ELDERBERRY HGTS 4TH BK 4 LT 10 - ZCP 10/14/2016- Kodiak Island Borough Print Form Submit by Email
Community Development Department
710lBay Rd. m 205
iak AK 9965
Kodiak
Ph. (907) 486 - 9363 Fax (907) 486 - 9396
16040
http://www.kodiakak.us
Zoning Compliance Permit Permit No. CZ2017-019
The following information is to be supplied by the Applicant:
Property Owner/ Applicant: Frank Dorner
Mailing Address: PO Box 320, Kodiak, AK 99615
Phone Number:
Other Contact email, etc.:
Legal Description: Subdv: Elderberry Heights 4th Addition Block: 4 Lot: 10
Street Address: 1616 Lynden Way
Use & Size of Existing Structures: Single family residence
Description of Proposed Action: Build a 24'x26' addition off south side; garage on first floor and 3 bedroom, 1 bathroom above.
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points,
and vehicular parking areas.
Staff Compliance Review: Current Zoning: R2 KIBC 17.80 PROP—ID 16040
Lot Area: .25 acres
Front Yard: 25 '
Prk'g Plan Rvw? Not Applicable
Staff Compliance Review Notes:
Plat/ Subdivision Requirements?
Lot Width:
Rear Yard: 10,
# of Req'd Spaces: 3
Bld'g Height:
Side Yard:
35'
5'
Additional parking plan review not required for addition to existing single family structure
Subd Case No. Plat No. Bldg Permit No.
Does the project involve NO
an EPA defined facility?
*Commercial buildings, installations (military bases),
institutions (schools, hospitals) and residences with
more than four (4) dwelling units.
Driveway N/A
Permit?
Septic Plan TBD
Approval:
Fire TBD
Marshall:
Proof of EPA notification provided (if required)? N / A
*Required for all demolitions, for renovations disturbing at least 160 square
feet 2601inear feet, or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and
for renovations that remove a load -supporting structural member.
No permit will be issued for such projects without proof of EPA notification
Applicant Certification: I hereby certify that) will comply with the provisions of the Kodiak Island Borough Code and that 1
have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Site Plan
Date: Oct 14, 2016
List Other:
Signature: Luke Smith, Contractor
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED.
** EXPIRATION: Any zoning compliance permit issued is subject to the same expiration, suspension, and revocation provisions as a
building permit issued for the same construction permit.**
CDD Staff Certification
Date: Oct 14, 2016
CDD Staff: Sara Mason
Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building
Not Applicable
❑
$0.00
Less than 1.75 acres:
$30.0
1.76 to 5.00 acres:
❑
$60.00
5.01 to 40.00 acres:
❑
$90.00
40.01 acres or more:
❑
$120.00
After -the -Fact 2X the published amount
❑ $0.00
❑ $60.00 %�)
❑ $120.00 / v
❑ $180.00 09
❑ $240.00 PAIDO
OCT 14 2016
KODIAK ISLAND 80HOUGH
ANANCF nFPaMMF-
PAYMENT DATE
10/14/2016
COLLECTION STATION
CASHIER
RECEIVED FROM
LUKE SMITH
DESCRIPTION
FRANK DORNER- 1616 LYNDEN
Kodiak Island Borough
710 Mill Bay Rd.
Kodiak, AK 99615
BATCH NO.
2017-00000191
RECEIPT NO.
2017-00000422
CASHIER
Teresa Medina
PAYMENT CODE RECEIPT DESCRIPTION TRANSACTION AMOUNT
ComplianceZoning Compl Zoning • 0•
1 CZ 2017 • • 1.
Payments: Type Detail Amount
Check 2110 $30.00
Total Amount:
Customer Copy
$30.00
Printed hv- Teresa Medina Pana 1 of 1 10/1412016 09-31 -50 AM
.1-- -.1 -----
(907) 539-2746 (907) 486-5723 (F)
Isconstruction@gci.net
October 2016
Dorner Residence
1616 Lynden way
Kodiak, AK 99615
Frank and Amanda Dorner
42
Al,
i._
Quote to: Frank and Amanda: Don- er for a M x 26'tri
Lynden Way. Addition to include 3 SrhaN Be€iroams, and 2 H.19 nihe
upper floor and a garage on the main liar
3 _
See All Attached Plans and Specifications for retails and Aflowances,
Terms: Upon award of contract a 4� deposit required in order to move
forward with plans, and permits. Payment schedule will be at minimum every
two weeks. All invoices must be paid within 5 business days.
Work anticipated on existing structure is to install a door between existing boiler
room and garage; install a hallway opening from upper living area in to the new
addition hallway. Also, remove one -bedroom window and drywall patch the hole
with painting done by owner.
LS Construction LLC estimates this project to be approximately 4 to 5 month's
long from start to finish given that we don't have adverse acts of weather,
material delays, sub -contractor delays, change orders that result in delays,
funding delays, Building official plan review delays or major medical issues within
the LS Construction crew. We will work diligently to complete this project in a
timely manner. Anticipated times to take a several days off are based on the
Kodiak school schedule for Holidays so families can spend time together. LS
Construction is ready to start as of October 19th with foundation work however if
funding is not available yet LS Construction must keep crew working on other
small projects until funding is available so the crew has a paycheck and can feed
families. Small projects may take time to complete. If LS Construction has delays
out of our direct control then time frame may need to be extended. While
subcontractors are on the project completing their phases and LS construction is
waiting for them to complete projects we reserve the right to go work on other
small projects between. LS Construction will make Dorner Project a priority to
complete. We are in a race against weather so it is in our company's best interest.
'�LtOJ�1Yj0,p
1;,30,