KODIAK TWNST BK 13 LT 1A - ZCP 4/2/2018Print Form Submit by Email
••,, Kodiak Island Borough ___... _-- --.__
Community Development Department
710 Mill Bay Rd. Rm 205 II I I I III I IIII II II I
Kodiak AK 99615 I II I III
Ph. (907) 486 - 9363 Fax (907) 486 - 9396 15706
http://www.kodiakak.us
Zoning Compliance Permit Permit No. CZ2018-033
The following information is to be supplied by the Applicant:
Property Owner / Applicant: Alan Austerman/Housewright Construction
Mailing Address: 401 Lightfoot
Phone Number: 907-539-2444
Other Contact email, etc.:
Legal Description: Subdv: KODIAK TWNST BK 13 LT 1A Block: 13 Lot: 1A
Street Address: 401 Lightfoot
Use & Size of Existing Structures: Single family residence with accessory shed building
Description of Proposed Action: Build 24'x24' detached garage
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points,
and vehicular parking areas.
Staff Compliance Review:
Lot Area: 24,769 SF
Front Yard: 25 '
Prk'g Plan Rvw? Yes
Staff Compliance Review Notes:
Plat / Subdivision Requirements?
Current Zoning: R1
Lot Width:
60'
Rear Yard: 10'
# of Req'd Spaces: 3
KIBC 17.75
Bld'g Height:
Side Yard:
PROP_ID 15706
35'
10'
Subd Case No. Plat No. Bldg Permit No. Tbd Bldg Dept
Does the project involve NO
an EPA defined facility?
*Commercial buildings, installations (military bases),
institutions (schools, hospitals) and residences with
more than four (4) dwelling units.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Tbd Bldg Dept
N/A
N/A
Proof of EPA notification provided (if required)? NO
*Required for all demolitions, for renovations disturbing at least 160 square
feet, 260 linear feet, or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and
for renovations that remove a load -supporting structural member.
No permit will be issued for such projects without proof of EPA notification
Applicant Certification: 1 hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that)
have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Site Plan List Other:
Date: Apr 2, 2018 Signature:
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED.
** EXPIRATION: Any zoning compliance permit issued is subject to the same expiration, suspension, and revocation provisions as a
building permit issued for the same construction permit.**
CDD Staff Certification
Date: Apr 2, 2018 CDD Staff: Dan
Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104- Main floor of Borough Building
After -the -Fact 2X the published amount
Not Applicable
❑
$0.00
❑
$0.00
Less than 1.75 acres:
0
$30.06;
❑
$60.00
1.76 to 5.00 acres:
❑
$60.00
❑
$120.00
5.01 to 40.00 acres:
❑
$90.00
❑
$180.00 91
40.01 acres or more:
❑
$120.00
❑
$240.00
}} ry}A
/ r:,Pf,S
�UDl�rc i�4.filVLI Ou�s�1UG�,
SIM A!!tf►r'r�r�ht�inA�R1T
� tea; o � • � ;,�`, � .
T
jo
`.bra m �`, �►�[+
1 i
r !
G' 2 3
1 \ vo
AV
N
�r 6� cn �r
tea, 3sr , • yw � �6 G
Sd -`y- � moo, s �N r -t-•
Vo c,
T .o
OQ o o 'rc
�a
1C zo e3 R_ 4�yooN�T �q I
oy0 /
,.�'► s o14-
a\
a ►�, w
ti l \ I
COv
CJS (_V C4 ✓tet e)
lett side of building (as seen on attached plans). "these windows will have a
roubhly 9' elevation to top of rough opening.
'total cost- 579,1' 25
5W'?: is due upfront and remaining 7aNJ is due upon completion of contract.
Exclusions:
• Additional structural supports called out by engineering that are
beyond prescriptive building methods.
• KEA.ser.'ice move.
•
Surveyorfees and correspondence
• Additional work created durina shed removal and temporary
electrical service install. (wall patching, roofing patching ect...
• Any and all excavation work that is beyond the above described
excavation plan.
• Additional excavation cost (if any) will be determined by
excavation contractor. All other additional cost will be billed on a
T&M basis ;with an hoL'rly rate of S5 per min -hour and
materials ai retail.
• any shin ; not described in above c pages.
This contract is in its entirety anything more should not be
expected.
llousewright Construction
Austerman
Date
D to
Check :r