KADIAK AK UNIT 1A - ZCP 4/6/2015Kodiak Island Borough Print Form Submit by Email
#, Community Development Department
710 Mill Bay Rd. Rm 205
A Kodiak AK 99615
Ph. (907) 486 - 9363 Fax (907) 486 - 9396 23986
http://www.kodiakak.us
Zoning Compliance Permit Permit No. CZ2015 -058
The following information is to be supplied by the Applicant:
Property Owner / Applicant: University of Alaska (Kodiak College)
Mailing Address: 117 Benny Benson Drive, Kodiak, AK 99615
Phone Number: (907) 486 -4161
Other Contact email, etc.:
Legal Description: Subdv: Kadiak Alaska, Unit 1A Block: Lot:
Street Address: 117 Benny Benson Drive, Kodiak, AK 99615
Use & Size of Existing Structures: College Campus
Description of Proposed Action: Remove and replace siding on Campus Center building.
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points,
and vehicular parking areas.
Staff Compliance Review:
Lot Area: 50.1 acres
Front Yard: 25'
Current Zoning: Public Use
Lot Width: 60'
Rear Yard: 25'
Prk'g Plan Rvw? Not Applicable # of Req'd Spaces:
KIBC 17.130
PROP_ID 23986
Bld'g Height: 50'
Side Yard: 25'
Staff Compliance Review Notes:
Plat/ Subdivision Requirements? No change to existing off - street parking requirement. Hazardous Materials Assessment shows
that no asbestos materials were identified in old siding.
Subd Case No. S13 -007 Plat No. 2014 -9 Bldg Permit No. TBD
Does the project involve
an EPA defined facility?
Driveway N/A
Permit?
Septic Plan N/A
Approval:
Fire N/A
Marshall:
NO If YES, do you have an EPA Return Receipt of N/A
Notification?
"Permit will not be issued until receipt is submitted to
Applicant Certification: 1 hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that 1
have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Other List Other: Hazardous Materials Assessment
Date: Apr 6, 2015 Signature: Orville Gilman III (for Wolverine Supply Inc // Univ AK)
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED.
** EXPIRATION. A zoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, anew permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 17.15.060 A. **
CDD Staff Certification
Date: Apr 6, 2015 CDD Staff. Martin Lydick �I t
Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Rodm # 104 - Main floor of Borough Building
After - the -Fact 2X the published amount
Not Applicable F $0.00 r— $0.00
Less than 1.75 acres: j— $30.00 \� V F- $60.00
1.76 to 5.00 acres: j— $60.00 F- $120.00
5.01 to 40.00 acres: r $90.00 r $180.00
40.01 acres or more: (X $120.00 PAID F- $240.00
APR ® 6 2015
KODIAK ISLAND BOROUGH
FINANCE DEPARTMENT
Permit No.
Block: Lot.
Ili BtAT4 %enSb., �n%if K�i�t. w/ NR
IS k ' uo Is rJVc IG11
U- L �GI 'h+l 1nTll -- �Zr iu} j
Description of Proposed Action: 7 k i5 ��A'► I '� U i i 1 rJ� Tor �L? JU —n
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points,
and vehicular parking areas.
Staff Compliance Review: Curmnt7aning: PROP-11)
Lot Area: Lot Width: eld'g Height:
Front Yard: Rear Yard: Side Yard:
Prk'g Plan Rvw? 0 of Req'd Spaces:
Staff Compliance Review Notes:
Plat/ Subdivisian Requlrements7
5ubd Case No, Plat No. Bld'g Permit No.
Kodiak Island Borough
Community Development Department
-'k
710 Mill Bay Rd. Rm 205
- `
Kodiak AK 99615
Ph.(907) 486 - 9363 Fax(907)4B6-9396
httri://www.kodiakaic-us
Zoning Compliance Permit
The following Information Is to be suppl
Property Owner / Applicant: OAA r_ C' �r- 0iR I
MallingAddress*
9$G O nlVtrsi k,
Phone Number:
aU71- -4 "i - �`z jII
Other Contact email,
(-
etc.: S6C1GUlt5 0--) iJvc�. til +tiS
Legal Description:
Subdv:
Street Address:
} S
+' p 1p L
/i � � l-
Use & Slze of Existing
Structures: �N1 v5 11'f T,
Permit No.
Block: Lot.
Ili BtAT4 %enSb., �n%if K�i�t. w/ NR
IS k ' uo Is rJVc IG11
U- L �GI 'h+l 1nTll -- �Zr iu} j
Description of Proposed Action: 7 k i5 ��A'► I '� U i i 1 rJ� Tor �L? JU —n
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points,
and vehicular parking areas.
Staff Compliance Review: Curmnt7aning: PROP-11)
Lot Area: Lot Width: eld'g Height:
Front Yard: Rear Yard: Side Yard:
Prk'g Plan Rvw? 0 of Req'd Spaces:
Staff Compliance Review Notes:
Plat/ Subdivisian Requlrements7
5ubd Case No, Plat No. Bld'g Permit No.
Does the project involve
an EPA definedfaciGty?
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
if YES, do you have an EPA Return Receipt of
Notification?
"Permit will not be issued until rCceipt Is submitted to
Applicant Certification: i hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that l
have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable
cornermarkers In place for verification of building setback (yard) requirements.
Attachments? List Other.
Date:
5lgnature:
This permitis only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT 15 REQUIRED.
**EXPIRATION: A zoning compliance permit will become null and void lfthe building or use authorized bysuch permitis not
commenced within 7BO days from the date ofissuance, orifthe building construction oruse is abandoned at anytime, after the
workis commencedr for aperiad of 780 days Before such work can be recommenced, a newpermitmust first be obtained. (Sec.
106.4.4 Fmplration. 1997 UBQ per KIBC 17.15.060 A."*
CDD Staff Certification
Date: COD Staff
Payment Verification Zoning Compliance Permit Fee Payable in Cashier`s Office Room 4104- Main Floor of Borough Building
After - the -Fact 2X the published amount
Not Applicable
❑
$0.00
rl
$0.00
Less than 1.75 acres:
[
$30.00
❑
$60,00
1.76 to 5.00 acres:
$60.00
❑
$120.00
5.01 to 40.00 acres:
r
$90.00
j❑
$180.00
40.01 acres or more:
J
$120.00
❑
$240.00
HAZARDOUS MATERIALS ASSESSMENT:
ASBESTOS
Campus Center, Kodiak College
117 Benny Benson Drive
Kodiak, Alaska 99615
FEBRUARY 20, 2015
Prepared for:
Wolverine Supply Inc.
5099 E. Blue Lupine Drive
Wasilla, AK 99654
Prepared by:
Project 15 -1040
Accounting Office
2400 College Road 3105 Lakeshore Dr, Ste A106 5438 Shaune Dr, Ste B
Fairbanks, Alaska 99709 Anchorage, Alaska 99517 Juneau, Alaska 99801
p. 907.452.5688 p. 907.222.2445 p: 907.586.6813
f. 907.452.5694 f. 907.222.0915 f: 907.586.6819
www.nortechengr.com
Managing Office
1623 Mill Bay Road, Ste 5
Kodiak, Alaska 99615
p: 907.942.7700
f: 907.452.5694
ICI OWN% SUSTAINABLE ENVIRONMENT, ENERGY,
HEALTH & SAFETY PROFESSIONAL SERVICES
1.0 EXECUTIVE SUMMARY
NORTECH Environment, Energy, Health & Safety Consultants ( NORTECH) presents this
limited Hazardous Materials Inspection Report to Wolverine Supply, Inc. as part of the Kodiak
College Campus Center re- siding project in Kodiak, Alaska. NORTECH performed an asbestos
containing building materials (ACBM) assessment of the building exterior including visual
inspections and sampling. The following is a synopsis of the Background and Scope of Work,
Field Activities with Discussion, Sample Results and discussion, and Conclusions and
Recommendations.
Based on the site inspection and subsequent sample results, the following materials of concern
were identified:
Asbestos containing building material: None identified
2.0 BACKGROUND AND SCOPE OF WORK
Wolverine Supply Inc. contracted NORTECH to provide an asbestos assessment prior to a
campus building exterior re- siding project (University of Alaska Anchorage Kodiak College Re-
Siding Phase 3 - Campus Center).
NORTECH's scope of work was to provide a limited hazardous material assessment of all
existing building siding materials prior to adding new siding. The hazardous material inspection
scope of work included asbestos inspection and sampling with reporting of inspection and
sampling results.
The standard methodology of this scope of work is attached in Appendix A. The fieldwork was
executed in general accordance with this methodology.
3.0 FIELD ACTIVITIES
Ryan Sharratt of NORTECH completed the hazardous material assessment fieldwork on
February 16, 2015.
Three samples were collected of suspect asbestos - containing building material (ACBM). All
samples were sent by overnight courier on a standard chain of custody with request for
expedited services to White Laboratories of Anchorage, Alaska for Polarized Light Microscopy
(PLM) analysis.
4.0 SAMPLE RESULTS AND DISCUSSION ASBESTOS
Asbestos was not detected in the tested materials. Laboratory sample results are included in
Appendix B.
5.0 CONCLUSIONS AND RECOMMENDATIONS
Based on the hazardous material assessment the following conclusions and recommendations
have been developed for the replacement of exterior vent framing.
• No asbestos was detected from the siding of the subject building
Page 11
NORTECH
6.0 LIMITATIONS AND NOTIFICATIONS
15 -1040 Asbestos Assessment
Kodiak College, Kodiak, Alaska
February 2015
NORTECH performed the work, developed the associated findings, and proposed the
recommendations in this report using the standard of practice available at the time the work was
performed.
This report is a record of observations and measurements made on the site as described. The
data should be considered representative of the site only at the time investigation was
completed. Conclusions and recommendations are based on NORTECH's current
understanding of laws, agency regulations, and consensus standards.
NORTECH provides a level of service that is within the standard of care and competence found
in the industrial hygiene practice and the environmental engineering profession. If changes in
the regulations, standards, or agency interpretations occur, NORTECH reserves the right to
amend or revise the conclusions and /or recommendations in this report.
If you have any questions or require additional professional services or advice, please let us
know. We thank you for the opportunity to work with you on this project and appreciate your
confidence in our firm.
6.0 SIGNATURES OF ENVIRONMENTAL PROFESSIONALS
1 Z4--tl�
Jason Ginter, CEA
Principal, Juneau Technical Manager
Ryan Sharratt, CSP
Industrial Hygienist
Appendix A: Hazardous Material Assessment Methodologies
Appendix B: Asbestos Laboratory Analysis Report
Appendix C: Photos
Page 12
NORTECH
15 -1040 Asbestos Assessment
Kodiak College, Kodiak, Alaska
February 2015
Appendix A
HAZARDOUS MATERIAL
ASSESSMENT METHODOLOGIES
Objective and Management
NORTECH hazardous materials assessment methodologies are developed to comply with
currently applicable regulations utilizing standard industrial hygiene practices designed for the
anticipation, recognition, evaluation and control of those factors or stressors arising in or from
the workplace, which may cause sickness, impaired health and well- being, or significant
discomfort among workers or citizens of the community. Qualified personnel with current
certifications and experience conduct field assessment inspection and sampling efforts. All work
completed was managed, reviewed and signed off by a board Certified Industrial Hygienist
(CIH) or Professional Engineer.
Scope of Work
NORTECH provides a variety of hazardous material services as necessary to meet project
specific needs cost effectively. In order to minimize costs NORTECH has developed the
following standardized hazardous material assessment scopes of work.
Limited Hazardous Material Assessment: The assessment scope of work is limited to
specifics as specified by the Client in the written contract and /or project communications.
Limitations may include /exclude contaminants, destructive testing, costs and /or areas to
be assessed.
Definition of Hazardous Materials
Hazardous materials are defined as any material requiring special handling or disposal during
demolition or renovation. Of particular interest are asbestos containing building materials
(ACBM), lead based paint (LBP), RCRA eight Heavy Metals and Other Hazardous Materials
including polychlorinated biphenyls (PCBs), radioactive materials in smoke detectors, lead acid
batteries, wastewater, water intrusion fungal amplification, petroleum oils and lubricants (POLs)
mercury containing equipment (switches, bulbs etc.) and other chemical and biological
contaminants.
Regulatory
The hazardous material surveys are conducted to comply with the asbestos survey
requirements of the Occupational Safety and Health Administration (OSHA) found in 29 CFR
1926. These regulations state that, before authorizing or allowing any construction, demolition,
renovation, or remodeling, the owner or owner's agent, or employer, must notify contractors or
other persons of the location and quantities of ACM within the work area.
U.S. Environmental Protection Agency National Emissions Standards for Hazardous Air
Pollutants (NESHAP) requires a thorough inspection for friable and non - friable ACM by an
accredited Asbestos Hazard Emergency Response Act (AHERA) inspector prior to any
renovation or demolition activity (40 CFR 61.145). NESHAP also requires notification for
removal or abatement of regulated quantities of ACM ( >260 linear feet, >160 square feet, or >35
cubic feet of regulated asbestos containing material (RACM)).