Loading...
RUSSIAN RIVER EST LT 8 - ZCP 10/6/2016Kodiak Island Borough Print Form Submit by Email S. Community Development Department p 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 ` Ph. (907) 486 - 9363 Fax (907) 486 - 9396 22552 http://www.kodiakak.us Zoning Compliance Permit Permit No. BZ2017-038 The following information is to be supplied by the Applicant: Property Owner / Applicant: Stevi Sison Mailing Address: 12834 Middle Bay Drive, Kodiak, AK 99615 Phone Number: (907) 942-4942 Other Contact email, etc.: stevisison@gmail.com Legal Description: Subdv: Russian River Estates Block: --- Lot: 8 Street Address: 12834 Middle Bay Drive, Kodiak, AK 99615 Use & Size of Existing Structures: Single-family residence (MHR) Description of Proposed Action: Demolition of existing single-family residence (MHR) and construction of new 28'x 44' single-family residence as shown on attached site plan. Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Lot Area: 1.1 acres Front Yard: 25 ' Prk'g Plan Rvw? Yes Staff Compliance Review Notes: Plat/ Subdivision Requirements? Current Zoning: RR1 Lot Width: 120' Rear Yard: 20' # of Req'd Spaces: 3 KIBC 17.70 PROP—ID 22552 Bld'g Height: 35' Side Yard: 15 ' Subd Case No. Plat No. Bld'g Permit No. TBD by Building Dept. Does the project involve NO an EPA defined facility? *Commercial buildings, installations (military bases), institutions (schools, hospitals) and residences with more than four (4) dwelling units. Driveway Permit? Septic Plan Approval: Fire Marshall: N/A N/A TBD by Building Dept. Proof of EPA notification provided (if required)? N / A *Required for all demolitions, for renovations disturbing at least 160 square feet 2601inear feet or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and for renovations that remove a load -supporting structural member. No permit will be issued for such projects without proof of EPA notification Applicant Certification: 1 hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that 1 have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan Date: Oct 6, 2016 List Other: with parking plan Signature: Stevi Sison 4 t This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. THIS FORM DOES NOTA UTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED. "EXPIRATION: Any zoning compliance permit issued is subject to the same expiration, suspension, and revocation provisions as a building permit issued for the same construction permit.** CDD Staff Certification Date: Oct 6, 2016 CDD Staff: Jack Maker Payment Verification Zoning Compliance Permit Fee Paye in Cash Not Applicable Less than 1.75 acres: 1.76 to 5.00 acres: 5.01 to 40.00 acres: 40.01 acres or more: $0.00 ❑X $30.0() $60.00 $90.00 $120.00 Room # 104 - Main floor of Borough Building After -the -Fact 2X the published amount F $0.00 ❑ $60.00 OM Vl E] $120.00 —� E] $180.0PAI E] $240.00' OCT 0 6 2016 KODIAK ISLAND imiu GH FINAMP nFPAmmFNi S d LA3\i T -Ur-- 25.04' 6AS/S off• 5EARIA/0 6D' S 2' / / " E 9 17-3.23' a1-1 �j1