Loading...
ALEUTIAN BK 13 LT 3 - Property CardOwner Mailing Permits s� / ,Yr Address . Rsb't rev - :384.6 4-K 9516,T Property Address � n r Liar LO keY Mita 130,t c (do Date Built Observed Physical Condition Exterior Interior Foundation BUILDING TYPE AND USE 4. EXTERIOR S- ingle - Double —Other _- # Stories Attic Finish Basement - Frame. _Concrete Block _Log 1. FOUNDATION Concrete Thick —Conc. Block Wood Posts - Skids Wood Sills Concrete Block Sheathing Kind Building Paper Insulation Kind Stucco - Siding Kind Shakes Bricktex Log Slab Log Siding _Metal Plywood 6. INTERIOR (Continued) 7. Floors (Continued) —Trim Kind Grade A G Floor Number Rooms Number Baths Basement 1st Floor FINISH Wood Concrete Bath Living Room Bed Room 2nd Floor 3rd Floor Attic B. HEAT Total # 5. ROOF 2. BASEMENT __ Partial x S.F. .Full Cribbed ,Concrete _.Outside Entrance — Rec. Room Size _Living Area Size — Fin Walls Kind — Fin Floor Kind Fin Ceiling Kind Flat _Goble Hip Other •Kind Shingle _Shakes Composition if Insulation Tar Paper Metal Built -up —Other Shingle Kind Kind 6. INTERIOR 3. FRAME J Walls _ - o.c. Bracing Roof a c Floor o c Ceiling o c Other Other Buildings Area Insulation Board Plasterboard Plaster Masonry W- ood Paneling Plywood - Finished Unfinished Open Stud Floor Roof Interior Grade of Floor Plan _P _A ___G Ceiling Height Basement 1st Floor 2nd Floor _Attic Grade of Kitchen —, P _A _G Oven Built -in —Range Built -in Bath Room Finish Attic Stairway ., iJ .Attic Unfinished Attic Useful % Number Dormers Shed Type Size Gable Size _Stove _Oil Furnace Coal Stoker _Hot Water _Hot air Forced Radiant Space Heater Kind —711/4— Floor Furnace .._Number of Chimneys _Kind NUMBER OF FIREPLACES Basement _1st Floor Type 9. PLUMBII4. —Water Source Sewer Source 10. ELECTRICAL Wired Grad '220 Service . TOTAL GRADE 11. GARAGE 9. PLUMBING 7. FLOORS 1st Floor o c Bridged Post Size . o c Beam Size o c. 2nd Floor o c Heat Plumb Unit Cost # Tubsw /shower # Toilets # Basins _# Kitchen Sinks —# Shower Stalls_ _# Hot Water Tanks # Gollons Kind Grade 12 PORCHES 13. YARD IMPROVEMENTS _# Laundry Trays _Total Number Fixtures Adds & Deducts Rep1. Cost Age Condition Building Cost BUILDING VALUE CALCULATION OPERATIONS AND PROCEDURES BUILDING AREA CALCULATION item No. Area or Quantity Unit Cost Total Performed By Date Square Feet — Ground Area Inspection Floor or Part Width Length. Area Classification Calculation Review DEPRECIATION AND OBSOLESCENCE DEPRECIATION ADDITIONS AND DEDUCTIONS a. Effective Age Depreciation Notes: b. Observed Physical Condition c. Total Depreciation (a -4 b) % Perimeter Scaje1" d. Net Condition (10 0 - c) OBSOLESCENCE e. Overimprovement f. Underimprovement g. Other h. Net Condition (100 - (e+ f +g) i. FINAL NET CONDITION (d x h) % SUMMARY OF APPRAISED VALUE Principal Building Appraisal Other Principal Buildings Appraisal Accessory Buildings Appraisal Total Replacement Cost Cost Conversion Factor Adjusted Replacement Cost Total Building Appraisal Total Lond Apraisol TOTAL APPRAISED VALUE $ • (7-- KIBS271064 Other Description: 1,, 3 t3J/3 433-t' /DzA 14 237 Size: /y Az/ /. h• is 3.4 3 S fI. 3,i W x'9..54 Valuation Code: - Area: 7'Z Land Use: t]`, . ia,S32 c� 1b7�ft- Use Zone: !j'' z , Unit Price: • ,q0- INFLUENCES: ', -PLUS MINUS Depth r • Land Bldgs. Topography , /9 ,'i A/ea /00 - IlitiA e A /4 e Irregular Modification ! .. 0 c,.l View 2194:5 I41eui-ia I ova, c ` �• —A S N. A. Drainage - ;i.5 Physical Barriers Qi4. 9 �. _5_ Access • '5/4- 5--6 dOWQ Corner X9'7 ,, /dor A/G to? f4 -- ,_- /.i•S —f% Water /- ,.14 & rJ .9W6' s3bo Sewer `---' sgoe Sidewalk Paving 1 /r . ' Curb & Gutter 3 j 1Q— &7 4yKz.Q Lt.._ I4sIT/9 —C' Other C1414si,.n .� O �O TOTAL v f� e: /j Net -i- ( —) Year of Valuation: %9,,,( _ /9, Y'(C Basic Land Value —` - -e Plus or (Minus) Factors — Net Price 'of Land gQ Remarks: '/. /WA — 'Fro /..7 -6, • ,/ -/ G - 7 ./ r, 12/40z Cb b2- w/ LT %) 1 cm" Gt.x pe-ctiOett - LAND VALUE YEAR OWNER ASSESSED VALUATION . REASON FOR CHANGE Land Bldgs. Total /9 ,'i A/ea /00 - IlitiA e A /4 e Ji 0 ,a 2194:5 I41eui-ia I ova, c ` �• —A S N. A. :23.9"g - ;i.5 Qi4. 9 �. _5_ — '5/4- 5--6 dOWQ /9/e X9'7 ,, /dor A/G to? f4 -- ,_- /.i•S —f% ' r ,.14 & rJ .9W6' s3bo sgoe %z G' &7 4yKz.Q Lt.._ I4sIT/9 J .� O �O ry a- yL 197A .l) 4 s' le4- 6o -- SA o (e2q' SDb f973 OR484Ir2 9/ AkytuR AE kr.P_ s/i60 -- £g"bo /?7Y /44,74 4460 /1f "/X /%s /i'Al 6a )V -- C--.2 711r .z1 4/�GS-3f 12.D /� ,f/' / y2 S' ic)_e_>.�,c «.v (X e-+ i, ° (3)1 .P1 �.6 9/96 — - 9 /Fe 1161‘7. kiln /l,`am s, Pon4 f fl4 / /%s si ,, g/.9 — qiy, , , l ?70. (,,}, (Yams Pd t/d F s /1(5 An 4/90 -- 97 90 . --' `s- 1g79c )oaf karacLi 0P , /poc _ 12,20 1�i - , with :. 45 //1.; .4-zw 3‘e -- Asa, ill' S-I ,va/d¢- f i / /a6),.,.,., g_36n ile 3 bo /Y8c 60,ti 2ci.m6 .?rr ln2o(4 }- . Ann /35'30 - /s51,1-0 j 3 , \J NA, e, ms , \ ` z, `" � Zliw' aozld} — R Snu RiSA \ �1,V\ sn57 Rth\AMA 4 W k0.v- S)6+11\ coo — ;tee I (Mu -1 19)us., i& v -Pt> / J . in, ,c /6-0 "--- 30) eSeZ REMARKS PICTURE /-1.12.604,4e / .4.d a %%1�%r0.4,�� !/� // 6L 42r---- ®W / /fig ^�./2) PLACE PICTURE HERE poa a3doaaTV (Modes- C.+ t.4.„) 92 yoozv L-n/ Y it1UBS271063 'ijricx .-ihNtek, 1G* T nr (f M MT P PQI3 Oct-15 X5 • WM 1 -,ft ' IV OWNER Land 8I00. row FOE Cr&ANC( /fen. s .l 5'5 %d -- a5rsooy\ i i ' +h • • ,° • . _ , s 1.' I E P YU..,4 A. _ +1 _ 5 ►v • ' � •ta 1q`) -' Er .l '1 5 5o�o 5,-00 h as, — ?Sszz2 '1990 , ri ,, ie S*61 2,S,SCil ...,„. ZS ScO et 6 { di .3- ); c40.,_ ' / 6- ,L,,,i,K J/t / 11/ j o2�U7C> — J�.L'> Hi c=1 23 ,f i /9q / 1 �i�� f9- o //i€ 015_, ,6ina( R-/'lryll;s, (� tv/,�`r� Tru5f- -a `�i!�! — .iS" 0 4� 0 : ra . _,39 2 -e.3 "Q1 '- -4't40) - 2P40 '� LJ Z15,9oo .- — Z819ao .. �Iciouo 1991 '' ,- 1/ ' ir Z$, 5co _. _ 2.a Ica Y-199 „ " 21,10() — 28.900 a. '' ; 00 38,goO - - aiS ab',Q0cD - jcicfct 900D ,' ' 38, q 0o - o., �_Rt3btna g,cInect -� .2c -- `Re-) DD 3WD 2 1g 7 ?ew 61/Da ,, „ . 8.9c9 — ...?1F-0 a9 ' b.' _ k 0` Q3'02) — ..q-3,m9 23Lrr , Cv KiBS271062 _..,.■ " A 25000 r r 747_, — " A . /04- -TN' ZASEMEN ' LOT-5 103 i-hrL4 11 . 3D. 14G. 6001< 12 , ON R f O P-GET L?SK1),!E T P, /0afc4L 47 o .,., /uf5 /4 RR /02 J76.4 -A- 1rmr 1 1 arrnrimminwirarrrenimtmur PP L1Ti�iTY inrrrrnrrr trD�rr *rrrrnrrrnrrrnrrrnrrrrr '/8 U I I_ I McHr f35-8sf 5_3 r + 4' Cr1ArN ur+ . 4-, • l71O s. r tV y a h 1 V \ Ave -1a f1 /o4 f 4 r-///:5 /s Ai- cap y a 04 vr l7►tU - �t. 1f- bk O/ P7i TrNi<s ,gu,<45.414 ti �CGJA/4 61'047 CA- [r rs 245) KODIAK ELECTRIC ASSOCIATION, INC. P.D. Box 787, Kodiak, Ak . TR�GT A // 89 KV Transmission Line Swampy Acres to Main Substation KEA Work Order No. 3867 4‘..../1., Right-of-Way Parcel No.-c=i75 –it (from Ecklund's sheets 1 thru 7 of 7) a4.IP EAsE-in ."-7VT Wept, it ;� pw , USL g$LE , BUlLDAFSL.E- PEaP � j Kodiak Island Borough P.O. BOX 1246 KODIAK, ALASKA 99615 -1246 PHONE (907) 486 -5736 Mrs. Phyllis A. Williams P.O. Box 4171 Mountain View, CA 94040 Dear Mrs. Williams: February 15, 1985 Re: Lots 1, 2, and 3, Block 13, Aleutian Homes Subdivision. Thank you for your letter dated January 26, 1985. Since that time I have met with Mr. Jenks and discussed development alternatives on your property given the additional easements required by K.E.A. for the new 69 k.v. electrical transmission lines. It became apparent after our discussion February 13, 1985 that the maximum development that could occur on all your lots is the construction of a duplex structure on a combination of Lots 2 and 3. The remainder of Lots 1, 2, and 3 may be utilized for parking or other non - structural uses. Because only a small area of building space will remain on Lot 2 after meeting the minimum borough setback requirements as well as granting additional easements requested by K.E.A., it may be practical to incorporate the area of Lot 2 with the space of Lot 3. By doing this, the normal side yard setbacks required along the common lot line between Lots 2 and 3 can be abated (see drawing). Replatting of Lots 2 and 3 into one lot is not required by borough code, but construction of a duplex may then occur anywhere in the red hatched area of the map. Mr. Jenks will be contacting you with similar information. I have included a copy of the notes taken by Mr. Jenks during our discussion describing your options. These may help explain your options. Should you have additional questions, please call. Sincerely, pct �4 a' Bud Cassidy Assistant Planner /Zoning Officer Community Development Department pb cc: Property File Robert Jenks La% /c,-ncJc