Loading...
LAKESIDE 1ST BK 1 LT 8 - ZCPKodiak island Borough Community Development Department 710 Mill Bay Rd. Rm .205 Kodiak AK 99615 Ph. (907)486 - 9362 Fax (907) 486-9396 http://www.kodlakak.us Zoning Compliance Permit PrintForm i (`�Subrnit'by€m 21487 Permit No. B22013-064 1 Property Owner / Applicant: Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: Street Address: Use & Size of Existing Structures: The following information is to be supplied by the Applicant: Kodiak Island Housing Authority 3137 Mill Bay Rd., Kodiak, AK. 99615 907.486.8111 Subdv: Lakeside lst 2388 Beaver Lake Loop Rd. Block: 1 Lot: 8 Vacant Description of Proposed' Action: NSFR 1 storey @ 37' x 47' Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: R2 KIBC 17.80 PROP JD 21487 Lot Area: 7,200 Sq. Ft. Lot Width: 60' Bld'g Height: 35' Front Yard: 25' Rear Yard: 10' Side Yard: 5' & 10' Prk'g Plan Rvw? Yes ti of Req'd Spaces: Staff Compliance Review Notes: Plat / Subdivision Requirements? Corner Lot 'applies to side yard setbacks, **PLATTED GREENBELT MAY NOT BE ENCROACHED** Subd Case No. Plat No. Bldg Permit No. Does the project involve an EPA defined facility? Driveway Permit? Septic Plan Approval: Fire Marshall: If YES, do you have an EPA Return Receipt of Notification? "Permit will not be Issued until receipt is submitted to KIB" Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan List Other: Date: Jun 10, 2013 Signature: Leonard Martin for KIHA This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. ** EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit Is not commenced within 780 days from the date of issuance, or if the building construction or use is abandoned at anytime, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Explration.1997 UBC) per K►BC 17.15.060 A.** CDD Staff Certification Date: Jun 10, 2013 CDD Staff: Martin Lydic Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Of ce Room # 104- Main floor of Borough Building Not Applicable Less than 1.75 acres: 1.76 to 5.00 acres: 5.01 to 40.00 acres: 40.01 acres or more: jam. $0.00 • 530.00 r) 560.00 IT 590.00 IT 5120.00 After -the -Fad 2X the published amount Y PAID JUN 12 2013 El 50.00 ✓ 560.00 fl 5120.00 I: .5180.00 ❑ 5240.00 KODIAK ISLAND BOROUG FINANCE DEPARTMENT 9 , Gs .41 6?0,0(3-06-1. • Ise €3/40/ts (05. s --P-/ENeff 11P 4.060r !:5QH,Pt iPeef.c' r - ,otS4it- '?341".t. .{ OPLYg... ir 235:5 ' -- . .. , .. is . , ti -7-- -- l' If w 11, ' il Li , Ap ::k