Loading...
USS 2539 PARCEL A & B WOMANS BAY - ZCP 9/19/2017Kodiak Island Borough Print Form Submit by Email Community Development Department *" 710 Mill Bay Rd. Rm 205 II I I I VIII I II II I a . Kodiak AK 99615 VIII I III Ph. (907) 486 - 9363 Fax (907) 486 - 9396 17497 http://www.kodiakak.us Zoning Compliance Permit Permit No. BZ2018-017 The following information is to be supplied by the Applicant: Property Owner / Applicant: Jerrol Friend Mailing Address: 1717 TIDEWATER ROAD Phone Number: Other Contact email, etc.: Legal Description: Subdv: USS 2539 Parcel A&B Womans Bay Block: Lot: Street Address: 7205 REZANOF DR Use & Size of Existing Structures: Office/shop , industrial activity. Description of Proposed Action: Re -roof, new siding, doors and windows. No footprint change Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: Industrial KIBC 17.105 PROP—ID 17497 Lot Area: 3.45 acres Lot Width: 75' Bldg Height: Front Yard: 30' Rear Yard: 20' Side Yard: Prk'g Plan Rvw? Not Applicable # of Req"d Spaces: NAMML AIL Staff Compliance Review Notes and Specific Plat/ Subdivision Requirements: FMID No changes to footprint or use SEP t 9 2017 KODiAKNAWL1 rsMUGH �i�ton�irF!n��ra�rn�n�T Subd Case No. Plat No. Bldg Permit No. TBD Bldg Dept Does the project involve YES an EPA defined facility? *Commercial buildings, installations (military bases), institutions (schools, hospitals) and residences with more than four (4) dwelling units. Driveway Permit? Septic Plan Approval: Fire Marshall: N/A N/A TBD Bldg Dept Proof of EPA notification provided (if required)? NO *Required for all demolitions, for renovations disturbing at least 160 square feet 260 linear feet, or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and for renovations that remove a load -supporting structural member. No permit will be issued for such projects without proof of EPA notification Applicant Certification: 1 hereby certify that) will comply with the provisions of the Kodiak Island Borough Code and that) have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan Date: Sep 19, 2017 List Other: Signature: This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED. "EXPIRATION. Any zoning compliance permit issued is subject to the same expiration, suspension and revocation provisions as a building permit issued for the same construction permit." CDD Staff Certification Date: Sep 19, 2017 CDD Staff: J ,�,(.(,Wn( �� VA, Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building After -the -Fact 2X the published amount Not Applicable ❑ $0.00 ❑ $0.00 Less than 1.75 acres: ❑ $30.00 ❑ $60.00 1.76 to 5.00 acres: ❑X $60.00 ❑ $120.00 5.01 to 40.00 acres: ❑ $90.00 ❑ $180.00 40.01 acres or more: ❑ $120.00 ❑ $240.00 M', L\j PAYMENT DATE OS/1S/2O17 COLLECTION STATION CASHIER RECEIVED FROM Friend Contractors LLC DESCRIPTION Matson Zoning Permit B32O1O-017 Kodiak Island Borough 71DMill Bay Rd. Kodiak, AK 99615 BATCH NO. 2018-00000135 RECEIPT NO. 2018-00000291 CASHIER Cashier PAYMENT CODE RECEIPT DESCRIPTION TRANSACTION AMOUNT Zoning Compliance Permit $60.00 Zoning Compl Payments: Type Detail Amount � Check 16490 $60.00 Total Amount: Customer Copy -}-- U 0 V V S._, 0 0 4- 0 -F— Q.� E W -f— FRIEND CONTRACTORS 1950 MILL BAY ROAD KODIAK, AK 99615 Friend Contractors, LLC General Connruction at Energy Speciailsrs Proposal to Perform Construction Services for Matson -Kodiak, AK Date Services Performed By: Services Performed For: May 25, 2017 FRIEND CONTRACTORS IN-UTSON NAVIGATION OF 1950 MILL BAY ROAD ALASKA KODIAK, AK 99615 KODIAK, AK 99615 Friend Contractors, LLC is pleased to offer a statement of work for the property located at 7205 Rezanof Drive, Kodiak. Scope of Work Friend Contractors will complete the following Scope of Work: • Clean existing roof as needed. • Install wood blocking as needed for flashings and edges. • Install Type II EPS ridged flute filler insulation between 2' on center ribs. • Install'/4" Invinsa Board as Cover board. • Install 60 mill Single ply roofing membrane mechanically fastened with Rhino Bond Plates attached to the existing building girt system as per manufactured recommendations. • Install 24 Ga PVC edge metal at eaves and 24 Ga cap at walls. • Install plywood backing and new coping flashing on parapet walls insulate as needed. • A new 2 year installers warranty and a 15 year manufactures standard warranty. • Treated wood facia on one mall of eaves TOTAL COST - $ 70,000.00 Period of Performance We understand time is important for this project and will make every effort to complete the project quickly. Proposalfor Matson l\lorigntion ofAlarka -Mny 25, 2017 Fee Schedule This engagement will be conducted on a flat fee basis. The total value for the Services pursuant to this SOW shall not exceed $ 70,000.00 unless otherwise agreed to by both parties via the project change control procedure, as outlined within. A PCR will be issued specifying the amended value. Upon completion of this Performance Period, Contractor and Client will have the option to renew this agreement for an additional then -stated number of hours at the then -current hourly rate for those resources identified. The client shall pay a material deposit in the amount of $ 35,000 deposit with the balance to be paid upon completion. Invoices are due upon receipt. Payments for services invoiced that are not received within 30 -days from date of invoice will be subject to a 5% penalty per calendar month. Assumptions The contractorwill have unlimited access to the job site. Arbitration In the event of any dispute, claim, question, or disagreement arising from or relating to this agreement or the breach thereof, the parties hereto shall use their best efforts to settle the dispute, claim, question, or disagreement. To this effect, they shall consult and negotiate with each other in good faith and, recognizing their mutual interests, attempt to reach a just and equitable solution satisfactory to both parties. If they do not reach such solution within a period of 60 days, then, upon notice by either party to the other, all disputes, claims, questions, or differences shall be finally settled by arbitration administered by the American Arbitration Association in accordance with the provisions of its Commercial Arbitration Rules. Exclusions • Structural work • Permits • Engineering • Any discoverable work Comoletion Criteria Contractor shall have fulfilled its obligations when any one of the following first occurs: Contractor accomplishes the Contractor activities described within this SOW and Client accepts such activities and materials without unreasonable objections. The Contractor and Client will walk the premises together to determine the level of completion at the request of the contractor. No response from Client within 2 -business days of deliverables being delivered by Contractor is deemed acceptance. Proposal for tllatsoa Naiigahon of Alaska -A Ly 25, 2017 Project Change Control Procedure The following process will be followed if a change to this SOW is required: A Project Change Request (PCR) will be the vehicle for communicating change. The PCR must describe the change, the rationale for the change, and the effect the change will have on the project. The designated Project Manager of the requesting party* (Contractor or Client) will review the proposed change and determine whether to submit the request to the other party. Both Project Managers will review the proposed change and approve it for further investigation or reject it. Contractor and Client will mutually agree upon any charges for such investigation, if any. If the investigation is authorized, the Client Project Managers will sign the PCR which will constitute approval for the investigation charges. Contractor will invoice Client for any such charges. The investigation will determine the effect that the implementation of the PCR willhave on SOW price, schedule and other terms and conditions of the Agreement. • Upon completion of the investigation, both parties will review the impact of the proposed change and, if mutually agreed, a Change Authorization will be executed. • A written Change Authorization and/or PCR must be signed by both parties to authorize implementation of the investigated changes. IN WITNESS WHEREOF, the parties hereto have caused this SOW to be effective as of the day, month and year first written above. Matson Navigation of Alaska FRIEND CONTRACTORS t By: By: Name: Name: Brenda S. Friend Title: Title: President Owner Proposal fortlfatsou 1\tanfgatiou oJAlurku d1ay 25, 2017 r. �• .a +dry r' x ,A&l• �. ,1 'S rM► y ..., . �# '� � � � w"� �Mw 1 `� r. �• .a +dry r' x ,A&l• �. ,1 'S