PASAGSHAK 2ND BK 1 LT 17 - ZCP 9/20/2017., Kodiak Island Borough Print Form Submit by Email
Community Development Department
II IIII I I
710 Mill Bay Rd. Rm 205 I I II () I
Kodiak AK 99615
Ph. (907) 486 - 9363 Fax (907) 486 - 9396 19212
http;//www.kodiakak.us
Zoning Compliance Permit Permit No. BZ2017-103
The following information is to be supplied by the Applicant:
Property Owner/ Applicant: Richard Powell
Mailing Address: 2540 E Harmon Avenue NV
Phone Number:
Other Contact email, etc.:
Legal Description:
206-399-8109
Subdv: Pasagshak 2nd
Street Address: 42037 Furin
Use & Size of Existing Structures:
Single family residence
Block: 1 Lot: 17
Description of Proposed Action:
Install 8'x40' trailer on the property
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points,
and vehicular parking areas.
Staff Compliance Review: Current Zoning:�M KIBC 17.75 PROP—ID 19212
Lot Area: .92 Acres Lot Width: 120' Bld'g Height: 35'
Front Yard: 25 ' Rear Yard: 20, Side Yard: 15'
Prk'g Plan Rvw? Yes # of Req'd Spaces: 3
Staff Compliance Review Notes and Specific Plat/ Subdivision Requirements:
Subd Case No. Plat No. Bldg Permit No. TBD Bldg Dept
Does the project involve NO
an EPA defined facility?
*Commercial buildings, installations (military bases),
institutions (schools, hospitals) and residences with
more than four (4) dwelling units.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
N/A
N/A
TBD Bldg Dept
Proof of EPA notification provided (if required)? NO
*Required for all demolitions, for renovations disturbing at least 160 square
feet, 2601inear feet or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and
for renovations that remove a load -supporting structural member.
No permit will be issued for such proiects without proof of EPA notification
Applicant Certification: 1 hereby certify that will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Site Plan List Other:
Date: Jun 27, 2017 Signature:
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED.
"EXPIRATION. Any zoning compliance permit issued is subject to the same expiration, suspension, and revocation provisions as a
building permit issued for the same construction permit.**
CDD Staff Certification
Date: Jun 27, 2017 CDD Staff:
Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building
Not Applicable
Less than 1.75 acres:
1.76 to 5.00 acres:
5.01 to 40.00 acres:
40.01 acres or more:
❑
$0.00
❑X
$30.q0,y,,,
"'�
E]$60.00
❑
$90.00
❑
$120.00
After -the -Fact 2X the published amount
❑ $0.00
❑ $60.00
❑ $120.00
❑ $180.00
�il
❑ $240.00 �111- I
JUN 2 7 2017 j
KODiAWAiviiuunuOH
FIArmprnmAtm nrr
/(42
47 „00•
LO'