Loading...
NORTH PACIFIC FUEL TANK FARM TRACT - ZCP 6/6/2016Kodiak Island Borough Print Form Submit byEmail Community Development Department ^ 710Mil I Bay Rd. Rm 205 Kodiak AK9 615 Ph. (907) 486 - 9363 Fax (907) 486 - 9396 15842 ^ 5 lI{ 1 http://www.kodiakak.us Zoning Compliance Permit Permit No. CZ2016-066 The following information is to be supplied by the Applicant: Property Owner / Applicant: Petro Star Inc. dba North Pacific Fuel Kodiak Mailing Address: 3900 C Street, Suite 802, Anchorage, AK 99503 Phone Number: (907) 486-3245 Other Contact email, etc.: Lisa Lewis, Petro Star Inc. (907) 339-6630 Ivlewis@petrostar.com Legal Description: Subdv: Kodiak Townsite Block: 20 Lot: 1 Street Address: 715 Shelikof Street, Kodiak, AK 99615 Use & Size of Existing Structures: The property in its entirety is the site of an existing tank farm. The portion of the property that pertains to this Zoning Compliance Permit is currently unoccupied and partially undisturbed. The existing structure is a concrete vault with associated piping. Description of Proposed Action: Proposing site clearing and dirt removal, along with construction of a retaining wall and tank foundation in preparation for installation of 12,000 bbls diesel storage tank on the southeast portion of the lot. Access to the property for all construction activities will be achieved through an agreement with Alaska Pacific Seafoods. Please see additional description attached. Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: Industrial KIBC 17.105 PROP ID 15841 Lot Area: 1,2 acres Front Yard: Not Applicable Prk'g Plan Rvw? No Staff Compliance Review Notes: Lot Width: 75' Rear Yard: Not Applicable ## of Req'd Spaces: Bld'g Height: Not Applicable Side Yard: Not Applicable Plat/ Subdivision Requirements? Setbacks and building height requirements do not apply to this waterfront industry parcel. No parking plan is required for site preparation and construction of retaining wall and tank foundation. This Zoning Compliance Permit is for site clearing, dirt removal, and other site preparation activities (see attached narrative), as well as construction of a retaining wall and a foundation for the proposed tank. A Conditional Use Permit will be required before Zoning Compliance can be issued for construction of the proposed tank. Subd Case No. Plat No. Bld'g Permit No. Does the project involve NO Proof of EPA notification provided (if required)? N / A an EPA defined facility? "Required for all demolitions, for renovations disturbing at least 160 square 'Commercial buildings, installations (military bases), feet, 260 linear feet, or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and institutions (schools, hospitals) and residences with for renovations that remove a load -supporting structural member. more than four (a) dwelling units. No permit will be issued for such proiects without proof of EPA notification Driveway N/A Permit? Septic Plan N/A Approval: Fire TBD Marshall: Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan List Other: Site Preparation Work Plan Narrative A Date: Jun 6, 2016/ Signature: Lisa V. Lewis This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED. ** EXPIRATION: Anyzoning compliance permit issued is subject to the some expiration, suspension, and revocation provisions as a building permit issued for the some construction permit.** CDD Staff Certification Date: Jun 6, 2016 CDD Staff: Sara Mason Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room k 104 - Main floor of Borough Building After -the -Fact 2X the published amount Not Applicable ❑ S0.00 ❑ $0.00 Less than 1.75 acres: ❑ $30.%LZ ❑ $60.00 1.76 to 5.00 acres: ❑ $60.00 ❑ $120.00 5.01 to 40.00 acres: ❑ $90.00 ❑ $180.00 40.01 acres or more: ❑ $120.00 ❑ $240.00 PAID ctigoLo5 JUN 00 2016 KODIAK iSLAND BOROUGH FINANCE DEPARTMENT PAYMENT DATE Kodiak Island Borough BATCH NO. 06/06/2016 710 Mill Bay Rd. 2016-00000500 COLLECTION STATION Kodiak, AK 99615 RECEIPT NO. CASHIER KODIAK, AK 99615 P" i�, ��I1_ (� 2016-00001142 RECEIVED FROM CASHIER PETRO STAR INC Cashier DESCRIPTION CZ -2016-066 715 SHELIKOF STREET KODIAK AK 99615 Zoning Compl I Zoning Compliance Permit 1 $30.00 Payments: Type Detail Amount Check 19065 $30.00 FIRST NATIONAL BANK ALASKA / MEMBER FDIC www Al 1 F ('SKA.COM is 1 2 5 2000601: 01320 31L, 3111 906 5 Total Amount: $30.00 Customer Copy Printed hv- Cashier Pane 1 of 1 06/06/2016 11.31.36 AM AW19065 89-6/,252 TERRY DAVIS JACKIE DAVIS ��� r(� PH. 907-486-4749 1325 LARCH ST. KODIAK, AK 99615 P" i�, ��I1_ (� i$ 3o.Oo ��I--- FIRST NATIONAL BANK ALASKA / MEMBER FDIC www Al 1 F ('SKA.COM is 1 2 5 2000601: 01320 31L, 3111 906 5 Total Amount: $30.00 Customer Copy Printed hv- Cashier Pane 1 of 1 06/06/2016 11.31.36 AM TANK 2016 PROJECT OVERVIEW Construction of a new 11,900 bbl welded steel fuel storage tank (Tank 2016) with internal floating roof, including required sitework, retaining wall at new tank location, concrete tank foundation, new mechanical fuel piping to connect new tank to existing fuelling system, required electrical including new level control/monitoring system at new tank. Initial project specifics for Tank 2016 include: TANK 2016 SITE PREPARATION PLAN Remove items as indicated on the site plan. Deliver the abandoned concrete structure and other construction demolition debris to the local landfill, provided this material is deemed inert waste material. Prior to removal of concrete structure, coordinate activity with property owner Petro Star, Inc. (PSI) and Kodiak Electric Association (KEA) to have utility pole secured. KEA will remove utility pole guy wire obstruction and re-route overhead low voltage service line. Contractor shall safely remove aboveground storage tanks as approved by PSI. The procedure for demolition, removal, transportation, and disposal of these tanks will meet local and state requirements for proper handling of potential hazardous waste. Remove portion of existing chainlink fence as required to install retaining wall and dispose of this material as directed by PSI. Re-route electric line on fence as stated in the Electrical Instructions. Remove portion of existing containment wall as required to perform the work. Abide by PSI requirements to restore existing containment during and after the work. TANK 2016 EXCAVATION AND DEWATERING PLAN Excavate soil and bedrock to the depth required on the drawings. Allow soils and rock fragments to be screened for petroleum hydrocarbons and segregate materials as directed by PSI. The procedure for removal, transportation, storage, or disposal of hydrocarbon -impacted soils will meet local and state requirements for proper handling of potential hazardous waste. De -water the excavation as required to perform the work. As required by PSI, the water shall be impounded to remove settleable solids and filtered to remove hydrocarbons in accordance with local and state water quality criteria. Discharge treated water to a drainage system approved by the regulatory agencies. ADDITIONAL INFORMATION FOR THE WORK PERMIT PSI estimates approximately 300 cubic yards of soil above the groundwater table to be removed from the site. Approximately 700 cubic yards of soil and rock are estimated to be removed from below the groundwater table. A soldier pile and timber lag retaining wall will first be constructed to a length of about 120 feet. The piles will be founded in 10 to 15 feet of bedrock, and subsequent to installation, the wall will retain 10 to 15 feet of overburden soils. The tank foundation will be a reinforced concrete ringwall. Loose soils beneath the tank footprint will be removed to a depth of approximately 10 feet to firm bedrock, and the bottom of this excavation will be flat upon firm bedrock. Imported structural fill will be used as a leveling course and to backfill around concrete footings. __ _ _ vl � o I p � � Jt • A 3 91 LO <211 _ A --T- O.H.E. AI. ��, Z � I _ o • 38RE w� np � I a N5� NI i n It I a l J /m o CL - O aw;n •�II�• 1 \ 61L �s µ 0 Q 3 l w� ICY S p3< UI o I �n\ � . 'I II f GUJ � filn I ILII I I 1 I f \ I w Y' I \ IAN 1 w�3 \ I I1 I I \\ — 3M .51s� \ I =\I II I z Z � g ; o m \ I $$ w g W LL rc \ I L \ 3;ec .sTs W i \ to "0� ���_ _� �Q � o O D o 0 I Y oQo y Z JYd rcw > Z d UQ W Li (n I o J 0 Y t - I Y o m W IMINIIIIIIIII �I v/ W __ _ _ vl � o I p � � Jt • A 3 91 LO <211 _ A --T- O.H.E. AI. ��, Z � I _ o • 38RE w� np � I a N5� NI i n It I a l J /m o CL - O aw;n •�II�• 1 \ 61L �s µ 0 Q 3 l w� ICY S p3< UI o I �n\ � . 'I II f GUJ � filn I ILII I I 1 I f \ I w Y' I \ IAN 1 w�3 \ I I1 I I \\ — 3M .51s� \ I =\I II I z Z � g ; o m \ I $$ w g W LL rc \ I L \ 3;ec .sTs W i \ to "0� ���_ _� �Q � o O D o 0 I Y oQo y Z JYd rcw > Z d UQ W Li (n I o J 0 Y t - I Y o m W �I v/ W __ _ _ vl � o I p � � Jt • A 3 91 LO <211 _ A --T- O.H.E. AI. ��, Z � I _ o • 38RE w� np � I a N5� NI i n It I a l J /m o CL - O aw;n •�II�• 1 \ 61L �s µ 0 Q 3 l w� ICY S p3< UI o I �n\ � . 'I II f GUJ � filn I ILII I I 1 I f \ I w Y' I \ IAN 1 w�3 \ I I1 I I \\ — 3M .51s� \ I =\I II I z Z � g ; o m \ I $$ w g W LL rc \ I L \ 3;ec .sTs W i \ to "0� ���_ _� In RP I.L � I 0 3 C W J W �W I u \ ONIOGG YdS d0! 03 'S311d qSq ONpVdS 03 U3 Y 1:191 N Z'99 13 d01 "Id Z ;,9 LL D o %CVdS 03 Vmnd Y i,Sl g� j5 In RP I.L � I 0 3 C a N �W In RP >M m Ul mm> amt �W I u \ ONIOGG YdS d0! 03 'S311d qSq ONpVdS 03 Y 1:191 N Z'99 13 d01 "Id Z ;,9 LL %CVdS 03 Vmnd Y i,Sl >M m Ul mm> amt R1 A 5� Q INH eh (n J � Q Q Q w / IIIA I _ O ~� -sCs e a 11 Z^ Zug zU� Y c,cn zo �IrJli u Z BYO � CL mHa38 O _� F- Lu Z F W _ F W Q a� a ¢ YY � Y O w Lu o H a W r F a r1% LLj d S d (Wld 711 1� 1n(AY1 335) d(1-N:ILLS NW(I100 1105 1N3W039W3 i,Sl-,Ol 'NIM ,91-,01 R1 n LL imill imil UI�IV 11)1111 o 1111101111 '1 A 5� Q INH eh (n J � Q Q Q w / IIIA I _ O ~� n LL imill imil UI�IV 11)1111 o 1111101111 '1 d V) 3 0 w U z w tt w w w i z A 5� Q U (n J � Q Q Q O N W J O ~� -sCs e a 11 Z^ Zug zU� Y c,cn zo �IrJli u Z BYO � CL mHa38 O _� F- Lu Z F W _ F W Q a� a ¢ YY � Y O w Lu o H a W r F a r1% LLj d d 711 1� d V) 3 0 w U z w tt w w w i z A 5� U ci Q w W J -sCs e a Z^ J �IrJli CL 0,61 CL mHa38 O _� F W _ F W WS � O w Fr W r d V) 3 0 w U z w tt w w w i z U Q w W J e Z^ J �IrJli CL CL mHa38 E d V) 3 0 w U z w tt w w w i z