Loading...
USS 2538A LT 6C EAST REZANOF - ZCP 4/26/2016Kodiak Island Borough Print Form Submit by Email Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 Ph. (907) 486 -ttp:/9www kodiakak u363 Fax (907) 86 - 9396 16200 h Zoning Compliance Permit Permit No. CZ2016-043 Subd Case No. Plat No. Bldg Permit No. TBD by Building Dept. The following information is to be supplied by the Applicant: Property Owner / Applicant: U.S. Fish and Wildlife/Agent by contract: Golden Alaska Excavating Mailing Address: 1011 East Tudor Road, Anchorage, AK 99503 Phone Number: (907) 786-3309 Other Contact email, etc.: Golden Alaska Escavating: gae@gci.net Legal Description: Subdv: U.S. Survey 2538A Block: Lot: 6C Street Address: 512 Mill Bay Road, Kodiak, AK 99615 Use & Size of Existing Structures: Multi -family dwelling (triplex) and four accessory buildings. Description of Proposed Action: Demolition of existing multi -family dwelling (triplex). Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: Public Use KIBC 17.130 PROP_ID 16200 Lot Area: 2.38 acres Lot Width: 60' Bld'g Height: 50' Front Yard: 25 ' Rear Yard: 10% width up to 25' Side Yard: 10% depth up to 25' Prk'g Plan Rvw? Not Applicable # of Req'd Spaces: Staff Compliance Review Notes: Plat / Subdivision Requirements? Any new use or buildings established on this parcel must be listed as a permitted, conditional, or temporary use for PL -Public Use Lands zoning and a site plane review must be completed and approved by the Planning and Zoning Commission prior to issuance of zoning compliance per KIBC17.130.020. Subd Case No. Plat No. Bldg Permit No. TBD by Building Dept. Does the project involve NO an EPA defined facility? *Commercial buildings, installations (military bases), institutions (schools, hospitals) and residences with more than four (4) dwelling units. Driveway N/A Permit? Septic Plan N/A Approval: Fire N/A Marshall: Proof of EPA notification provided (if required)? N / A *Required for all demolitions, for renovations disturbing at least 160 square feet 260 linear feet, or 35 cubic feet of Regulated Asbestos Containing Material (RACM), and for renovations that remove a load -supporting structural member. No permit will be issued for such proiects without proof of EPA notification Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Other Date: Apr 4, 2016 List Other: Contract, hazard assessment, hazard abatement plan Signature: Lori Ryser, Golden Alaska ExcavatingGZL� C �- This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. THIS FORM DOES NOTA UTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED. "EXPIRATION: Any zoning compliance permit issued is subject to the same expiration, suspension, and revocation provisions as a building permit issued for the same construction permit.** CDD Staff Certification Date: Apr 4, 2016 CDD Staff: Jack Maker Payment Verification Zoning Compliance Permit Fee Not Applicable ❑ Less than 1.75 acres: 1.76 to 5.00 acres: 5.01 to 40.00 acres: 40.01 acres or more: El ❑X le in Q4 ier's Office Room # 104 - Main floor of Borough Building After -the -Fact 2X the published amount $0.00 ❑ $0.00 $30.00 ❑ $60.00 $60.00 0 E]$120.00 vl ❑ $90.00 ❑ $180.00 ❑ $120.00 ❑ $240.0I 4, P R042O1 IX KODIAK ISLANU BOROUGH FINANCE DEPARTMENT PAYMENT DATE 04/04/2016 COLLECTION STATION CASHIER RECEIVED FROM GOLDEN ALASKA EXCAVATING DESCRIPTION US FISH AND WILDLIFE 512 MILL BAY RD Kodiak Island Borough 710 Mill Bay Rd. Kodiak, AK 99615 BATCH NO. 2016-00000365 RECEIPT NO. 2016-00000885 CASHIER Teresa Medina I I I -- PAYMENT CODE RECEIPT DESCRIPTION TRANSACTION AMOUNT Zoning Comp] Zoning Compliance Permit $60.00 CZ 2016 -014.31 --- Payments: Type Detail Amount Check 4534 $60.00 Total Amount: $60.00 Customer Copy 11 -------------------------------------------- -- - ----------------- ------------ ------- I Printpd hv- Teresa Medina paup 1 of 1 0410412016 09-50.-48 AM CONSTRUCTION LLC UNIS"T SUBCONTRACT AGREEMENT NO.: TC1305-006 THIS SUBCONTRACT AGREEMENT ("AGREEMENT") IS made effective and entered into as of the day of April 7 , 2014 by and between: (a) Tunista Construction, LLC, an Alaska limited liability company, located at 745 W. 4`h Ave., Suite 306 Anchorage, Alaska 99501 (hereinafter called "Contractor"); and (b) Golden Alaska Excavating, LLC (hereinafter called "Subcontractor"). Subcontractor's Address: Streetl: Po Box 8908 Street2: City, ST, Zip: Kodiak, AK 99615 Phone: 907-942-2747 Fax: 888-848-2913 E -Mail: rlryser@gci.net Designated Contact: Rick Ryser WITNESSETH: WHEREAS, the Contractor has entered into a Contract, (hereinafter referred to as "Prime Contract"), dated the 201h day of September , 2013 with US Fish and Wildlife Services (hereinafter called the "Owner"), for the construction of Kodiak National Wildlife Replacement Triplex Design/Build. F13PCO0250 (hereinafter called the "Project"), at Kodiak, Alaska; and WHEREAS, copies of the Prime Contract are on file in the office of the Contractor and are available for review by the Subcontractor; and WHEREAS, the Subcontractor desires to perform a portion of such Prime Contract. NOW THEREFORE, for and in consideration of the mutual covenants and agreements contained herein, Contractor and Subcontractor agree as follows: (In case the Subcontractor is a firm or corporation, the singular pronoun "he", "his", "your" or similar used herein shall be read accordingly.) Section 1 CONTRACT DOCUMENTS The term "Prime Contract" as used herein includes the contract and all the general, supplementary and special conditions, drawings, specifications, amendments, modifications and all other documents forming or by reference made a part of the contract between the Contractor and Owner. Subcontractor, by signing this Agreement, acknowledges that it has independently assured itself that all Revised June, 2013 EXHIBIT C INDEMNIFICATION FOR SUBCONTRACTOR'S PERSONNEL To the extent pennitted by applicable law, Subcontractor specifically and expressly waives any Immunity that may be granted it under the Washington State Industrial Insurance Act, Title 51 RCW. Further, the indemnification obligation under this subcontract shall not be limited in any way on the amount or type of damages, compensation or benefits payable to or for any third party under Worker's Compensation Acts, Disability Benefits Acts, or other Employee Benefits Acts; provided Subcontractor's waiver of Immunity by the provisions of this paragraph extends only to claims against Subcontractor by Contractor, and does not exclude, or extend to, any claims by Subcontractor's employees directly against Subcontractor. The undersigned hereby acknowledge that this agreement has been mutually negotiated in good faith between all parties. CONTRACTOR SUBCONTRACTOR Tunista ConstrujafiA, LLC ignatur Daniel Esl2arza Tint or 1ype Name President Title Acknowledged Revised June, 2013 32 Subcontract TUNISTA CONSTRUCTION, LLCr 745 W. 4th Avc., Suite 306 Tel: 1907) 646.2214 Anchorage, Alaska 99501 Contract Administration/Accounting wvrrr.tctcon.com $ — t4t CONSTfiUCT16K': LLC ft- c " L S ' SUBCONTRACT CHANGE ORDER Previous Change Orders (Net Amount) Pmicer. Change Order Number: Original Start Date: 4/7/2014 Kodiak Replacement Triples Change Order Date: 3/11/2016 Original Completion Date: 8/31/2015 Project Number. TC1305 155,337.00 Prime Contract Number: FI3PCO0250 ; Subcontract No: TC1305-006 Subcontract Date: 4/7/2014 Cost Reimbursable? (Yes/No) Yes Related Owner Change Order Mod 0007 Subcontractor NOTICE Golden Alaska Excavating PO Box M Ynu arc regnertrd to make die following change(s) to the referenced subcontract. Alf Kodiak Alaska 99615 prar isiars of said subroatrart, ereept as changed helow, are irrcorporared herein and are expressly ratrfird. It is expressly understood that all costs as applicable to fully complete the clunge(s) described herein are included (e.g., labor, materials, equipment, supplies. taxes, insurance, incidentals, cte.). Subeonlnctor accepts this adjuspuent as it final and complete equitable adjushnent in full accord and satisfaction of all past, present, and future liability origiaating under any clause in the Subcontract by re.-uan of the facts mW circumstances giving rise to this Subcontract Clunge Outer: GENERAL DESCRIPTION Or CHANGE ORDER (specific scope and pricing cle(ailed on following page): Demotish'I'ri-111cx located at 512 Mill Bay Rnad, Cleanup Contaminated Soil and Provide Asbestos Abatement SM'ices Specific Inclusions: See Scope or Wark (ifarp) Specific Exclusions: (if mty) Sec Scone of Work Original Subcontract Amount $ 15,000.00 Subcontract Period of Performance Previous Change Orders (Net Amount) $ 317,126.12 Original Start Date: 4/7/2014 Current Subcontract Amount $ 332,126.12 Original Completion Date: 8/31/2015 Net Amount of this Change Order 155,337.00 Net Change by this C.O.: Revised Subcontract Amount ; 487,463.12 Revised Completion Date: 4/15/-016 Completion of this oidet is to be conducted according to Tunisia Construction, LLC's, job progress schedule as updated. All rr_rtns and conditiws ofrhr nricinal Sr.,xrnurucr shall cwrtuwe in fdt (i rhe. Accepted by: TUNISTA,CO�RUCTION, LLC Signature: ' Daniel Esparza President Date: ? -7 Z �C Accepted by:LDEN A AlS,K,A EXACAVATING Signature: Z�Z' Print Name: Tide: Date: ?J 1 � �f [owl Lr2 TUNISTA CONSTRUCTION, LLC-'CONSTRUCTION-1( � ALIC 745 %11.4th Ave., Suite 306 Tel: (907) 646.2214 !� i, J i s T1 Anchorage, Alaska 99501 Contract AdministrationtAcccrinting v-W.-mcicon.com SUBCONTRACT CHANGE ORDER Scope and Pricing Page Project; Change Order Number. t G'IC),i tsf} Kodiak Replacement Triples Change Order Date: 3/11/2016 Project Numlicr: TC1305 Prime Contract Number: F13PCO0250 Subcontract No: TC1305-006 Subcontract Date: 4/7/2014 Detailed Changes to Scope and Phase Code I Description I rldditionti I Deductions I Proride supervision, labor, materials and equipment to perforin the work as described below to Demolish tripler located at 512 Hill Itay Road, approximately 4,900 SQ FT bitilding on one level, additionally, there are four (4) otabitildings located on the property totaling approximately 1, 200 SQ FT and 2- 500gallottfiie(ASTs.INCLUSIONS: Backfill and grade, topsoil replacement, 1tydroseeding, disposal fee, demno permit and logistics to conduct demolition. Standard good business practices will be conducted for envirmimental safety and recycle as mush materials as possible. PEXCLUSIONS: SIYPPP and Implementation. Change order it -ill incar additional mobilization and dentobilization fee. If contaminated soil is encountered, the cleanup will include labor, equipment, supplies and disposal of soil. Up to twelve (12) )U? -ds will be, [ $2000 per yard. Each additional yard after the first rtrelwe (12) will be larged at $1381 per yard. Contaminated Soil Removal Not To Exceed 5 Cubic Yards unent Scope: Remove 5,500 SF of build up Asbestos Roofing, 10 SF - ACAl lits front newer pitched roof, 10 SF - White putty frain Boiler stacks in anical roont, I - lot - ACAI gaskets, 100 - Mercury containing lights and r, 10 - Mercury containing thermostat, 1 - TC% P sample for any lend based farad in the building. Cost includes disposal costs, manifesting and EPA 99,000.00 $10,000 S 155,337.00 1 S NET AMOUNT OF ABOVE CHANGES S 155,337.00 PHASE I ENVIRONMENTAL SITE ASSESSMENT USFWS KODIAK TRIPLEX 512 MILL BAY ROAD KODIAK, ALASKA FOR U.S. FISH AND WILDLIFE SERVICES NOVEMBER 2012 -- i,v PkL -Tv DoC u Mfg R i a'Kq Pte) November 6, 2012 Mr. Dave Haynen Larsen Consulting Group 3710 Woodland Drive, Suite 2100 Anchorage, Alaska 99517 Phase I Environmental Site Assessment USFWS Kodiak Triplex Kodiak, Alaska URS Job No. 26221104 Dear Mr. Haynen: Attached, please find our Phase I Environmental Site Assessment (ESA) for the property located at 512 Mill Bay Road, Kodiak, Alaska (Site). This ESA presents the findings of our document review, site walk-through and interview reviews, as well as our conclusions and recommendations. The information provided in this Phase 1 ESA should also be coupled with the Hazmat Survey conducted by EHS-Alaska, under a separate report. The scope of services was performed and this ESA was prepared in accordance with URS' proposal, Tasks 1-7 dated August 30, 2012. We appreciate the opportunity to provide this service to you. Please call us if you have any questions or if we can be of additional service. Sincerely, URS Corporation Ryan Rapuzzi Project Manager E. Documentation and Analysis (Attached): Include all documentation for Parts A, B, and C above (e.g., detailed summary of site conditions; description of topography and other site features; list of records searched and findings; list of persons interviewed and comments; analysis; photos; etc.). Include conclusions by Environmental Contaminants Specialist, if any. F. Certification (Preparer sign one and only one of the following) 1. I certify that to the best of my knowledge, no hazardous substances or other environmental problems are present on this real property, and there are no obvious signs of any effects of such substances or problems. Signed Print Name Date Title 2. The surveyed real property, or a portion thereof, contains hazardous substances or other environmental problems as determined by the environmental site assessment. The owner of that real estate has cleaned up or will clean up the hazardous substances or other environmental problems to bureau specifications (documentation of the owner's commitment, ability, and plan to clean up the property is attached). A Level II or Level III Survey is not required. Signed Print Name Date Title 3. On the basis of the information collected to complete this form it is possible to reasonably conclude that there is a potential for hazardous substances or other environmental problems, or the effects of hazardous substances or other environmental problems, to be present on this real property. A Level II Survey is recommended A Level III Survey is recommended Signed Print Name Ry4^ A-fL'xj Date Title Frc�,j v+14r,cys� 4. On the basis of the information collected to complete this Survey it is possible to reasonably conclude that there is a potential for hazardous substances or other environmental problems, or the effects of hazardous substances or other environmental problems, to be present on this real property, but there is sufficient information documented to conclude that a Level II or III Survey is not necessary. The actual or 1 1111111 111 € �;� 1M a 3 Ila �:Ili rAl �� � 54$ a 2 , :1j%1 $ m. IM ll MIN .SAI 't _� 9 a lit "1 111 I'll � i j 11! A t% � loll 1;� Jill € gg �_�_ so Iii 'l all 1H, M il;M1 !1, 0 4 iI �s t 5 lit gill p, 2� Ell ;11 1> 1 j ilio 1iml j;j1 i t R� 11011P IR= A \ e__ V. B a y e m 00000 � y L. _ .N N 8\ G O N 4 Z m ��r" 7 p p $ 1AD as m 1 CA � !S p MOW �¢ a PRi''a;sg��n�SF� it a " a REGION 7 — KODIAK NWR�,� N RESIDENTIAL MULTIPLEX'�Jli ' '%t"�"TM EHS HAZARDS ABATEMENT- ��r" 7 U.S. FISH AND WHOLIFE SERVICE