 486 - 9363 Fax (907) 486 - 9396 15269 http://www.kodiakak.us Zoning Compliance Permit Permit No. CZ2018-035 The following information is to be supplied by the Applicant: Property Owner / Applicant: City of Kodiak/Luke Smith Mailing Address: PO BOX 1397 Phone Number: Other Contact email, etc.: Legal Description: Subdv: ERSKINE ADD BK 10A FIRE DEPT Block: 10A Lot: Street Address: 71 a I --, nniII R.„ Rrl Use & Size of Existing Structures: Fire department Description of Proposed Action: Interior remodel work to a bathroom off of truck bay Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: Public Use KIBC 17.130 PROP -11D 15269 Lot Area: 2.03 acres Lot Width: 60' Bld'g Height: 50' Front Yard: 25 ' Rear Yard: 25% or 25' Side Yard: 10% or 25' Prk'g Plan Rvw? Not Applicable # of Req'd Spaces: Staff Compliance Review Notes: Plat / Subdivision Requirements? No changes to footprint Subd Case No. Plat No. Bld'g Permit No. TBD Bldg Dept Does the project involve YES an EPA defined facility? *Commercial buildings, installations (military bases), institutions (schools, hospitals) and residences with more than four (4) dwelling units. Driveway Permit? Septic Plan Approval: Fire Marshall: TBD Bldg Dept TBD Bldg Dept TBD Bldg Dept Proof of EPA notification provided (if required)? YES *Required for all demolitions, for renovations disturbing at least 160 square feet 260 linear feet or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and for renovations that remove a load -supporting structural member. No permit will be issued for such projects without proof of EPA notification Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Not Applicable List Other: Date: Apr 4, 2018 Signature: This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED. "EXPIRATION. Any zoning compliance permit issued is subject to the same expiration, suspension, and revocation provisions as a building permit issued for the same construction permit.** CDD Staff Certification Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building After -the -Fact 2X the published amount Not Applicable ❑ $0.00 ❑ $0.00 Less than 1.75 acres: ❑ $30.00 ❑ $60.00 1.76 to 5.00 acres: ❑X $60.00M'1 ❑ t I $120.00 I 5.01 to 40.00 acres:❑ $ 90.00 ❑ $ 180.00AIL 40.01 acres or more: ❑ $120.00 ❑ $240. �1) t>, 0 4 X01 ADJAKIWANrU ctn,Ah,rc ,rnnuicU�� LS Construction, LLC 1515 Mill Bay Road Kodiak AK 99615 (907) 539-2746 (907) 486-5723 (F) isconstruction@gci.net Quote: To the City of Kodiak for the remodel of the bathroom off of the fire truck bay at the city fire station. Job description: Remodel bathroom per specifications below. Included: 1. Removal and disposal of old fixtures and materials removed from bathroom except toilet. Keep same paper towel dispenser 2. Jackhammer small area around shower drain to receive new adjustable shower drain flange. 3. Build custom size shower base to fit width of bathroom 4. Install 1 %i" x 1 %:" the floor over custom shower pan base per contractors selection 5. Install solid surface curb to match walls for shower based on contractors stock colors 6. Prep sheetrock walls to receive %" Arctic white solid surface shower surround to go from shower base to ceiling. Contractor specified. Color selection to be Arctic White. Color picked by owner 7. Remove bathroom fan and change to a new Panasonic fan in a new location outside the shower area. Wrap all ducting with a plywood chase along the ceiling and then wrap with FRP panel to match the outside shower walls. Ducting to be exhausted out of existing hole through concrete center block. 8. White FRP panel from floor to ceiling. Install all trims. Glue and rivet where necessary. FRP panel ducting chase. 9. Paint sheetrock ceiling with a white paint. 10. Install new vanity sink base and countertop. Provided by owner 11. Install all plumbing for vanity base, shower drain, and shower valves. Shower valve fixtures and faucet supplied by plumber 12. Relocate and Install new baseboard heater outside of shower area and hide piping in wall. Per contractor location 13. Remove existing shower water lines and relocate and bury in left sidewall of shower. Valve to be on left. 14. Remove, Prep and Install new commercial quality linoleum floor 15. New light fixture above sink 16. Flat mirror above sink rather than medicine mirror 17. Special fire department towel holder with axe style. Per request. 18. White Shower curtain and rod 19. Electrical to hook up bath fan, install receptacle to left of sink in wall and bury electrical to vanity light in wall. 20. Building permit Fees Page 1 of 2 Not Included: 1. Any unforeseen complications and or Extra duties or anything not noted above % 7{J�iU LS Construction, LLC 1815 Mill Bay Road Kodiak AK 99615 (907) 539-2746 (907) 486-5723 (F) isconstruction@gci.net 2. Changing out drain plumbing and jackhammering any more than necessary to install new adjustable drain flange. 3. Any ceiling sheetrock repair work. None expected 4. No sheetrock patch work on walls of any kind since FRP is designed to cover. 5. Any toilet work or removals or reinstallations. We expect to leave in place and not remove (work around it). 6. No removal, replacement or any work done to door or frame (work around) 7. Shower door S. Prevailing wage rates, Davis Bacon wages, certified payroll and or overtime rates 9_ Any Building permit complications beyond this scope of work. Conversations and verbal approvals have been discussed with building official. Building official said he would not require this bathroom to be handicap assessable. 10. Any electrical outside of bathroom area. Assumed no new wiring needs upgraded besides what's specified. 11_ No shower drain relocation or any work done below 3 inches of the existing drain. No pipe replacements. 12. No lead or lead asbestos abatement test or work of any kind. City of Kodiak is fully responsible for anything relating to this sort of thing. 13. Any tax Total Lump sum price is li the above. Project start and completion: If project is awarded in the next 4-5 business days then work can start within the following few days due to the flexibility in LS Constructions schedule. If longer than that there may be a delay start to fit better in scheduling with other job contracts that are already in place and anticipated start date would be unknown. The duration of this Project should take approximately 2 weeks from start to finish. Approved and Accepted by: M, 110- Tve-je' Date:--�JIJJ-2zd� - '� Contractor � ''?-�`"' V '-' ............... `"� DateeS �� Page 2 of 2