JACKSON MOBILE HOME TRACT SP 28 - ZCP 7/27/2016,r Kodiak Island Borough Print Form Submit by Email
Community Development Department
M1 "' 710 Mill Bay Rd. Rm 205
"^ Kodiak AK 99615
Ph. (907) 486 - 9363 Fax (907) 486 - 9396 21261
http://www.kodiakak.us
Zoning Compliance Permit Permit No. BZ2017-010
The following information is to be supplied by the Applicant:
Property Owner / Applicant: Manuel Santiago
Mailing Address: P.O. Box 410, Kodiak, AK 99615
Phone Number: (907) 539-2100
Other Contact email, etc.:
Legal Description: Subdv: Jackson's Mobile Home Tract Space 28 Block: Lot:
Street Address: 2682 Turner Lane, Kodiak, AK 99615
Use & Size of Existing Structures: Single -wide mobile home residence (MHR) with additions
Description of Proposed Action: Demolition to include demolition of MHR additions and transport of MHR to the landfill for disposal
and demolition.
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points,
and vehicular parking areas.
Staff Compliance Review: Current Zoning: R3 _ KIBC 17.85 PROP -11D 21261
Lot Area: 3,000 sq. ft. MH space
Front Yard: 25 '
Prk'g Plan Rvw? Not Applicable
Staff Compliance Review Notes:
Plat/ Subdivision Requirements?
KIB Fee Schedule.
Lot Width: 60'
Rear Yard: 10'
# of Req'd Spaces: 0
Bld'g Height:
Side Yard:
35'
5'
Fees related to removal of mobile homes from Jacksons Mobile Home Park are waived per
Subd Case No. Plat No. Bld'g Permit No. TBD by Building Dept.
Does the project involve NO
an EPA defined facility?
*Commercial buildings, installations (military bases),
institutions (schools, hospitals) and residences with
more than four (4) dwelling units.
Driveway N/A
Permit?
Septic Plan N/A
Approval:
Fire N/A
Marshall:
Proof of EPA notification provided (if required)? N / A
*Required for all demolitions, for renovations disturbing at least 160 square
feet 260 linear feet, or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and
for renovations that remove a load -supporting structural member.
No permit will be issued for such projects without proof of EPA notification
Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that)
have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Not Applicable
Date: Jul 27, 2016
List Other: N/A
Signature: Manu)tiag�il o wn
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
THIS FORM DOES NOTA UTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED.
**EXPIRATION: Any zoning compliance permit issued is subject to the same expiration, suspension, and revocation provisions as a
building permit issued for the same construction permit.**
CDD Staff Certification
Date: Jul 27, 2016 CDD Staff: Jack
Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building
After -the -Fact 2X the published amount
Not Applicable
F
$0.00
❑
$0.00
Less than 1.75 acres:
❑
$30.00
❑
$60.00
1.76 to 5.00 acres:
❑
$60.00
❑
$120.00
5.01 to 40.00 acres:
❑
$90.00
❑
$180.00
40.01 acres or more:
❑
$120.00
❑
$240.00