Loading...
MILLER PT BK 5 LT 3A - ZCP 9/28/2017Kodiak Island Borough go Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 Ph. (907) 486 - 9363 Fax (907) 486 - 9396 httn://www.kodiakak.us h �� C.� Print Form I F—SubmitbyEmall 1111111111111111111111111 21-102 Zoning Compliance Permit Permit No. BZ2018-018 The following information is to be supplied by the Applicant: Property Owner/ Applicant: Bay Side Fire Department/KIB Mailing Address: Phone Number: 486-4536 Other Contact email, etc.: Legal Description: Subdv: Miller Point Block: 5 Lot: 3a Street Address: 4606 Rezanof Use & Size of Existing Structures: Fire Department Description of Proposed Action: Put up 2 Flag poles recently donated from Abercrombie Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: Public Use KIBC 17.130 PROP ID 21702 Lot Area: 3.5 acres Lot Width: Varies Bld'g Height: 50' Front Yard: Varies Rear Yard: Side Yard: Prk'g Plan Rvw? Not Applicable k of Req'd Spaces: Staff Compliance Review Notes and Specific Plat / Subdivision Requirements: No change to footprint or increase in use, just addition of 2 flagpoles. Subd Case No. Plat No. Bld'g Permit No. TBD Bldg Dept cn 2:1 g f _ W Ul >- .jtf M m n o 4a o �- aar � W IIBv 1LM V O G Cl D Ol Of Cl In ro Ch m N 1 0. C L D �+ jZ G O D � D C tYtpy N [II O iO h M O N D J N O1 'O J In l7 Q I I a 0 C) C3 0 v 0 0 ro �r �6 Q N N N N O O o O s w cnd d N 7' to O 0 N Qn O O v C E c N Y C Does the project Involve YES Proof of EPA notification provided (if required)? NO an EPA defined facility? `Required for all demolitions, for renovations disturbing at least 260 square 'Commercial buildings, Installations fmilltorybases), feet, 260 lineorfeet, or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and Institutions (schools, hospitals) and residences with Jor renovations that remove a load -supporting structural member. more than four (4) dwelling units. No aermit will be issued for such aroiects without proof of EPA notification Driveway N/A Permit? Septic Plan N/A Approval: Fire TBD Bldg Dept Marshall: Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that 1 have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requireipents. Attachments? Site Plan Date: Sep 26, 2017 List This permit is only for the proposed project as described by the applicant. if there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED. "EXPIRATION. Any zoning compliance permit issued is subject to the same expiration, suspensi , and revocation provisions as a building permit issued for the same construction permit." CDD Staff Certification — Date: Sep 26, 2017 CDD Staff: DanLlpVv' a -Fos er Payment Verification Zoning Compliance Permit Fee Payable In Cashier's Office Room # 104 - Main floor of Borough Building After -the -Fact 2X the published amount Not Applicable ❑ $0.00 ❑ $0.00 Less than 1.75 acres: ❑ $30.00 ❑ $60.00 1.76 to 5.00 acres: $60.06—DIV _ ❑ $120.00 5.01 to 40.00 acres: ❑ $90.00 ❑ $180.00 40.01 acres or more: ❑ $120,00 ❑ $240,00