Loading...
USS 3066AB BK 2 LT 4B - ZCP 10/9/2017Kodiak Island Borough L Print Form I Submit by Email Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 III I I II I II I III I I II' IIIII Ph. (907) 486 - 9363 Fax (907) 486 - 9396 24253 http://www.kodiakak-us Zoning Compliance Permit Permit No. BZ2018-021 The following information is to be supplied by the Applicant: Property Owner / Applicant: Salvation Army/Innocent Damiano Mailing Address: Phone Number: 512-7176 Other Contact email, etc.: Legal Description: Subdv: USS 3066AB Block: 2 Lot: 4B Street Address: 1867 Mission Drive Use & Size of Existing Structures: Various structures and facilities Description of Proposed Action: Reroof of thrift store building Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: Business KIBC 17.90 PROP ID 24253 Lot Area: 1.36 acres Lot Width: Not Applicable Bld'g Height: 50' Front Yard: Rear Yard: Side Yard: Prk'g Plan Rvw? Not Applicable # of Req'd Spaces: Staff Compliance Review Notes and Specific Plat / Subdivision Requirements: Reroof, no change in footprint Subd Case No. Plat No. Bld'g Permit No. TBD Bldg Dept Does the project involve YES an EPA defined facility? *Commercial buildings, installations (military bases), institutions (schools, hospitals) and residences with more than four (4) dwelling units. Driveway Permit? Septic Plan Approval: Fire Marshall: N/A N/A TBD Bldg Dept Proof of EPA notification provided (if required)? NO *Required for all demolitions, for renovations disturbing at least 160 square feet, 260 linear feet, or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and for renovations that remove a load -supporting structural member. No permit will be issued for such projects without proof of EPA notification Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that) have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan Date: Oct 9, 2017 List Other: i re: This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED. ** EXPIRATION: Anyzoning compliance permit issued is subject to the same expiration, suspension, and revocation provisions as a building permit issued for the some construction permit." CDD Staff Certification Date: Oct 9, 2017 CDD Staff: anie cKenna-Foster Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building After -the -Fact 2X the published amount Not Applicable ❑ $0.00 ❑ $0.00 Less than 1.75 acres: $30.00 v $60.00 1.76 to 5.00 acres: ❑ $60.00 ? U 0� ❑ $120.00 5.01 to 40.00 acres: ❑ $90.00 ❑ $180.00 40.01 acres or more: ❑ $120.00 PAM❑ $240.00 o r T LIA KODIAKib muourimil qRJ"JPVnMArMNrAv0F del VI �M f— C N M m '0 LA 0 X ;o ;v M m m m 0 > M, m 05 lz > m > U) m 3 r) m o oo M ;o to z Z m -,4 I—A Lnm r- w U) -4 1-4 tA > tA 0 0 x Co z to Daniel Mckenna-Foster From: Lola Davis < Lola. Davis@usw.salvationarmy.org> Sent: Monday, August 21, 2017 11:15 AM To: Daniel Mckenna-Foster Subject: RE: Permits Good enough. Let try and kill two birds with one email. The Salvation Army is in the process of doing some major remodeling and repairs that are long overdue. We have two contractors doing the work for us Ken Knowles of Lightfoot Construction and Innocent Damiano of Trinity Builders. Both have permission from The Salvation Army to apply for permits for the work they have been hired to do. Thank you! From: Daniel Mckenna-Foster [mailto:dmckenna-foster@kodiakak.us] Sent: Monday, August 21, 2017 11:02 AM To: Lola Davis <Lola.Davis@usw.salvationarmy.org> Subject: RE: Permits Dear Lola, Ken Knowles stopped by for a zoning compliance permit to do some work on the Salvation Army building on Mission. Could you send me an email as below authorizing him to do work on the property behalf of the Salvation Army? Thank you, Daniel From: Lola Davis [mailto: Lola. DavisCabusw.salvationarmy.org] Sent: Tuesday, June 20, 2017 12:19 PM To: Daniel Mckenna-Foster Subject: Permits Greetings! My name is Lola Davis and my husband and I are in charge of The Salvation Army here in Kodiak. It is my understanding that you need to have my permission for Innocent Damiano to pull permits for some building projects we have going on. Thank you! Blessings! Major Lola Davis Kodiak, Alaska