Loading...
PASAGSHAK 2ND BK 1 LT 17 - ZCP 6/27/2017�-` Kodiak Island Borough Print Form Submit by Email uxru Community Development Department 710 Mill Bay Rd. Rm 205 III II IIIIIIIIIIIIII III III Kodiak AK 99615 Ph. (907) 486 - 9363 Fax (907) 486 - 9396 19212 http://www.kodiakak.us Zoning Compliance Permit Permit No. BZ2017-103 The following information is to be supplied by the Applicant: Property Owner/ Applicant: Richard Powell Mailing Address: 2540 E Harmon Avenue NV Phone Number: 206-399-8109 Other Contact email, etc.: Legal Description: Subdv: Pasagshak 2nd Block: 1 Lot: 17 Street Address: 42037 Furin Use & Size of Existing Structures: Single family residence Description of Proposed Action: Install 8'x40' trailer on the property Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: R1 KIBC 17.75 PROP—ID 19212 Lot Area: .92 Acres Lot Width: 120' Bld'g Height: 35 ' Front Yard: 25 ' Rear Yard: 20' Side Yard: 15' Prk'g Plan Rvw? Yes # of Req'd Spaces: 3 Staff Compliance Review Notes and Specific Plat /Subdivision Requirements: Subd Case No. Plat No. Bld'g Permit No. TBD Bldg Dept Does the project involve NO an EPA defined facility? *Commercial buildings, installations (military bases), institutions (schools, hospitals) and residences with more than four (4) dwelling units. Driveway Permit? Septic Plan Approval: Fire Marshall: N/A N/A TBD Bldg Dept Proof of EPA notification provided (if required)? NO *Required for all demolitions, for renovations disturbing at least 160 square feet 260 linear feet or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and for renovations that remove a load -supporting structural member. No permit will be issued for such projects without proof of EPA notification Applicant Certification: 1 hereby certify that) will comply with the provisions of the Kodiak Island Borough Code and that 1 have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan Date: Jun 27, 2017 List Other: Signature: RIt" This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED. "EXPIRATION.- Any zoning compliance permit issued is subject to the same expiration, suspension, and revocation provisions as a building permit issued for the same construction permit.** CDD Staff Certification Date: Jun 27, 2017 CDD Staff: Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building After -the -Fact 2X the published amount Not Applicable F $0.00 El $0.00 f Less than 1.75 acres: 0 $30.q!!;, .,�— El $60.00 I 1.76 to 5.00 acres: E] $60.00 V`�i` $120.00 5.01 to 40.00 acres: F $90.00 $180.00 40.01 acres or more: 0 $120.00 E] $240.00 iMA� wwr JUN 2 7 2017 0 KODIAKNAW tWOUGh Rh1ANm.;:nCPAtmVRrr O ✓ LI -I I Qz z9 104 fYv1a T1s O'WALKWAY----- rm 6jro 'o k-ly) 00 i c, 7 LOI